751.22438.ABG_TFSP ARPA II&M Lower Falls Well & Water Distribution System_ProjectManual.pdf

PDF 4 MB Posted

Attached to
751/22438. ABG; TFSP Lower Falls - Well & Water Dist. Sys.
Solicitation number
RFQ 171 240000000500 2
Issued by
Alger County, Michigan

About this file

This is a project manual and bidding document from the Michigan Department of Technology, Management and Budget (DTMB) for the Department of Natural Resources, issued for the Tahquamenon Falls State Park Lower Falls Well & Water Distribution System project located in Paradise, Michigan. The project scope includes abandonment of the existing water distribution system and two existing wells within the Hemlock Campground, installation of two new wells, installation of new directionally drilled water distribution lines, replacement of well house equipment and electrical systems, replacement of jug fillers, replacement of service connections to the Contact Station, replacement of shutoff valves at the Lower Falls sanitation station, and replacement of an existing underground pressure relief valve near the Portage Campground with a new above-ground unit and enclosure. A mandatory pre-bid meeting and site inspection will be held on Tuesday, June 11, 2024, at 9:00 a.m. EST at the project site. Bids are due electronically through the SIGMA VSS system by Wednesday, June 26, 2024, at 2:00 p.m. ET. Contract Times specify Substantial Completion by June 20, 2025, with critical operational requirements for wells and water distribution connections by April 18, 2025, and Final Completion by July 25, 2025. Liquidated damages are assessed at $1,000 per calendar day for delays beyond the Substantial Completion date.

Bidders must submit a five percent (5%) bid security in the form of a certified check, cashier's check, money order, or bid bond. A Performance Bond and Payment Bond are required for contracts exceeding $50,000. The project is funded through ARPA II&M (American Rescue Plan Act Infrastructure, Improvement & Maintenance) and subject to prevailing wage requirements under both federal Davis-Bacon Act standards and Michigan prevailing wage law. Bidders must complete the Bid Summary Form, Bid Schedule, Qualified Disabled Veteran certification (if applicable), Michigan-based business certification, and post-bid submittals including Experience Modification Rating, project superintendent identification, and references for similar projects. A 10% veteran's preference applies to Qualified Disabled Veteran bidders. The apparent low bidders will be evaluated for responsiveness and responsibility based on compliance with specifications, financial resources, technical capabilities, experience, past performance, insurance and bonding capacity, and business integrity. Questions must be submitted by June 19, 2024, at 2:00 p.m. ET to the project contact at OHM Advisors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

TAHQUAMENON FALLS

STATE PARK

LOWER FALLS WELL &

WATER DISTRIBUTION

SYSTEM

DEPARTMENT OF TECHNOLOGY,

MANAGEMENT AND BUDGET

DTMB FILE NO. 751/22438.ABG

PROJECT NO. 7136-22-0133

Date: May 30, 2024

DTMB-0415 (R 10/22)

PROJECT ADVERTISEMENT

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN & CONSTRUCTION DIVISION

This form is required for the advertisement of all construction projects. (1984 PA 431)

DTMB FILE NO. 751/22438.ABG DATE

May 30, 2024

ADVERTISEMENT DATE

May 30, 2024

BID DUE DATE

Wednesday, June 26, 2024, @ 2:00 p.m.

EASTERN time

PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)

Tahquamenon Falls State Park Lower Falls Well & Water Distribution System 41382 W. M-123, Paradise, Michigan 49768

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION

A mandatory prebid meeting will be held at the project site located at 41382 W. M-123, Paradise, Michigan 49768 on Tuesday, June 11, 2024, at 9:00 a.m. EST time.

Mandatory Yes X No

NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.

DESCRIPTION OF WORK: The project consists of abandonment of the existing water distribution system within the Hemlock Campground, abandonment of the two existing Lower Falls wells, installation of two new wells located within the Hemlock Campground, installation of new directionally drilled water distribution lines within the Hemlock Campground, replacement of well house equipment and electrical, installation of new well house mechanical equipment, replacement of jug fillers within the Hemlock Campground, replacement of the service connection to the Contact Station, replacement of shutoff valves at the Lower Falls sanitation station and replacement of the existing underground PRV near the Portage Campground with a new above ground PRV and enclosure as well as other associated work as indicated in the Contract Documents.

Please NOTE:

• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.

• Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)

•• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.

SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.

•• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov

• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

• Bid Responses should not be emailed to the Project Director.

5% Bid Security: Required Not Required

NIGP CODES: 90976, 91060, 91200, 91216, 91240, 91244, 91356, 91360, 91389, 91392, 91275, 98852

ACCEPTING QUESTIONS UNTIL: Wednesday, June 19, 2024

Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Zane Hyrkas at zane.hyrkas@ohm-advisors.com no later than 2:00 p.m., Eastern on Wednesday, June 19, 2024.

Documents may be obtained from: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfServi ce

PSC/Agency: OHM Advisors Address: 424 Hancock Street, Hancock, MI 49930

Phone: 906-482-0535 Email: taylor.nettell@ohm-advisors.com

Approved by:

mailto:zane.hyrkas@ohm-advisors.com https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:taylor.nettell@ohm-advisors.com

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

State of Michigan Department of Technology, Management and Budget

State Facilities Administration Design and Construction Division

DCSPEC

Bidding and Contract Document Minor Projects

File No. 751/22438.ABG

Department of Natural Resources Tahquamenon Falls State Park Lower Falls

Well & Water Distribution System Paradise, Michigan 49768

May 30, 2024

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

751/22438.ABG

DEPARTMENT/AGENCY

Department of Natural Resources

CONTRACT TIME(S)

Substantial Completion: June 20, Final Completion: July 25, 2025

PROJECT NAME

Tahquamenon Falls State Park Lower Falls Well & Water Distribution System

LOCATION

Paradise, Michigan

BID OPENING DATE

Wednesday, June 26, 2024, at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE CONTACT:

Attend Mandatory Prebid Meeting

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE

WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

____________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate 1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Alternate 2: (Add/Subtract) ______________________________________________________ Dollars $ ____________________

Alternate 3: (Add/Subtract) ______________________________________________________ Dollars $ ____________________

Alternate 4: (Add/Subtract) ______________________________________________________ Dollars $ ____________________

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE

CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

The project consists of abandonment of the existing water distribution system within the Hemlock Campground, abandonment of the two existing Lower Falls wells, installation of two new wells located within the Hemlock Campground, installation of new directionally drilled water distribution lines within the Hemlock Campground, replacement of well house equipment and electrical, installation of new well house mechanical equipment, replacement of jug fillers within the Hemlock Campground, replacement of the service connection to the Contact Station, replacement of shutoff valves at the Lower Falls sanitation station and replacement of the existing underground PRV near the Portage Campground with a new above ground PRV and enclosure as well as other associated work as indicated in the Contract Documents.

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ___

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

BID SCHEDULE

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description

Unit Price

Item Bid

1 1 Project Scope

ALLOWANCE AMOUNT $50,000

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

__________________________________________________________________ Dollars $__________________________

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid

Item Bid Price

1 1 LSUM Deductive Alternate: Replace Curb Stops at Hemlock

Campground Sanitation Station

2 1 LSUM Deductive Alternate: PRV Removal and Installation near

Portage Campground Entrance

3 1 LSUM Deductive Alternate: Hemlock Campground Distribution

Watermain and Jug Fillers

4 1 LSUM Deductive Alternate: Well No. 2 Installation

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid

Item Bid Price

1 10 LF Watermain, 3 inch

2 10 LF Watermain, Directionally Bored, 3 inch

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design & Construction Division

Qualified Disabled Veteran (QDV) Business Representation

‘Qualified Disabled Veteran,’ means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.

‘Qualified Disabled,’ means a business entity that is 51% or more owned by one or more with a service-connected disability.

The vendor represents that it IS _____, a qualified disabled veteran.

The contractor represents and warrants that the company meets the above (when checked) and has attached supporting documentation per the following:

Each bid requesting the Qualified Disabled Veterans (QDV) preference, in accordance with Public Act 22 of 2010, MCL 18.1241.3 shall include a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.

Fraudulent Certification as a Qualified Disabled Veteran may result in debarment under MCL 18.264.

Certification of a Michigan Based Business

(Information Required Prior to Contract Award for Application of State Reciprocity Provisions)

To qualify as a Michigan Based Business:

Vendor must have, during the 12 months immediately preceding this bid deadline:

or If the business is newly established, for the period the business has been in existence, it has:

(Check all that apply):

Filed a Michigan single business tax return showing a portion, or all the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax Act, 1975 PA 228, MCL 208.1 – 208.145:

or

Filed a Michigan income tax return showing income generated in or attributed to the State of Michigan; or

Withheld Michigan income tax from compensation paid to the bidder’s owners and remitted the tax to the Department of Treasury; or

I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.

I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.

Bidder shall also indicate one of the following:

Bidder qualifies as a Michigan business (provide zip code: ________________)

Bidder does not qualify as a Michigan business (provide name of State: _____________).

Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code: (___________).

Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 § 268. A BUSINESS THAT PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF BUSINESS IS GUILTY OF A FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.264.

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

BID BOND

BID SUBMITTED ON the _______ day of ________________, 20____.

Bid Security is in the form of a Bid Bond _______ Bid Bond form has been duly executed _______; or

A Bank Certified or Cashier's check ___ or Money Order ___ is attached to this page ____ (If Bid Security is by Check or Money Order, the original check or money order must be delivered to the issuing office before Bid Due Time. ALL other SIGMA bid submittals are also still to be made).

If the Bidder is an Individual:

Name of Individual: _________________________________________________________

Name & Title of Person Authorized to sign: ___________________________________________

Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date

Doing Business as: _________________________________________________________

Business Address: _________________________________________________________

County of registration _________________________

Telephone: _________________________ FAX: ______________________

If the Bidder is a Partnership:

By: _________________________________________________________ (True Name of the Partnership)

Partner Authorized to Sign Date

Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date

Business Address: _________________________________________________________

County of registration _________________________

Telephone: _________________________ FAX _______________________

If the Bidder is a Corporation:

By: _________________________________________________________ (Legal Corporation Name)

Name & Title of Authorized Officer: __________________________________________________

Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date

Name & Title of Officer Attesting: __________________________________________________

Signature: _________________________________________________________ Date

Business Address: _________________________________________________________

Telephone: _________________________ FAX _______________________

(State of Incorporation): _________________________________________________________

If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES MUST BE AS PROVIDED IN INSTRUCTIONS TO BIDDERS.

EACH JOINT VENTURER SIGNING THE BID MUST SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF REGISTRATION

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

POST-BID SUBMITTALS

The PSC will request this submittal after bid opening. Complete and submit these items within two business days after the request.

BIDDER’S EXPERIENCE MODIFICATION RATING (EMR) ____________

Attach letter of explanation if the Bidder does not have an EMR.

PROPOSED PROJECT SUPERINTENDENT _______________________________

Attach brief resume or list of similar successful projects.

LIST OF SIMILAR PROJECTS COMPLETED BY THE BIDDER

Please list at least three completed projects of similar size and complexity to the project being bid, with reference contact information

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

POST BID SUBMITTALS: LIST OF SUBCONTRACTORS

The Apparent Low Bidder shall nominate for each Division of Specification and/or trade category, the Subcontractor to be awarded Sub-agreements, including the apparent Low Bidder if work is to be self-performed. Nominated subcontractors shall not be removed, replaced, or added to except by written request for good reason, subject to Owner acceptance.

Division, Specification Section Nominated Amount of Subcontract and/or Trade Subcontractor(s)

1.________________________ _________________________ __________________

2.________________________ _________________________ __________________

3.________________________ _________________________ __________________

4.________________________ _________________________ __________________

5.________________________ _________________________ __________________

6.________________________ _________________________ __________________

7.________________________ _________________________ __________________

8.________________________ _________________________ __________________

9.________________________ _________________________ __________________

10._______________________ _________________________ __________________

11._______________________ _________________________ __________________

12._______________________ _________________________ __________________

13._______________________ _________________________ __________________

14._______________________ _________________________ __________________

The undersigned Apparent Low Bidder _____________________________________________________________ certifies that all the information and data furnished in this List of Subcontractors are current, accurate and complete as of the date stated below.

Signed by:____________________________Name_______________________________ Title ________________________ on this __________ day of ____________________, 20_______.

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

PERFORMANCE BOND

SURETY COMPANY REFERENCE No. __________________________________

That "the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.

The Contractor has entered into "the Contract" with the Owner for _______________________________________________ _______________, "the Work," covered by the Contract Documents, which are incorporated into this Performance Bond by this reference.

If the Contractor faithfully performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of the Contract Documents within the Contract Time (including any authorized changes, with or without notice to the Surety) and during the Correction Period, and if the Contractor also performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of any and all duly authorized modifications of the Contract Documents, then THIS

OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL

FORCE AND EFFECT.

A. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision) releases the Surety of its obligations under this Section 00610 Performance Bond. The Surety expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision).

B. This Performance Bond must be solely for the protection of the Owner and its successors, legal representatives or assigns.

C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to General Conditions and this Performance Bond). However, this Performance Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Performance Bond is/are illegal, invalid, or unenforceable, all other provisions of this Performance Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.

IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.

Name, Address and Telephone of the Surety: Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan

Signed and sealed this __________ day of _______________________, 20_____.

THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________

WITNESS ______________________________ Name & Title: __________________________________________________

Telephone No. _________________________________________________

THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________

WITNESS ______________________________ Attorney-in-Fact: ________________________________________________

Telephone No. _______________________________________________

Email:. _____________________________________________________

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

PAYMENT BOND

SURETY COMPANY REFERENCE No.___________________________________

“the Contractor,” ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and “the Surety,” ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, “the Owner,” as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.

The Contractor has entered into “the Contract” with the Owner for _____________________________________________ __________________, “the Work,” covered by the Contract Documents, which are incorporated into this Payment Bond by this reference.

If the Contractor promptly pays all claimants supplying labor or materials to the Contractor or to the Contractor’s Subcontractors in the prosecution of the Work, then THIS

OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL

FORCE AND EFFECT.

A. All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor or the Contractor’s Subcontractors in the prosecution of the Work and must be determined in accordance with Michigan Law.

B. No change in Contract Price or Contract Time, “or equal” or substitution or modification of the Contract Documents (including addition, deletion, or other revision) must release the Surety of its obligations under this Payment Bond. The Surety hereby expressly waives notice of any such change in Contract Price or Contract Time, “or equal” or substitution or modification of the Contract Documents (including addition, deletion, or other revision).

C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to this Payment Bond). However, this Payment Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Payment Bond is/are illegal, invalid, or unenforceable, all other provisions of this Payment Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.

IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A Best’s rating and a Class VII or better financial size category per current A. M. Best Company ratings.

Name, Address and Telephone of the Surety:

Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan

Signed and sealed this __________ day of _______________________, 20_____.

THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________

WITNESS ______________________________ Name & Title: __________________________________________________

Telephone No. _________________________________________________

THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________

WITNESS ______________________________ Attorney-in-Fact: ________________________________________________

Telephone No. ____________________________________________________

Email: _________________________________________________________

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

TABLE OF CONTENTS

CONTRACT FORMS

BID SUMMARY FORM

BID SCHEDULE

QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION

CERTIFICATION OF A MICHIGAN BASED BUSINESS

BID BOND

POST-BID SUBMITTALS

PERFORMANCE BOND

PAYMENT BOND

TABLE OF CONTENTS

DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS

SECTION TITLE PAGE

00010 PRE-BID INFORMATION 00-1

00100 INSTRUCTIONS TO BIDDERS 00-3

00120 SUPPLEMENTARY INSTRUCTIONS 00-7

00200 INFORMATION TO BIDDERS 00-8

00700 GENERAL CONDITIONS 00-8

00750 SPECIAL WORKING CONDITIONS 00-20

00800 SUPPLEMENTARY CONDITIONS 00-21

00850 FEDERALLY FUNDED WAGE DETERMINATION SCHEDULE 00-21

00900 ADDENDA 00-21

DIVISION 01 - GENERAL REQUIREMENTS

01010 SUMMARY OF WORK 01-1

01020 ALLOWANCES 01-1

01025 MEASUREMENT AND PAYMENT 01-1

01030 ALTERNATES 01-1

01040 COORDINATION 01-2

01050 FIELD ENGINEERING 01-2

01060 REGULATORY REQUIREMENTS 01-2

01090 REFERENCES 01-4

01100 PROJECT PROCEDURES 01-5

01200 PROJECT MEETINGS 01-5

01300 SUBMITTALS 01-6

01400 QUALITY CONTROL 01-9

01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-10

01600 MATERIAL AND EQUIPMENT 01-10

01650 FACILITY START-UP 01-11

01700 CONTRACT CLOSE-OUT 01-11

01800 MAINTENANCE 01-11

APPENDIX I – GLOSSARY

APPENDIX II – SPECIAL WORKING CONDITIONS

APPENDIX III – SPECIAL PROJECT PROCEDURES

APPENDIX IV – PREVAILING WAGE

APPENDIX V – EXISTING WELL LOGS

DRAWINGS - BOUND SEPARATELY

TITLE SHEETS THRU

COVER DT

NOTES C-001

LEGEND C-002

OVERALL SITE C-101

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

EXISTING CONDITIONS HEMLOCK CAMPGROUND C-110

EXISTING CONDITIONS SANITATION STATION, CONTACT STATION AND PRV C-111

REMOVAL PLAN HEMLOCK CAMPGROUND C-120

REMOVAL PLAN SANITATION, CONTACT STATION AND PRV C-121

SITE PLAN HEMLOCK CAMPGROUND C-130

SITE PLAN SANITATION STATION, CONTACT STATION AND PRV C-131

PROFILE 0+00 TO 5+00 C-140

PROFILE 5+00 TO 10+67 C-141

DETAILS C-501

PROCESS NOTES & DETAILS D-001

DETAILS – WELLHOUSE D-101

DETAILS – PRV D-102

MECHANICAL NOTES & SYMBOLS M-001

MECHANICAL PLAN M-101

ELECTRICAL NOTES AND SYMBOLS E-001

ELECTRICAL DEMOLITION SITE PLAN ED101

ELECTRICAL DEMOLITION PLAN ED102

ELECTRICAL SITE PLAN ES101

PRV ELECTRICAL SITE PLAN ES102

WELLHOUSE ELECTRICAL POWER PLAN E-101

ELECTRICAL DETAILS E-501

ELECTRICAL SCHEDULES E-601

TECHNICAL SPECIFICATIONS

SUMMARY 01 10 00

SUBSTITUTION PROCEDURES 01 25 00

PROJECT MANAGEMENT AND COORDINATION 01 31 00

SUBMITTAL PROCEDURES 01 33 00

QUALITY REQUIREMENTS 01 40 00

TEMPORARY FACILITIES AND CONTROLS 01 50 00

TEMPORARY TREE AND PLANT PROTECTION 01 56 39

PRODUCT REQUIREMENTS 01 60 00

EXECUTION 01 73 00

CLOSEOUT PROCEDURES 01 77 00

OPERATION AND MAINTENANCE DATA 01 78 23

PROJECT RECORD DOCUMENTS 01 78 39

DEMONSTRATION AND TRAINING 01 79 00

SELECTIVE DEMOLITION 02 41 19

CAST-IN-PLACE CONCRETE 03 30 00

FIXED LOUVERS 08 91 19

FACILITY PAINTING 09 92 00

BALL VALVES FOR PLUMBING PIPING 22 05 23.12

FACILITY LIQUEFIED-PETROLEUM GAS PIPING 23 11 26

HVAC POWER VENTILATORS 23 34 23

GAS-FIRED UNIT HEATERS 23 55 33.16

INDOOR, MECHANICAL DEHUMIDIFICATION UNITS 23 84 16.16

LOW-VOLTAGE ELECTRICAL POWER AND CABLES 26 05 19

CONTROL-VOLTAGE ELECTRICAL POWER CABLES 26 05 23

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 26

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 29

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33

SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING 26 05 44

IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53

LIGHTING CONTROL DEVICES 26 09 23

PANELBOARDS 26 24 16

WIRING DEVICES 26 27 26

VARIABLE-FREQUENCY MOTOR CONTROLLERS 26 29 23

SURGE PROTECTION DEVICES FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS 26 43 13

LED INTERIOR LIGHTING 26 51 19

SITE CLEARING 31 10 00

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

EARTH MOVING 31 20 00

FLOWABLE FILL 31 23 23.33

EXCAVATION SUPPORT AND PROTECTION 31 50 00

ASPHALT PAVING 32 12 16

SIDEWALKS 32 16 23

TURF AND GRASSES 32 92 00

DISINFECTION OF WATER UTILITY PIPING SYSTEMS 33 01 10.58

UTILITY DIRECTIONAL DRILLING 33 05 07.13

THRUST RESTRAINT FOR UTILITY PIPING 33 05 09.33

SUBMERSIBLE WELL PUMPS 33 11 36

SITE WATER UTILITY DISTRIBUTION PIPING 33 14 16

SITE WATER SERVICE UTILITY LATERALS 33 14 17

VALVES AND HYDRANTS FOR WATER UTILITY SERVICE 33 14 19

WATER WELL ABANDONMENT 33 20 01

WATER WELLS AND TESTING 33 21 00

COUPLINGS, ADAPTERS, AND SPECIALS FOR PROCESS PIPING 40 50 06

HANGERS AND SUPPORTS FOR PROCESS PIPING 40 05 07

COPPER PROCESS PIPE AND TUBING 40 05 17

DUCTILE IRON PROCESS PIPE 40 05 19

COMMON REQUIREMENTS FOR PROCESS VALVES 40 05 51

GATE VALVES 40 05 61

SWING CHECK VALVES 40 05 65.23

PRESSURE-RELIEF VALVES 40 05 67.39

PRESSURE AND DIFFERENTIAL PRESSURE GAUGES 40 73 13

PRESSURE AND DIFFERENTIAL PRESSURE SWITCHES 40 73 36

WELDED STEEL PRESSURE TANKS 43 42 21

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

DIVISION 00

BIDDING REQUIREMENTS AND CONTRACT CONDITIONS

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

SECTION 00010 PRE-BID INFORMATION

1. Invitation to Bid (ITB) Your firm is invited to submit a Bid. The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for Tahquamenon Falls State Park Hemlock Well and Water Distribution System until 2:00 p.m., ET, on June 26, 2024. The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.

2. Work Description The Work, Tahquamenon Falls State Park Lower Falls Well & Water Distribution System, DTMB File No.

751/22438.ABG includes, but is not necessarily limited to: abandonment of the existing water distribution system within the Hemlock Campground, abandonment of the two existing Lower Falls wells, installation of two new wells located within the Hemlock Campground, installation of new directionally drilled water distribution lines within the Hemlock Campground, replacement of well house equipment and electrical, installation of new well house mechanical equipment, replacement of jug fillers within the Hemlock Campground, replacement of the service connection to the Contact Station, replacement of shutoff valves at the Lower Falls sanitation station and replacement of the existing underground PRV near the Portage Campground with a new above ground PRV and enclosure as well as other associated work as indicated in the Contract Documents.

The site is located Tahquamenon Falls State Park Lower Falls Well & Water Distribution System, 41382 W M-123, Paradise, Michigan

49768 as shown on the Drawings.

3. Bidding Documents Sets of Bidding Documents may be obtained at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.

4. Bid Security Each Bid must enclose a duly executed Bid Security, in the amount of five percent (5%) of the Bidder's Base Bid, paid to the “State of Michigan” in the form of a certified or cashier’s check or money order drawn upon a bank insured by an agency of the Federal Government, or a bid bond signed by both the Contractor and authorized surety company. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:

State Facilities Administration Design & Construction Division

3111 W. St. Joseph Street

All other Bid information must be submitted via SIGMA as per standard bidding procedure.

5. Pre-Bid Conference A mandatory pre-bid conference will be held at the project site on June 11, 2024, at 9:00 a.m. ET. A tour will be held on the same day after the conference. All prospective Bidders are required to attend the tour. Other parties interested in the Work are encouraged to attend the tour. Addenda may be issued, in response to issues raised at the pre-bid conference and tour, or as the Owner and/or Professional may otherwise consider necessary.

The purpose of the pre-bid conference and inspection is to answer questions and provide an inspection tour of the Project site at the scheduled time on the day of the meeting. A representative will be available to assist the Contractors. Other inspection visits may be allowed if needed. Individuals needing special services to fully participate in the meeting due to a disability may contact Zane Hyrkas, PE, OHM Advisors at zane.hyrkas@ohm-advisors.com.

6. SIGMA VENDOR NUMBER: If you are bidding a State job for the first time, visit the State of Michigan SIGMA website, https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, and follow the “SOM VSS User Guide for New Vendors” instructions, located under Forms and Reference Documents. Registration is required for bid submission. Do not wait until the last minute to submit a proposal, as the SIGMA system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA system will not allow a proposal to be submitted after the proposal deadline, even if a portion of the proposal has been updated.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 373-4111 or (888) 734-9749.

7. Equal Employment Opportunity Covenants to not discriminate in employment by Contractors, Subcontractors and Suppliers required by Law are contained in Instructions to Bidders and General Conditions and are applicable to the Work and any Sub-agreement under the Contract.

8. Contract Times The Contract Times and the associated liquidated damages are specified in the Contract. Work of all trades shall start no sooner than the Notice-to-Proceed and work on site shall start no sooner than October 25, 2024, or the Notice-to-Proceed, whichever is later. Work of all trades as specified in the Contract Documents must be Substantially Complete by June 20, 2025, except for minor replacement, correction, or adjustment items which do not interfere with the complete operation and utilization of all parts of the Contract Work. Additionally, the wells, well house equipment replacement, PRV adjustments at the Portage Campground entrance, work to connect to the water main providing water to the Portage Campground and Day Use area, connection to the main and valve at the Contact Station, and water shutoff replacement at the sanitation station shall be Substantially Complete and

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG operational by April 18, 2025. This shall include the disinfection and treatment necessary to start providing water to the Portage Campground and Lower Falls Day Use Area. Surface restoration does not need to be complete by the April 18, 2025, date. Work of all trades shall achieve Final Completion by July 25, 2025. These Contract Times are of the essence and liquidated damages for each Calendar Day that expires after Substantial Completion Dats or Final Completion of the entire Work must be in the amount of $1000/day. Liquidated damages are not a penalty, are cumulative and represent a reasonable estimate of the Owner’s extra costs and damages, which are difficult to estimate with accuracy in advance.

9. Contact Person All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to: Zane Hyrkas, PE, zane.hyrkas@ohm-advisors.com. Questions will be accepted until Wednesday, June 19, 2024, at 5:00 p.m. ET.

10. Award Subject to any agreed extension of the period for holding Bids, Bids must remain valid for acceptance by the Owner for 60

Calendar Days after the date of Bid opening. In addition, the Owner expressly reserves the right, within the Owner's sole discretion, to reject any or all Bids, to waive any irregularities, to issue post-Bid Addenda and re-bid the Work without re-advertising, to re-advertise for Bids, to withhold the award for any reason the Owner determines and/or to take any other appropriate action.

11. Performance and Payment Bonds – A performance bond and a payment bond are required for all contracts over $50,000.00.

END OF SECTION 00010

SECTION 00100 INSTRUCTIONS TO BIDDERS

1. PREPARATION OF BID: Execute Bid fully and properly. Bid Summary Form (DTMB -0401D) and Bid Form Attachments must be used and completely filled out for the Bid to be considered responsive and meeting the requirements of the contract solicitation. All Bid prices must be printed or typed in both words and figures.

2. BID CHECKLIST: Submit Bid Summary Form with original signatures plus Bid Form Attachments in accordance with the electronic bidding procedures on the SIGMA VSS website.

A complete Bid will consist of the following forms, which are included immediately following the Bid Summary Form:

Bids SUBMIT THESE Bid Forms and Bid Form Attachments

All Bids □ Signed and completed Bid Summary Form (DTMB-0401D).

□ Bid Schedule.

□ Qualified Disabled Veteran (QDV) Business Representation.

□ Bid Security in the amount of 5% of Base Bid Price.

If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:

State Facilities Administration Design & Construction Division

3111 W. St. Joseph Street

All other Bid information must be submitted via SIGMA as per standard bidding procedure

□ Signature Authorization or copy of the partnership agreement if signed by all partners.

□ Byrd Anti-Lobbying Certification (Only when Federal Provisions Addendum is included)

□ Other Forms; List of subcontractors and suppliers.

Over $50K □ Forms listed under All Bids.

□ Payment and Performance Bond (upon issuing the Notice of Award).

Over $100K □ Forms listed under All Bids.

□ Certification of a Michigan Based Business.

Over $250K □ Forms listed under All Bids.

□ Certification of a Michigan Based Business.

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

Apparent Low Bidders ONLY (upon request from the Professional)

□ Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.

□ Identification of the proposed project superintendent, with a resume or list of similar projects handled by that individual.

□ A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.

□ A list of nominated sub-contractors, including proposed self-performed categories, for each Division/Trade/etc.

3. BID SUBMISSION: Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.

4. BID GUARANTEE: Each proposal must be accompanied by either a bank certified or cashier's check on an open, solvent bank or a bid bond with an authorized surety company (the surety must be listed on the current U.S. Department of the Treasury Circular

570) in the amount of five percent of the base bid payable to the State of Michigan, as a guarantee of good faith. If the successful Bidder fails to furnish satisfactory bonds and insurance within fifteen Calendar Days after Notice of Award, such guarantee must be forfeited to the State as liquidated damages. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to the Issuing Office. The bid security, exclusive of bid bonds, of all unsuccessful Bidders will be returned when an award is made or upon substitution of a bid bond. The bid security of the successful Bidder will be returned when the performance bond and labor and material bond are approved.

5. Left Blank Intentionally.

6. MICHIGAN BASED BUSINESS CERTIFICATION: All Bidders submitting Bids in excess of $100,000.00 must complete the

Certification of Michigan Based Business. This information will determine if a Bidder qualifies as a "Michigan" business for purposes of application of reciprocity where applicable.

7. POST-BID SUBMITTAL: For all projects, the Professional may request a Post-Bid Submittal from the Apparent Low Bidders.

The Apparent Low Bidders must submit to the Professional, within two Business Days after receipt of the Professional’s request, Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.

Identification of the proposed project superintendent with a resume or list of similar projects managed by that individual.

A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.

Failure to provide the submittals may disqualify the Bid.

8. SIGNATURES: All Bids, notifications, claims, and statements must be signed as follows:

(a) Corporations: Signature of official must be accompanied by a certified copy of the Resolution of the Board of Directors authorizing the individual signing to bind the corporation.

(b) Partnerships: Signature of one partner must be accompanied by a signed copy of the legal document (e.g., Power of Attorney or partnering agreement) authorizing the individual signing to bind all partners. If Bid is signed by all partners, no authorization is required.

(c) Individual: No authorization is needed. Each signature must be witnessed.

9. BID PRICES: The Bidder’s Base Bid and Alternate Bid prices must include, and payment for completed Work will compensate in full for: all services, obligations, responsibilities, management, supervision, labor, materials, devices, equipment, construction equipment, general conditions, permits, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, supplies, Bonds, insurance, taxes, mobilization, close-out, overhead and profit and all connections, appurtenances and any other incidental items of any kind or nature, as are necessary to complete the Work, in a neat, first quality, workmanlike and satisfactory manner in accordance with the Drawings and Specifications and as otherwise required to fulfill the requirements of the Bidding Documents. For each Cash Allowance item, the Bidder must include, within the Bid, all labor costs, construction equipment costs, insurance and Bond premiums and other general conditions costs and Fees (Bidder’s and Subcontractors’) to complete Work associated with the material, equipment, or other designated item to be furnished under the Cash Allowance. For each Provisionary Allowance, the Bidder must include, within the Bid, insurance, premiums (not recoverable as labor burden) and Bond premiums required to complete Work that may be ordered under a Provisionary Allowance.

10. INSPECTION OF BIDDING DOCUMENTS AND SITE CONDITIONS: The Bidder must carefully review and inspect all documents referenced and made part of this ITB, site conditions, all applicable statutes, regulations, ordinances, and resolutions addressing or relating to the goods and services under this contract. Failure to do so or failure to acquire clarifications and answers to any discovered conflicts, ambiguities, errors, or omissions in the Bidding Documents will be at the Bidder’s sole risk.

11. SAFETY REQUIREMENTS AND LAWS: The Bidder awarded the Contract must comply with all applicable federal, state, and local

Laws including health and safety regulations, environmental protection, permits and licensing.

Bidding and Contract Document (R 02/24) TFSP Well & Water Distribution System File No. 751/22438.ABG

12. INTERPRETATIONS AND ALTERATIONS TO THE BID AND BIDDING DOCUMENTS: All requests for clarification or interpretation of the Bidding Documents, all proposals for any modifications to the Bidding Documents, all requests for information and all other questions or inquiries about the Bidding Documents and/or the Work shall be submitted in writing to the Contact Person identified in the Bid Documents.

This is the start of the file's text. The full file is on GovTribe.