A19 AIP Lab Floor Plan.pdf

PDF 1 MB Posted

Attached to
Temperature Monitoring System
Solicitation number
75D301-24-Q-78239
Issued by

About this file

This document appears to be a floor plan for the A19 AIP Lab. The key details are:

The floor plan shows the layout of the first floor of the existing building, including the location of existing equipment, walls, doors, and other features. There are notes indicating that all new partitions should be type A.A, and that all dimensions in the existing building need to be verified in the field by the contractor. The plan also references an elevation of 100'-0" for the first floor, which corresponds to 177'-0" for the first floor concrete slab per the structural drawings.

This floor plan appears to be associated with a federal contract opportunity for a Temperature Monitoring System, solicitation number 75D301-24-Q-78239, issued by the Department of Health and Human Services Centers for Disease Control and Prevention Office of Acquisition Services. However, the floor plan itself does not contain any details about the specific products or services required under this contract opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N.5

P.6

0.5

--1

KEYNOTES

NUMBERS SHOWN IN HEXAGON (D

1. FOR CASEWORK ELEVATION SEE 1/A404.

2. EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT.

3. EXISTING W.AJ..L MOUNTED EQUIPMENT MONITORING DEVICES.

4. EXISTING ELECTRICAL EQUIPMENT.

5. METAL LADDER W/ LADDER ASSIST POST (FULL HOGHT TO ROOF

HATCH)

6. PAINT INFILL PANEL TO MATCH EXISTING. NEW RUBBER 8115[

ALONG ENTIRE NORTH WALL OF V[Sl C1-N23C.

7. ALIGN CORRIDOR FACE Of NEW 4" PARTITION W/ CORRIDOR FACE

OF EXISTING 6" PARTlTION (OEMO'D).

24 25 26 27

PLN<

,ORTH

@ ,[s.~~.?a.R PLAN - FIRST FLOO~~· 16' I E9

NOTES

1. EXISTING flRST FLOOR REFERENCE ELEVATION Of

100'-0" CORRESPONDS TO THE SAME ELEVATION OF

THE NEW AOOmON. REFERENCE ELEVATION OF

100'-Q" CORRESPONDS TO ELEVATION 177'-0" FOR

THE FIRST FLOOR CONCRCTE SLAB SHOWN ON

STRUCTURAL DRAWINGS.

2. All NEW PARTITIONS TO BE TYPE A.A, UNO.

3. ALL 011-iENSIONS IN THE EXISTING BUILDING TO BE

VERIFIED IN THE FIELO BY THE CONTRACTOR.

LEGEND

• NO WORK IN THIS SHADED AREA

==== EXISTING WALL

= NEW WALL

/\ EXISTING DOOR

1\ NEW DOOR OR OPENING

G- EMERGENCY SHOWER/EYEWASH

~ NEW WINDOW

NEW SINK

NEW AND EXISTING EQUIPMENT (SEE A401 FOR

EQUIPMENT CALL OUTS)

----0

----0

ARCHITECTS

~ 1~···-.=~ &i,'G'STREEl,SOOE.tO(I

~~!i~ -----

FINAL

CONSTRUCTION

DOCUMENTS

z 2co ~:s > ... oo z:;;:

wa.. a: ..

mo :5~

• Cl)

a. "o' :« d::

(.J (.J cc (.J (.J

DATE 2010.03.22

PROJECT NO: 0993 1

DRAWN BY BA.HH/BBA

CHECKED BY: JMT

COPYRIGHT

SHEET DESCRIPTION

FIRST

FLOOR PLAN

DWG NO:

A104

"SBU-BI•

uzt1 Highlight

File details come from the government source that posted it. Updated .