751.22391.MAA_Add1 Write Up.pdf

PDF 96 KB Posted

Attached to
751/22391. MAA; Harrisville State Park - Foot Bridge
Solicitation number
RFQ 171 230000000179 3
Issued by
Alcona County, Michigan

About this file

This is an Addendum #1 issued on February 2, 2023, for a state or local infrastructure project in Gaylord, Michigan. The addendum pertains to Project 751/22391.MAA, the Harrisville SP Footbridge Replacement, identified as SG Project Number 522528. The addendum clarifies and modifies the original bidding documents and takes precedence over them. Key clarifications include confirmation that the bridge will be fabricated by the Industrial Arts Institute in Onaway, Michigan, and that the contractor is responsible for transporting the completed bridge from Onaway to the Harrisville site and installing it on previously constructed abutments. All incidental work necessary to complete the project must be included in the contractor's quotation. The addendum incorporates three attachments: a sign-in sheet from the pre-bid walk-through, revised drawings issued as Addendum No. 1, and photographs of original benchmark elevations requested during the pre-bid meeting.

No pricing terms, funding sources, set-asides, or contract award information is provided in this addendum document. The addendum establishes that all requirements contained in the original contract documents remain applicable and that the specifications and drawings referenced herein supersede previously issued data.

View the file

Other files

File Type Posted
Sign in Sheet.pdf PDF
DCSpec_751-22391 01.19.23.pdf PDF
20230130_084228.jpg JPG image
Addendum 1.pdf PDF
22528_230120_Bid Documents with Seal.pdf PDF
20230130_084240.jpg JPG image
22391_DTMB-0415 Advertisement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

757 S. WISCONSIN AVENUE ▪ GAYLORD MI 49735

p h o n e 989.705.8400 ▪ f a x 989.705.8403

-1-

Up

Addendum Number: 1

Date: 2/2/23

Project Name: 751/22391.MAA Harrisville SP Footbridge Replacement

SG Project Number: 522528

This Addendum is being issued for the purpose of clarifying and/or modifying the original Bidding Documents and shall take precedence over them. Each Bidder’s proposal shall include the Work described herein. All requirements contained in the Contract Documents shall apply to this Addendum. All incidental work necessary to complete the Work shall be included in the Contractor’s quotation even though not particularly mentioned. Parts of the Specifications and Drawings referred to herein supersede previously issued data and form a part of this Addendum.

CLARIFICATIONS:

1. It has been confirmed that the bridge will be fabricated by the Industrial Arts Institute in Onaway, MI. The

Contract SHALL be responsible to pick up and transport the bridge from Onaway to the site in Harrisville, and then install the bridge on the abutments that will have been installed at that point.

ATTACHMENTS:

The following documents are a part of this Addendum:

1. Sign In sheet from the Pre-Bid Walk thru

2. Revised drawings, issued as Addendum No. 1

3. Photos of original Benchmark Elevations as requested during the Pre-bid Walk thru.