75977- Performance Work Statement (PWS) 8 Oct 2024.pdf

PDF 273 KB Posted

Attached to
Laser Vector Preventative Maintenance and Calibration Federal contract opportunity
Solicitation number
FA857125Q0016
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide preventative maintenance and calibration services for laser vision vector measuring machines and tube benders located at Robins Air Force Base, Georgia.

The contractor shall provide all necessary materials, parts, travel, tools, and labor to perform two on-site preventative maintenance and calibration services per year for three laser vision vector measuring machines, as well as one annual on-site preventative maintenance service for six VB-series tube benders. The contract has a 12-month basic period of performance with four 12-month option periods. The first preventative maintenance and calibration services shall be completed within 30 days of contract award. The government has identified the incumbent vendor, NUMALLIANCE-NORTH AMERICA, INC., as the intended sole source for this opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Laser Vector Preventative Maintenance and Calibration, newest first.
File Type Posted
75977-CDRL A001-Calibration Certificate.pdf PDF
75977-CDRL A002 - Status Report_EMS Training.pdf PDF
Solicitation - FA857125Q0016.pdf PDF
75977-CDRL A003- Status Report_EnMS Training REV.pdf PDF
75977-CDRL A004-Safety Plan.pdf PDF
SSJ_Redacted.pdf PDF
75977-Safety Appendix C - Laser Vector Preventative Maintenance and Calibration.pdf PDF
75977-CDRL A005-Accident-Incident Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Laser Vector Preventative Maintenance and Calibration

8 October 2024

1.0 DESCRIPTION OF SERVICES. The Contractor shall provide all materials, parts, travel, tools, and labor necessary to provide preventative maintenance, and calibration services for three (3) Laser Vision Vector Measuring Machines and provide as scheduled preventative maintenance for six

(6) VB-series Tube Benders) located in building(s) 140 and 323 for the 402d Commodities Maintenance Group (CMXG) at Robins Air Force Base, Georgia.

CMXG Equipment Identifier

Model Number Serial Number

WR000391 Laser Vision Optima XP VT LVO UPG 860865 XP

WR003048 Laser Vision Series 5 XP VT LV S5 UPG 860967 XP

J028622 Laser Vision Series 5 VT LV S5 860291

WR005624 VB-19 #1 J237377

WR005532 VB-19 #2 J239962

WR005531 VB-42 J237378

WR005530 VB-80 J237379

WR004963 VB-110 861300

WR004964 VB-152 861301

Table 1: Equipment

1.1 Laser Vision Preventative Maintenance and Calibration Services Certificates. The

Contractor shall schedule and perform two (2) on-site preventative maintenance and calibration of the Laser Vision Vector Measuring Machines (6 months apart), with the first visit occurring within 1 (one) month of contract award. The Contractor shall contact the Government Representative listed in paragraph 4.1 to schedule the date and time to perform the preventative maintenance and calibration services. At the completion of the preventative maintenance and calibration services, the Contractor shall provide a preventative maintenance and calibration services certificate with the completed preventative maintenance and calibration services date to the POC for all components that have been calibrated. The Contractor shall also provide one and one (1) electronic PDF of all preventative maintenance and calibration services certificates for each piece of equipment within five (5) after completion. (CDRL A/B/C/D/E001, DI-QCIC- 80798C/T, Preventative Maintenance and Calibration Services Certificate).

1.2 Tube Bender Annual Scheduled Preventative Maintenance. The contractor shall schedule and perform one (1) annual on-site preventative maintenance service visit on the VB-series tube benders listed in Table 1. The preventative maintenance work shall include all OEM-recommended tasks including but not limited to those laid out in Table 2. The contractor shall also inspect the software and drivers to make sure the control system is in proper working order with no issues. At the completion of the work, the contractor shall provide an electronic report of work performed and the results in PDF format.

LINES AND HOSES

A. Inspect all hydraulic lines and hoses for leaks and security. Tighten or replace as necessary B. Inspect filters for service indicator light.

(RED) Filters replace if light is on. PN. 0160

D 005 ON

High pressure filter. PN 8TZ10 Return filter

FILTER

A. Check indicator on front right side of bender. If popped clean as necessary

HYDRAULIC CYLINDER

A. Inspect all cylinders for leaks. Repair as necessary

HEAT EXCHANGER FINS

A. If applicable remove cover grid and clean fins

CONDENSATION BOWL

A. Drain water from condensation bowl as necessary

SYSTEM RESERVOIR

A. Lube system reservoir P-50. Item

9150PHM00342264

LUBE

A. Mandrel gibs and slides P-64. Item

9150PHM00318567

LUBE

A. Spur gear and linear rack P-64. Item

9150PHM00318567

B. ACME screws P-64. Item

9150PHM00318567

LUBRICATION:

A. Check level of the automatic machine lube reservoir. (P-35) B. Check level of the inline air oiler. (air motor oil) C. Spur gear and linear rack.(P-64) D. Carriage linear slide bearings.(P-64) E. Pump motor. (P-64) F. C-Axis gearbox. (P-35)

SAFETY

A. Test all emergency stop switches B. Test safety interlock door. If applicable C. Test front protection zone safety equipment

INSPECT:

A. Inspect and clean all fans. Ensure vent and cooling airways are clear for the passage of air B. Inspect wires for wear, looseness, overheating, and other damage C. Console and keyboard D. Inspect motors

HEAT EXCHANGER FINS:

A. If applicable remove cover grid and clean fins

CONDENSATION BOWL:

A. Drain water from condensation bowl as necessary

LUBRICATION:

A. Lube pressure die grease fittings. (P-64) B. Lube pressure die boost grease fittings.

(P-64) C. Lube mandrel extractor guide. (P-64)

LUBRICATION:

A. Lube carriage spur gear B-Axis drive. (P- 64)

Table 2: VB-110 PM Schedule-Example Preventative Maintenance Actions

1.3 Acceptance Test. The Contractor, under supervision from the Government POC, shall conduct acceptance testing at the completion of the service to ensure the preventative maintenance and calibration is completed. The testing shall include a visual inspection and operational test to verify proper working condition.

1.4 Period of Performance and Options. The contract period of performance shall include a basic 12 months beginning upon contract award. The Contractor shall provide four (4) annual options to begin upon completion of the basic period of performance.

1.5 Over and Above Work. Any work discovered during the course of contract performance that is:

1.4.1 Within the general scope of the contract, not covered by the line item(s) for the basic work under the contract, and necessary in order to satisfactorily complete the contract.

1.4.2 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.

2.0 SERVICES SUMMARY (SS).

3.0 GOVERNMENT FURNISHED PROPERTY (GFP). None – there is no GFP attachment for this acquisition.

4.0 GENERAL INFORMATION.

4.1 Government Representatives. The following individuals will serve as the Primary and

Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for CMXG. Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

The following individuals will serve as Government Representatives for CMXG.

Primary Government Representative Alternate Government Representative Name: Alexander Grosskopf Name: Jacob Barry Unit: 402 CMXG/MXDEE Unit: 402 CMXG/MXDE Phone: (478)-222-4071 Phone: (478)-222-4070 Email: alexander.grosskopf@us.af.mil Email: jacob.barry@us.af.mil mailto:alexander.grosskopf@us.af.mil mailto:jacob.barry@us.af.mil

4.2 Shipping/Delivery. Within (5) days after contract award, the Contractor shall contact the Government POC to schedule the preventative maintenance and calibration. The Contractor will ship their own Calibration tools. The Contractor shall provide a basic 12 month and four (4) annual options periods. The first preventative maintenance and calibration should be completed within the first 30 days after contract award.

4.3 Ship To Address.

Attention: Alexander Grosskopf Unit: 402 CMXG

DODAAC: FA2082

Address: 455 First Street, Bldg. 140, Robins AFB, GA 31098

4.4 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.

4.5 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building(s) 140 and 323 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 6:00 am to 10:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel and will provide a 48-hour notice prior to changing any work hours.

4.6 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.7 Security Requirements.

4.7.1Government Security Regulations. Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Department of the Air Force Instruction (DAFI) 31-101, Integrated Defense.

4.7.2 Contractor Security Clearance. This requirement does not require a security clearance. The Contractor shall ensure Contractor personnel have a valid security clearance appropriate to the access required for proper accomplishment of contract/order requirements. Contractor personnel shall not be authorized access to classified and/or sensitive, but unclassified, information and/or materials or be permitted to work on classified and/or sensitive, but unclassified, projects and/or programs without a proper security clearance and a need-to-know. Contractor personnel whose clearances have been suspended or revoked shall immediately be denied access to classified and/or sensitive, but unclassified, information.

4.7.3 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 2 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).

4.7.4 Foreign Nationals must meet the requirements of DoDM5200.02 DAFMAN 16- 1405, Air Force Personnel Security Program, prior to access.

4.7.5 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short-term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).

4.7.6 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.

4.7.7 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.

4.7.8. Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:

DoDI5000.83 DAFI 63-113, Technology and Program Protection to Maintain

Technological Advantage

SAE Aerospace Standard AS5553D, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev 5, Security and Privacy Controls for Information Systems and Organizations

4.8 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.

4.9 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number: Commercial 478-222-1972.

4.10 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.10.1 In accordance with FAR 23.107-1, the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

4.11 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) and the Contract Surveillance Management Office (CSMO) POCs to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.

4.11.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478- 926-8178.)

http://www.biopreferred.gov/ mailto:78ceg.cev.FrontOfc@us.af.mil

4.11.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f

Search for Course ID: EMS110UHHZ00293 Directions:

1. Hover your mouse over the Courses and Transcripts tab.

2. Click on Transcripts

3. Click into the TEACH Course Completion Log by clicking the orange Continue or

Begin button.

4. When you are on the transcript, click on the blue “Search for Course” button.

5. When the pop up appears enter the course name or course number and press search.

6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.

(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)

4.11.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training. (CDRL A/B/C/D/E002 DI-MGMT-80368A/T, Status Report/EMS Training)

4.12 ISO 50001 – Energy Management System. Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

4.12.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.

4.12.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to joseph.santillan.2@us.af.mil, daniel.makley@us.af.mil, and william.west.1@us.af.mil.

4.12.2. Notification of training completion shall be sent to the Energy Assurance Office (joseph.santillan.2@us.af.mil, daniel.makley@us.af.mil, and william.west.1@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract. (CDRL A/B/C/D/E003 DI-MGMT-80368A/T, Status Report/EnMS Training)

4.13 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP).

All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:78ceg.cev.FrontOfc@us.af.mil mailto:joseph.santillan.2@us.af.mil mailto:daniel.makley@us.af.mil mailto:william.west.1@us.af.mil mailto:joseph.santillan.2@us.af.mil mailto:daniel.makley@us.af.mil mailto:william.west.1@us.af.mil http://www.osha.gov/dcsp/vpp/index.html responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.

4.13.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A004, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).

4.13.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.

4.14 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)327-4862 during duty hours and (478)926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), CSMO Representative (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Impound Authority Name and Phone Number (as applicable)

g. Nomenclature of equipment and personnel involved in accident/incident

h. Corrective actions (taken or proposed)

i. Other pertinent information (CDRL A/B/C/D/E005, DI-SAFT-81563 NOT 2, Accident/Incident Report) mailto:402mxw.se.wf@us.af.mil

4.15 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76, Continuation of Essential Contractor Services.

4.16 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

4.17 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:

https://piee.eb.mil/

5.0 APPENDICES. None.

https://piee.eb.mil/

File details come from the government source that posted it. Updated .