Amendment 00002.pdf
PDF 130 KB Posted
- Attached to
- Battery UPS Replacement Federal contract opportunity
- Solicitation number
- 75D301-20-R-67980
About this file
This document contains an amendment to a solicitation and questions and answers related to a federal contract opportunity for battery uninterruptible power supply (UPS) replacement. The Centers for Disease Control and Prevention (CDC) is seeking to replace several UPS units at the Roybal Campus that are nearing end of service life or do not meet life safety standards. The amendment provides answers to vendor questions to clarify requirements. The battery UPS replacement opportunity involves a woman-owned small business set-aside with an estimated price range between $1,000,000 to $5,000,000. A pre-proposal meeting was scheduled for June 18, 2020 and a single award firm fixed price contract for one year is anticipated. Responsible women-owned small businesses are encouraged to submit offers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00001.pdf | ||
| Drawings.pdf | ||
| Site Photos 1.zip | ZIP file | |
| A9 Past Performance.docx | DOCX document | |
| A10 HazMat.docx | DOCX document | |
| A1 SOW.pdf | ||
| A11 Bid Bond.pdf | ||
| 75D301 20 R 67980.pdf | ||
| A8 Wage Determination GA20200126.pdf | ||
| A12 General References.docx | DOCX document | |
| A14 Project Experience.docx | DOCX document | |
| A13 Deliverables_LmtOnSubconRpt_REQD.xlsx | XLSX spreadsheet | |
| A15 _Contractor_Visit_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
00002
3. EFFECTIVE DATE
07/07/2020
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 8219 7. ADMINISTERED BY (If other than Item 6) CODE 8219
Centers for Disease Control and Prevention
(CDC)
Office of Acquisition Services (OAS)
2900 Woodcock Blvd, MS TCU-4
Atlanta, GA 30341-4004
Centers for Disease Control and Prevention (CDC)
Office of Acquisition Services (OAS)
2900 Woodcock Blvd, MS TCU-4
Atlanta, GA 30341-4004
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
X
9A. AMENDMENT OF SOLICITATION NO.
75D301-20-R-67980
9B. DATED (See Item 11)
06/02/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (See Item 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGMENT
TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to answer questions provided by prospective vendors
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY ___________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE 30-105 Prescribed by GSA
FAR (48 CFR) 53.243
ITEM 10A.
75D301-20-R-67980 00002
Battery UPS Replacement Questions
2. Per the specification, the arc flash study needs to be updated after the installation of the new UPS’s. Can you please provide the contact information of who provided the most recent study as it would be easiest for them to update?
Answer: Susan Pandey of Hood Patterson Dewar typically revises, updates and provides updates to CDC campus buildings short-circuit, coordination, and arc-flash studies. Susan can be reached at spandey@hoodpd.com or at a minimum, she can provide a point of contact within Hood Patterson Dewar that will be assigned for revisions and updates.
3. Do you require that the NETA Technician be there for the total duration of 12-hour load test of each UPS, or can the NETA technician be present at the start of the test & then the end of the test?
Answer: Refer to Section 26 33 53, Paragraph 3.2.2 Initial Inspections and Tests and Section 26 33 53, Paragraph 3.2.3 Performance Tests. NETA ATS acceptance tests are required to be provided in accordance with Paragraph 3.2.2. Paragraph 3.2.3 provides an opportunity to utilize a NETA Technician to accomplish meeting some requirements of Paragraph 3.2.2. However, the contractor must decide how to utilize NETA
Technician and accomplish requirements set forth within the specifications. It is not CDC’s intent to provide means and methods of how to schedule personnel.
4. Per Statement of Work, Section 6 – Special Requirements, Paragraph #4, Liebert is one of two manufacturers that are acceptable to provide UPS’s for this project. After reading over the specifications, Liebert has discovered that they do not have a 120kva or 60kva UPS that will meet the specs. They are asking if they can provide a 100kva instead of a 120kva and a 50kva instead of a 60kva.
Answer: It is understood that not all manufacturers will be able to provide the “exact” kVA/kW as stated in the SOW. It is CDC’s intent the kVA/kW closely match or is greater than existing UPS units. Liebert’s
UL 924/1778 100kVA (highest rated) and 50kVA UPS units are acceptable provided they can sufficiently supply the existing load plus an additional 25% spare capacity for future load. In the event 100kVA unit cannot supply the existing load plus the additional 25% spare capacity, the contractor will be required to supply a 120kVA or greater UPS unit. In the event 50kVA unit cannot supply the existing load plus the additional 25% spare capacity, the contractor will be required to increase the UPS unit to a 75KVA.
5. Section 26 33 53, Paragraph 2.14 – Factory Tests, Item (b), will the government witness the factory testing at the factory in Columbus OHIO?
Answer: Due to the COVID-19 pandemic and internal travelling concerns, CDC will not be witness factory tests. However, the contractor must meet requirements as set forth within Section 26 33 53, Paragraph 2.14 – Factory Tests.
6. Section 26 33 53, Paragraph 2.4.7 - AC Output, Item (m), states 125% continuous. No UPS is capable of providing 125% continuously. Can this spec. requirement be removed?
Answer: Provide per Section 26 33 53, Paragraph 2.4.7 - AC Output, Item (m).
******************************End of Amendment 00002*******************************