About this file

This is an Addendum No. 2 for a state contract opportunity issued by the Michigan Department of Technology, Management and Budget (DTMB) for the Mackinac Island East Bluff Retaining Wall Replacement project. The project involves replacing an existing retaining wall on Mackinac Island, with work including protecting utilities, clearing, wall removal, fence removal, asphalt removal, adjusting structures, constructing a new modular block retaining wall, installing drainage, backfilling, grading, placing asphalt, and restoration. The project is divided into two phases: Phase I with substantial completion by December 19, 2025, focusing on reopening the road for winter, and Phase II with substantial completion by May 20, 2026, including final grading, HMA paving, and restoration. The bid opening is scheduled for May 21, 2025, at 2:00 pm ET, with a mandatory pre-bid conference required for site examination.

The addendum introduces Alternate 1 for soils compaction testing, which will be conducted by the contractor as required in section 312000 Earth Moving, while geotechnical inspection will still be performed by the owner. The bid summary includes a schedule of unit prices for various items such as rock and earth excavation, modular blocks of different types, and backfill. The project is a lump sum contract with unit prices provided to assist bidders in developing their total bid. A performance bond and payment bond are required for bids over $50,000, and each bid must be accompanied by a 5% bid guarantee. The owner reserves the right to negotiate unit prices or contingent change order prices prior to incorporating them into the contract documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

DATE: Friday, May 16, 2025

PROJECT: Mackinac Island East Bluff Retaining Wall Replacement

DTMB FILE NO.: 751/23180.ABG

OWNER: MI DTMB / Mackinac Island State Park

BID DATE: Wednesday, MAY 21, 2025 ** THIS ADDENDUM DOES NOT CHANGE THE

BID DATE

The following shall be incorporated into the Contract Documents dated 23 APRIL 2025.

GENERAL

PROJECT MANUAL

See attached revised pages from the Bid Summary for the addition of alternate 1. The alternate has been added for soils compaction testing as required in section 312000 Earth Moving to be by the contractor.

Geotechnical inspection will still be conducted by the owner if this alternate is accepted.

End of Addendum No. 2

Bidding and Contract Document (R 03/25) Mackinac Island East Bluff Retaining Wall Replacement File No. 751/23180.ABG

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

751/23180.ABG

DEPARTMENT/AGENCY

Mackinac Island State Park Commission

CONTRACT TIME(S)

Phase I – December 19, 2025, Substantial Completion Phase II (HMA) – May 20, 2026, Substantial Completion Final Completion for Phase I & II – June 19, 2026

PROJECT NAME

Mackinac Island East Bluff Retaining Wall Replacement

LOCATION

Mackinac Island, MI

BID OPENING DATE

Wednesday, May 21, 2025, at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE CONTACT:

Attend Mandatory Prebid Conference

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE

WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

____________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate 1: (Add/Subtract) ______________________________________________________Dollars $____________________ (use words) (in figures)

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE

CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work: The project includes but not limited to: protecting existing utilities, clearing, removal of existing retaining wall, removal of existing fence, removal asphalt, adjusting structures, providing footing for new modular block retaining wall, constructing retaining wall, installing drainage, backfill, grading, placing asphalt, restoration and associated SESC measures as noted in the plans and indicated in the Contract Documents. Phase I will include all work necessary to reopen the road for the winter other than Hot Mix Asphalt (HMA) paving, including supplemental gravel and grading as necessary to make the road satisfactory to the owner. Phase II will include final grading, gravel removal or supplementation, HMA paving, and final restoration.

The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:

Bidding and Contract Document (R 03/25) Mackinac Island East Bluff Retaining Wall Replacement File No. 751/23180.ABG

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid Quantity

Description

Unit Price

Item Bid

1 Soils Compaction Testing

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid Quantity

Description

Unit

1 Per CYD Excavation, Rock

2 Per Each Modular Block, R-41

3 Per Each Modular Block, R-60

4 Per Each Modular Block, FS-T

5 Per CYD Backfill, Structure, CIP

6 Per CYD Excavation, Earth

Refer to the plans for anticipated quantities. They are included to assist you in developing unit prices and a total lump sum bid, but remain for reference only. Final measured rock excavation quantity that varies from the anticipated quantity on the plans will be added or subtracted from the contract at the unit price. For the other unit prices, if the retaining wall is installed to the size shown on the plans, since it is a lump sum project, slight variations in the quantities for those items will not be added to or subtracted from the contract. Additional “Excavation, Earth” will only be paid for if the planned bottom of excavation as it is currently shown on the plans is determined to have unsuitable soils and the Geotechnical Engineer requires them to be removed to create a suitable bearing surface.

See sections 31 20 00 Earth Moving and 32 32 23 Segmental Retaining Walls for further details on measurement requirements of each unit priced item.