This Addendum No. 1, dated May 14, 2024, modifies the contract documents for the Tahquamenon Falls State Park Upper Falls Brink Overlook project, a universal access path and brink overlook viewing platform installation project owned by the Michigan Department of Technology, Management and Budget (DTMB) in Paradise, Michigan. The project encompasses installation of concrete and helical foundations, new boardwalk and viewing platforms, clearing activities, HMA removal, salvaging and installation of furnishings, removal of existing stairways and platforms, and select demolition of existing foundations. The addendum updates the bid form and technical specifications, including revised foundation quantities: 35 helical piles with 24-inch caps and 88 helical piles with 18-inch caps. The pre-bid conference will be held at the State Park Headquarters building located on the south side of M-123 between the entrances to the Lower and Upper Falls. Bids are due June 12, 2024, at 2:00 p.m. ET with substantial completion required by July 31, 2025, and final completion by August 31, 2025. The addendum revises liquidated damages to $1,000 per calendar day for both substantial completion and final completion delays, removes the alternates section entirely, and specifies the use of hot-dip zinc-coated welded wire steel mesh (minimum 8-gauge) for exterior rough carpentry and W12x26 beams at the overlook framing.
Bids must be submitted electronically through the SIGMA VSS website, with a five percent bid guarantee required for all bids. Performance and payment bonds are required for all bids exceeding $50,000, and builders risk insurance is required unless otherwise indicated. The base bid is structured as a lump sum with a $100,000 allowance amount, and bidders must complete a schedule of contingent change order prices for various foundation types including concrete foundations and helical pile foundations with different diameters and configurations. The contract documents require bidders to acknowledge receipt of all addenda, examine site conditions, verify existing underground utilities in compliance with Michigan PA 174, and provide post-bid submittals including current EMR ratings, proposed project superintendent information, and references for at least three similar projects completed within the last three years.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 Page 1 of 1
ADDENDUM NO. 1
DATE: 5/14/2024
PROJECT: Tahquamenon Falls State Park Upper Falls Brink Overlook
OWNER: MI DTMB
DTMB FILE NO.: 751/22438.ABG
BID DATE: Wednesday, June 12, 2024 **THIS ADDENDUM DOES NOT CHANGE THE
BID DATE**
The following shall be incorporated into the Contract Documents dated 2024 APR 25.
GENERAL
The pre-bid conference will start at the address listed, which is the State Park Headquarters building. It is located on the South side of M-123 between the entrances to the Lower and Upper Falls.
PROJECT MANUAL
SECTION 00300 BID SUMMARY
An updated bid summary and bid form is attached.
SECTION 00500 AGREEMENT
Replace paragraph 4.2.3 of Article 4 with the following:
4.2.5 Liquidated damages for each Calendar Day that expires after the Contract Time specified in paragraph 4.1.2 for Substantial Completion of the entire work – until the work is substantially complete – shall be in the amount of One Thousand Dollars and No/Cents ($1000.00)
Replace paragraph 4.2.5 of Article 4 with the following:
4.2.5 Liquidated damages for each Calendar Day after Final Completion of the entire Work that expires after the Contract Time specified in paragraph 4.1.4 for completion and readiness for final payment – until the entire Work is complete and ready for final payment – shall be in the amount of One Thousand Dollars and No/Cents ($1000.00).
TECHNICAL SPECIFICATIONS
SECTION 061063 – EXTERIOR ROUGH CARPENTRY
Add section 2.6.C: Wire Mesh: Hot-dip, zinc-coated, welded wire steel mesh, minimum 8ga diameter wire.
SECTION 012300 – ALTERNATES
Remove Section 012300 in its entirety.
DRAWINGS
S-101 – See Attached Sheet S-101 Updated quantities to call out 35 helicals with a 24” cap and 88 helicals with an 18” cap. Corrected callouts for the sizes of Landings 1 and 2.
S-501 – See Attached Sheet S-501 Revised detail 1 to show W12x26 beams at the overlook and to match the details on S-503.
End of Addendum No. 1
STATE OF MICHIGAN (OWNER AND CONTRACTOR) BID SUMMARY
MICHSPEC DTMB 00120 - 1 (Rev. 02/2018)
SECTION 00300 − BID SUMMARY
DTMB-0401M (R 03/21)
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
751/22438.ABG
DEPARTMENT/AGENCY
DTMB/MDNR
CONTRACT TIME(S)
Substantial Completion: July 31, 2025 Final Completion: August 31, 2025
PROJECT NAME
Upper Falls Brink Overlook
LOCATION
41382 W M-123 Paradise, MI 49768
BID OPENING DATE
June 12, 2024 at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE CONTACT
Tahquamenon Falls State Park, 41382 W. M-123 Paradise, MI 49768
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE CONTRACTOR UNLESS
OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work: The project consists of installation of a new universal access path and brink overlook viewing platform at the Tahquamenon Falls State Park Upper Falls including installation of concrete and helical foundations, new boardwalk and viewing
MICHSPEC DTMB 00300 − 1 (R 02/24)
platforms, clearing activities, HMA removal, salvaging existing furnishings, new furnishings, removal of existing stairway and platform and select demolition of existing foundations.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________
MICHSPEC DTMB 00300 − 1 (R 02/24)
SECTION 00300 BID FORM
PROFESSIONAL − OHM Advisors
WORK − Upper Falls Brink Overlook
FILE No. - 751/22438.ABG
TABLE OF CONTENTS
PAGE
BID SUMMARY i
1 THIS BID IS SUBMITTED TO 1
2 THE BIDDER'S REPRESENTATIONS 1
3 TIME OF COMPLETION 2
4 ATTACHMENTS INCLUDED WITH THIS BID 2
5 DEFINED TERMS 2
6 BID SCHEDULE 3
7 SCHEDULE OF CHANGE ORDER PRICES __
8 BID SUBMITTED __
ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF
MICHIGAN ("the Owner").
1.1. The undersigned Bidder proposes and agrees, if this Bid
is accepted, to enter into an agreement with the Owner on the form in Section 00500 Agreement and to furnish and perform the Work as specified or indicated in the Bidding Documents for the Bid prices in the "Bid Schedule" on this Section 00300 Bid Form, within the Contract Times specified in Section 00500 Agreement, and in accordance with all other provisions and terms and conditions of the Bidding Documents, including, without limitation, those dealing with the disposition of the Bid Security.
1.2. The undersigned Bidder agrees to hold this Bid open for
acceptance by the Owner for the period specified in Article 9 of Section 00030 Advertisement.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model
1.3. The Bidder will provide a signed original of Section
00500 Agreement, the executed Section 00610 Performance Bond, the executed Section 00620 Payment Bond, and appropriate evidence of insurance within the times and in the manner specified in the Bidding Documents.
ARTICLE 2 THE BIDDER'S REPRESENTATIONS
2.1. The Bidder has examined the Bidding Documents, including the Addenda acknowledged in the table below. The Bidder has verified that the Addenda acknowledged below include all issued Addenda. Except for Addenda, which solely revise the date of Bid, opening, failure by the Bidder to acknowledge receipt of all Addenda correctly, by either failing to complete or incorrectly completing the table below, shall justify the Owner's refusal to read the Bid and automatically disqualify the Bidder from any consideration for award of the Contract.
No. ___ Dated _____________ No. ___ Dated __________
No. ___ Dated _____________ No. ___ Dated __________
No. ___ Dated _____________ No. ___ Dated __________
2.2. The Bidder has taken those steps that are reasonably
necessary to (a) ascertain and become familiar with the Work, site, and locality; (b) account for all applicable federal, state, and other local Laws and all general, local, and prevailing conditions that may in any manner affect cost, schedule, progress, performance or furnishing of the Work; and (c) study and account for the terms and conditions of the Bidding Documents. The Bidder has carefully correlated the Bidder's observations with the Bidding Documents.
2.3. The Bidder has studied carefully all reports concerning
subsurface conditions and drawings of physical conditions of existing surface and subsurface facilities that have been used by the Professional and all documents of physical conditions of existing Underground Utilities facilities that have been used by the Professional − in both cases as identified in Section 00210 Information for bidders. The Bidder assumes responsibility for carefully and accurately locating existing Underground Utilities in a manner consistent with paragraph 10.3 of Section 00700 General Conditions and as required by 2013 PA 174, as amended, MCL
460.721 et seq. The Bidder accepts the determinations set forth in the Bidding Documents as to the extent of such Authorized Technical Data and Underground Utilities information and data contained in those reports, drawings, documents, or the Bidding Documents, as applicable, upon which the Bidder may rely.
2.4. To the extent Additional Technical Data has been
considered by the Bidder as necessary for determining the Bid in Article 6 Bid Schedule, and the Owner, upon request, did not have the necessary Additional Technical Data, the Bidder assumes responsibility for having undertaken or undertaking reasonable examinations of the site and any other pertinent available
MICHSPEC DTMB 00300 − 2 (R 02/24)
information and data. The Bidder agrees to perform and furnish the Work affected by the conditions involved, at no increase in Contract Price and Contract Time, to the extent the information and data necessary for determining the Bid could have been discovered through reasonable examinations of the site and any other pertinent information and data available (including, but not limited to the information and data designated in Section 00210 Information for Bidders).
2.5. The Bidder has carefully correlated the results of its
observations, examinations, and studies of those reports of explorations and all that information and data in studies, drawings, and specifications, referred to in paragraphs 2.3 and 2.4, with the terms and conditions of the Bidding Documents.
2.6. The Bidder has examined all information and data shown
or indicated in the Bidding Documents concerning other work, including, but not limited to provisions in Section 00700 General Conditions. The Bidder assumes responsibility for all reasonably foreseeable terms, conditions and consequences resulting from other work that may in any manner affect cost, schedule, progress, performance or furnishing of the Work.
2.7. The Bidder has carefully examined the terms and
conditions of the Bidding Documents concerning Delay, Activity Float times and early completion. The Bidder agrees that increases in Contract Price and/or Contract Time for Delay shall be as provided in Section 00700 General Conditions. The Bidder has correlated those terms and conditions with the Bidder's schedule for the Work and its Base Bid and Alternates.
2.8. The Bidder represents that each unit price covering
Specified or Contingent Unit Price Work, whether bid on Article 6 − Bid Schedule or on Article 7 − Schedule of Change Order Prices, includes sufficient amounts to cover (a) all labor costs, Subcontractor costs, material and equipment costs, construction equipment costs and general conditions costs, and (b) all administrative costs and home office overhead), and (c) profit. The Owner reserves the right to reject any unit prices bid on paragraph 6.2 Schedule of Alternates or in Article 7 Schedule of Change Order Prices, which, in the Owner’s sole discretion, are not in the Owner’s best interest.
2.9. The Bidder has given the Professional written notice of
all conflicts, ambiguities, errors, or omissions the Bidder has discovered in the Bidding Documents, and the written resolution given by the Professional is acceptable to the Bidder.
2.10. This Bid is genuine, is not made in the interest of or on behalf of any undisclosed person and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation. To induce the Owner into consideration of this Bid, the Bidder reiterates and makes each of the representations made by the Bidder in Section 00320 Non-collusion Affidavit attached to this Section 00300 Bid Form.
2.11. The Bidder is aware of the Owner's requirements for
business owned by minorities, women, and persons with physical or mental disabilities, and assumes responsibility for all conditions and consequences that may result from meeting those requirements and that may in any manner affect cost, schedule, progress, performance and furnishing of the Work.
2.12. The Bidder has read and studied each provision of the
Bidding Documents. The Bidder has no expectations different from the terms and conditions of the Bidding Documents.
ARTICLE 3 TIME OF COMPLETION
3.1. The Contract Times are specified in paragraph 4.1 of
Section 00500 Agreement. The Bidder has carefully correlated the provisions in paragraph 4.1 of Section 00500 Agreement with the other terms and conditions of the Bidding Documents and unequivocally accepts the Contract Times for the Work, and any other designated parts of the Work, as specified.
3.2. The Bidder unequivocally accepts the liquidated damage
provisions specified in paragraph 4.2 of Section 00500 Agreement in the event of any failure, neglect, or refusal to complete the Work, or designated part of the Work, within the corresponding Contract Times specified in paragraph 4.1 of Section 00500 Agreement.
ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID
4.1. Attachments to this Section 00300 Bid Form and made a
condition of this Bid are:
4.1.1. Evidence of Authority to Sign the Bid.
4.1.2. Section 00310 Bid Bond, with the attached certified
copy of Power of Attorney, or
Alternate Bid Security.
4.1.3. Section 00320 Non-collusion Affidavit.
TO BE PROVIDED POST BID WITH SECTION 00400
SUBMITTALS:
4.1.5 Current EMR Rating
4.1.6 Identification of the proposed project superintendent
with a resume or list of similar projects handled by that individual.
4.1.7 A list of at least three (3) projects completed within
the last three (3) years of similar size and complexity, with contact information for references for each.
4.2. Bidder-provided documents, made a condition of this Bid, are as required in the following Section(s) of the Bidding Documents:
ARTICLE 5 DEFINED TERMS
5.1. Section 00020 Glossary assigns specific intent and
meanings to capitalized terms and to other defined terms used in (a) this Section 00300 Bid Form, (b) Section 00310 Bid Bond and Section 00320 Non-collusion Affidavit), and (c) Section 00410 Bid Breakdown, Section 00420 Questionnaire, Section 00430 List of Subcontractors and Section 00440 Schedule of Materials and Equipment.
MICHSPEC DTMB 00300 − 3 (R 02/24)
ARTICLE 6 BID SCHEDULE
6.1 Base Bid Schedule - The Bidder will complete the Work and accept in full payment, for the Work items listed, the following unit prices and/or Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description
Unit Price
Item Bid
1 LS Project Scope of Work
ALLOWANCE AMOUNT $100,000.00 $100,000.00
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Bid Prices for all Base Bid Items):
________________________________________________________________ Dollars and No/Cents $__________________________ (use words) (in figures)
Name of the Bidder _________________________________________ File No. _______________
Date _________________________
SIGMA VENDOR NUMBER _________________________________
Telephone No. _______________________
MICHSPEC DTMB 00300 − 4 (R 02/24)
6.2 Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Bid Prices:
Alternate Item No.
Bid
Item Bid
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Name of the Bidder _________________________________________ File No. _____________
Date _________________________
MICHSPEC DTMB 00300 − 5 (R 02/24)
ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES
7.1 The Bidder shall use this “Schedule of Change Order Prices” to propose contingent prices. The proposed contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Proposed Change Order prices will not affect determination of the lowest Bid.
7.2 Subject to their incorporation into the Contract Documents, as provided in the Agreement, the Bidder will add to, or deduct from, the Contract Work covered by the contingent prices that follow and accept in full payment, or allow in full credit, for that Work (a) those prices bid by the Bidder, or (b) if a particular price is not bid, the price proposed by the Owner (and shown in the appropriate column):
Item No. Bid
Item Bid Price
1 1 EA Concrete Foundation, 18-inch Diameter, Bedrock Anchored
2 1 EA Concrete Foundation, 24-inch Diameter, Bedrock Anchored
3 1 EA Helical Pile Foundation, 18-inch Diameter
4 1 EA Helical Pile Foundation, 24-inch Diameter
5 1 EA Helical Pile Foundation, 18-inch Diameter, with Battered Pile
6 1 EA Helical Pile Foundation, 24-inch Diameter, with Battered Pile
7 1 LF Helical Pile, Additional Foot
Name of the Bidder _________________________________________
File No. _________
Date _________________________
MICHSPEC DTMB 00300 − 6 (R 02/24)
ARTICLE 8 BID SUBMITTED ON the _______ day of ________________, 20____.
8.1. Bid Security is in the form of a Bid Bond _______ Bid Bond form provided in Section 00310 has been duly executed _______; or
A Certified or Cashier's check ___ or Money Order ___ if a check or money order is provided as Bid Security, the original check/money order must be delivered before Bid Due Time to the issuing office as per Section 00100 paragraph 5.2 and Section 00110 item 3.
8.2. If the Bidder is an Individual:
Name of Individual: _________________________________________________________
Name & Title of Person Authorized to sign: _________________________________________________________
Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date
Doing Business as: _________________________________________________________
Business Address: _________________________________________________________
SIGMA VENDOR NUMBER ____________________________________________
County of registration _________________________
Telephone: _________________________ FAX: ______________________
8.3. If the Bidder is a Partnership:
By: _________________________________________________________ (True Name of the Partnership)
Partner Authorized to Sign Date
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Business Address: _________________________________________________________
SIGMA VENDOR NUMBER ____________________________________________
County of registration _________________________
Telephone: _________________________ FAX _______________________
8.4. If the Bidder is a Corporation:
By: _________________________________________________________ (Legal Corporation Name)
Name & Title of Authorized Officer: _________________________________________________________
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Name & Title of Officer Attesting: _________________________________________________________
Signature: _________________________________________________________ Date
Business Address: _________________________________________________________
SIGMA VENDOR NUMBER ____________________________________________
Telephone: _________________________ FAX _______________________
(State of Incorporation): _________________________________________________________
MICHSPEC DTMB 00300 − 7 (R 02/24)
8.5. If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES SHALL BE AS PROVIDED IN PARAGRAPH 9.5 OF SECTION 00100 INSTRUCTIONS TO BIDDERS. EACH JOINT VENTURER SIGNING THE BID SHALL SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF
REGISTRATION _____________________
CERTIFICATE OF PRINCIPAL
(BIDDER)
I, ________________________________, certify that I am the Secretary of the Corporation ____, or a General Partner ____ or Managing Partner ____ or Partner ____ of the partnership, named as the Bidder in the attached Section 00300 Bid Form; that __________________ _____________ who signed Section 00300 Bid Form on behalf of the Bidder, was then _____________________ of that corporation ____ or partnership ____; that I know the undersigned's signature, and the signature is genuine; and that Section 00300 Bid Form was duly signed, sealed and attested for and on behalf of that corporation ___ partnership ___ by authority of its governing body ___ or partners ___
Signed by the Secretary or Other Authorized Officer of the Corporation Date or By General Partner or Managing Partner or Authorized Partner Certifying
Name of the Corporation or True Name of the Partnership
Federal Identification (I.D.) No. or Social Security No. (LAST 4 ONLY)__________________________________
Telephone No. ____________________________
(Corporate Seal)
VERIFICATION
(BIDDER)
STATE OF MICHIGAN )
COUNTY OF __________________ )
Before me, a Notary duly commissioned, qualified and acting, personally appeared (enter name of person who signed the Bid Form on behalf of the Bidder), _______________________________________________ to me well known to be the person described in and who signed Section 00300 Bid Form, who being by me first duly sworn upon oath, says that he/she is the Attorney-in-Fact for (enter the Bidder's name) ___________________________________________________________________ and that he/she has been authorized by (enter name of individual, partnership name, or that governing body of the Bidder named in the attached corporate resolution) _______________ _____________________________________________________________________ to execute the attached Section 00300 Bid Form on behalf of the named Bidder in favor of the STATE OF MICHIGAN.
Subscribed and sworn before me this __________ day of ______________________________, 20_____.
Notary Public, State of: _________________
My Commission Expires: _____________________________________
END OF SECTION 00300
HELICAL PILE WITH 24" Ø x 24" CONCRETE
PIER CAP AT CORNERS 35 TOTAL
SEE DETAIL 1/S-502
SEE 2/S-501 FOR
LANDING 4 FRAMING
SEE 3/S-501 FOR
LANDINGS 3 AND 5
FRAMING
SEE 1/S-501 FOR
LOOKOUT FRAMING
HELICAL PILE WITH
18" Ø x 24" CONCRETE PIER CAP
88 TOTAL
SEE DETAIL 1/S-502
SEE DETAIL 4/S-502 FOR
BOARDWALK FRAMING
DOUBLE POST AT
CORNER, TYP
24" Ø CONCRETE
FOOTING ANCHORED IN
BEDROCK OR 5' DEPTH
80 TOTAL
SEE DETAIL 2/S-502
BOARDWALK END,
SEE DETAIL 5/S-501
18" Ø CONCRETE
FOOTING ANCHORED IN
BEDROCK OR 5' DEPTH
224 TOTAL
SEE DETAIL 2/S-502
SEE 4/C-501
FOR BENCH
DETAIL
SEE 7/S-501 FOR
LANDING 1 FRAMING
SEE 6/S-501 FOR
LANDING 2 FRAMING
SEE C-121 FOR SAW CUT
AND REMOVE EXISTING
FOUNDATIONS NEAR
BRINK, TYP
LOW PROFILE BOARDWALK
SEE DETAIL 7/S-502
APPROXIMATE LOCATION
OF EXISTING UNDERCUT
EX. MONUMENT
EX. MONUMENT
INSTALL BATTERED HELICALS AT
UPHILL FOUNDATIONS OF LANDING.
SEE DETAIL 1/S-502 FOR BATTERED
HELICAL REQUIREMENTS
CONNECT ALL FOUNDATIONS IN LANDING
1 WITH TIES TO THE NEXT UPHILL
FOUNDATION SEE DETAIL 1/S-502 FOR
FOUNDATION REQUIREMENTS
BATTERED HELICALS
REQUIRED AT ALL UPHILL
SIDE FOUNDATIONS PER
DETAIL 1/S-502
INSTALL BATTERED HELICALS AT UPHILL
FOUNDATIONS OF LANDING. SEE DETAIL
1/S-502 FOR BATTERED HELICAL
REQUIREMENTS
HIGH PROFILE BOARDWALK
SEE DETAIL 7/S-502
HIGH PROFILE BOARDWALK
SEE DETAIL 7/S-502
Know what's below.
before you dig.Call
R
12.5 X 20
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
SI
Q
U
ER
EI
S
PE
N
IN
SU
L
AM
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
P:\7
_72 00\
0_T ahq uam eno nFa llsS tate
Par k\B
1_B rink
Ov erlo ok Sta irs and
Vie win g P latf orm \Dr aw ing s\S ite\
She ets
\B1 _22
0ST
R.d wg
Ma y 1 0, 4 -
1:5 0pm
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
IS
O
RS
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
TA
HQ
UA
ME
NO
N
FA
LL
S
ST
AT
E
PA
RK
UP
PE
R
FA
LL
S
BR
IN
K
OV
ER
LO
OK
2 W
M -1
, P
AR
AD
IS
E, M I 4
FO
UN
DA
TI
ON
S
S-101
-2 2-
ZH
ZH
1.2
.A
BG
/05 /10
BI
D
SE
T
AD
DE
ND
UM
10 X 20
15 X 20
20 X 30
15 X 20
25 X 40 feetGRAPHIC SCALE: FULL feetHALF
60402010
HELICAL ANCHORED FOUNDATION
CONCRETE FOUNDATION,
BEDROCK ANCHORED
NOTES
1. NO EQUIPMENT SHALL BE USED OR OPERATED
ON THE GROUND BELOW THE TOP OF BANK
(SOUTH OF EXISTING BRINK PAVED PATH).
FOUNDATION INSTALLATION, EXCAVATIONS AND
WORK ON THE GROUND SHALL BE PERFORMED
WITH HAND TOOLS. SMALL GENERATORS THAT
CAN BE CARRIED BY HAND MAY BE USED.
SCAFFOLDING IS ACCEPTABLE. SIT ON OR WALK
BEHIND EXCAVATORS, SKID STEERS, EARTH
MOVERS OR OTHER EQUIPMENT IS NOT
ALLOWED.
2. HANDHELD HELICAL PILE INSTALLATION
PACKAGES SHALL BE UTILIZED FOR THE
INSTALLATION OF HELICAL PILES.
3. EXCAVATED SOILS FOR FOUNDATION SHALL BE
DISPOSED OFF OF SITE.
ETE 1
ETE 1
http://www.ohm-advisors.com
(3) 2x12 PT, TYP
(3) 2x12 PT, TYP
MAX SPAN 6'
(3) 2x12 PT, TYP
PT 2x12s @ 16" OC, TYP
MAX SPAN 8'
SAW CUT AND REMOVE
FOUNDATIONS NEAR BRINK, TYP
6x6 POST, TYP
4x4x3
16 COL, TYP
DOWEL INTO EX FOUNDATIONS AND ADD
CONCRETE TO CREATE 3'x3' BLOCK WITH
DEPTH TO MATCH EX FOUNDATIONS OR
MIN 3'-6", TYP
18" Ø CONCRETE
FOOTING ANCHORED IN
BEDROCK OR 5' DEPTH
24" Ø CONCRETE
FOOTING ANCHORED IN
BEDROCK OR 5' DEPTH
13.5'± TYP
10' TYP
10' TYP
10.9'±
SAW CUT AND REMOVE
FOUNDATION AS NEEDED FOR NEW
FOUNDATION
2x12 RIM JOIST, TYP
TIE RODS AT RAILING POSTS AND
SOLID BLOCKING TO GIRDER, SEE
DETAIL 7/S-502 SIM
3.5
4.8
4.8
5'
5'
6.5
5.1
(3) 2x12 PT, TYP
B1: W12x26
B1: W12x26
B1: W12x26
B1: W12x26
B1: W12x26
B1: W12x26
B2: W12x26
B3: W12x26
B3: W12x26
B3: W12x26
B3: W12x26
B3: W12x26
B4: W12x26 B5: W12x26
(3) 2x12 PT, TYP
TYPICAL BEAM HANGER
CONNECTION - SIMPSON
HU212-3 W/MAX NAILS
2x12s @ 16" OC, TYP
6x6 POST, TYP
4 @ 7'-6" = 30'
4 @ 5'
.0'
SEE 4 & 5/S-502 FOR RAILING
CONNECTION, TYP
SEE 4 & 5/S-502 FOR
RAILING CONNECTION
SIM, TYP
INSTALL ADDITIONAL JOISTS
AS NECESSARY FOR DECK
TIE ATTACHMENT
(3) 2x12 PT, TYP
TYPICAL BEAM HANGER
CONNECTION - SIMPSON
HU212-3 W/MAX NAILS
2x12s @ 16" OC, TYP
6x6 POST, TYP
2 @ 7'-6" = 15'
4 @ 5'
.0'
SIMPSON CC4.62-5.50 COLUMN
CAPS AT INTERIOR COLUMNS, TYP
SEE 4 & 5/S-502 FOR RAILING
CONNECTION, TYP
SEE 4 & 5/S-502 FOR
RAILING CONNECTION
SIM, TYP
INSTALL ADDITIONAL JOISTS AS
NECESSARY FOR DECK TIE ATTACHMENT
8' MAX SPACING
2x12s @ 16" OC, TYP 6x6 POST, TYP
(3) 2x12 PT, TYP
TYPICAL BEAM HANGER
CONNECTION - SIMPSON
HU212-3 W/MAX NAILS
TOENAILS OR SIMPSON LSSJ210RZ
OR LSSJ210LZ, SEE 4/S-502 OR
9/S-502 RESPECTIVELY
FIELD VERIFY SLOPE
EXISTING GRADE
1.5" FIBERGLASS GRATING2x10 PT, TRIM
AS REQUIREDCONCRETE PATH
2x12 PT
STRINGERS
4.0
17.5"
23.5"
8.0 "14
.0"
2" MAX GAP
RAILINGS NOT SHOWN FOR CLARITY
8" MDOT 22A
COMPACTED TO
95% MDD
(3) 2x12 PT, TYP
TYPICAL BEAM HANGER
CONNECTION - SIMPSON
HU212-3 W/MAX NAILS
2x12s @ 16" OC, TYP
6x6 POST, TYP
2 @ 6'-3" = 12.5'
4 @ 5'
.0'
SIMPSON CC4.62-5.50 COLUMN
CAPS AT INTERIOR COLUMNS, TYP
SEE 4 & 5/S-502 FOR
RAILING CONNCTION,
TYP
SEE 4 &5 /S-502 FOR RAILING
CONNECTION SIM, TYP
INSTALL ADDITIONAL JOISTS
AS NECESSARY FOR DECK TIE
ATTACHMENT
(3) 2x12 PT, TYP
TYPICAL BEAM HANGER
CONNECTION - SIMPSON
HU212-3 W/MAX NAILS
2x12s @ 16" OC, TYP
6x6 POST, TYP
2 @ 5'-0" = 10'
3 @ 6'
-8
.0'
SIMPSON CC4.62-5.50 COLUMN
CAPS AT INTERIOR COLUMNS, TYP
SEE 4 & 5/S-502 FOR RAILING
CONNECTION, TYP
SEE 4 & 5/S-502 FOR RAILING
CONNECTION SIM, TYP
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
SI
Q
U
ER
EI
S
PE
N
IN
SU
L
AM
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
P:\7
_72 00\
0_T ahq uam eno nFa llsS tate
Par k\B
1_B rink
Ov erlo ok Sta irs and
Vie win g P latf orm \Dr aw ing s\S ite\
She ets
\B1 _22
0ST
R.d wg
Ma y 1 0, 4 -
2:0 3pm
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
IS
O
RS
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
TA
HQ
UA
ME
NO
N
FA
LL
S
ST
AT
E
PA
RK
UP
PE
R
FA
LL
S
BR
IN
K
OV
ER
LO
OK
2 W
M -1
, P
AR
AD
IS
E, M I 4
BO
AR
DW
AL
K
FR
AM
IN
G
S-501
-2 2-
ZH
ZH
1.2
.A
BG
/05 /10
BI
D
SE
T
AD
DE
ND
UM
LANDINGS 3 AND 5 FRAMING3
LOOKOUT FRAMING1LANDING 4 FRAMING2
TYPICAL BOARDWALK FRAMING4
BOARDWALK END 5
LANDING 2 FRAMING6LANDING 1 FRAMING7
NOTE:
LANDING POSTS TO BE BRACED IN BOTH DIRECTIONS PER
1/S-502 AT ALL LOCATIONS WHERE POST HEIGHT IS 10'-0" OR
GREATER. INSTALL TWO SETS OF BRACING IF NECESSARY TO
ENSURE UNBRACED LENGTH IS LESS THAN 10'-0".
NOTE:
LANDING POSTS TO BE BRACED IN BOTH DIRECTIONS PER
1/S-502 AT ALL LOCATIONS WHERE POST HEIGHT IS 10'-0" OR
GREATER. INSTALL TWO SETS OF BRACING IF NECESSARY TO
ENSURE UNBRACED LENGTH IS LESS THAN 10'-0".
NOTE:
LANDING POSTS TO BE BRACED IN BOTH DIRECTIONS PER
1/S-502 AT ALL LOCATIONS WHERE POST HEIGHT IS 10'-0" OR
GREATER. INSTALL TWO SETS OF BRACING IF NECESSARY TO
ENSURE UNBRACED LENGTH IS LESS THAN 10'-0".
NOTE:
LANDING POSTS TO BE BRACED IN BOTH DIRECTIONS PER
1/S-502 AT ALL LOCATIONS WHERE POST HEIGHT IS 10'-0" OR
GREATER. INSTALL TWO SETS OF BRACING IF NECESSARY TO
ENSURE UNBRACED LENGTH IS LESS THAN 10'-0".
http://www.ohm-advisors.com AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text 3/4" = 1'-0"
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text 1" = 5'
File details come from the government source that posted it. Updated .