This is a Project Advertisement form issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for a construction project in Au Train, Michigan. The project involves the removal and disposal of the center span superstructure of an existing trail bridge over the Au Train River, including approximately 50 feet by 16 feet of steel plate girder superstructure, steel structure, and timber deck. The scope includes salvaging of deck and railing, requirements for lane and shoulder closure with maintenance of traffic, and all costs associated with winter conditions including plowing and snow removal. A mandatory virtual pre-bid meeting will be held via Microsoft Teams on April 29, 2025, at 9:00 A.M. EST, with registration required by email to swright@upea.com by 3:00 P.M. EST on April 28, 2025. Site visits are encouraged but not mandatory. Bid responses are due by May 14, 2025, at 2:00 P.M. Eastern time and must be submitted through SIGMA VSS with a maximum of two attachments under 25 MB each. Questions must be submitted by email to Steve Wright at swright@upea.com no later than 5:00 P.M. Eastern on May 7, 2025.
A 5% bid security is required from all contractors submitting proposals. Bid documents and required certifications should be included in the first attachment, with qualified disabled veteran information, if applicable, in a second attachment. Contractors should not submit proposals via email unless specifically approved by the Design and Construction Division contract specialists. The project is classified under NIGP code 91313. Contractors experiencing technical issues with SIGMA VSS submission should contact the Help Desk at 517.284.0540 or 888.734.9749 prior to the deadline. The PSC/Agency contact is U.P. Engineers & Architects, Inc., located at 100 Portage Street, Houghton, MI 49931, with phone number (906) 482-4810 and email swright@upea.com.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 9/24)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
DTMB FILE NO. 751/24434.JBB DATE 4/18/2025
ADVERTISEMENT DATE April 22, 2025 BID DUE DATE May 14, 2025 @ 2:00 p.m. EASTERN time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Au Train River Bridge Superstructure Removal, Au Train, MI
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
April 29, 2025, 9:00 A.M. EST, virtual meeting
A mandatory virtual pre-bid meeting will be held via Microsoft Teams on Wednesday, April 29th, at 9:00 A.M. EST. Please e-mail your company name, name of person attending and contact phone number to U.P. Engineers & Architects, Inc. at swright@upea.com by no later than 3:00 P.M. EST one day prior to the conference call to receive an invite to the meeting. The Contractor is highly encouraged to visit the site before submitting their bid.
Mandatory Yes No
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
Salvaging of deck and railing to be included with appropriate bid items. Remove and dispose of center span of existing trail bridge over the Au Train River. Remove approximate 50’x16’ steel plate girder superstructure including steel structure and timber deck to the top of the pile caps. Includes requirements for lane/shoulder closure and maintenance of traffic. Winter conditions: Includes all costs associated with winter conditions for removal of the bridge center span including plowing, snow removal and costs associated with additional lane/shoulder closures or maintenance of traffic due to winter conditions.
Please NOTE:
• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.
• Contractors should only submit a maximum of two (2) attachments (both being less than 25 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification x forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Bid Responses should not be emailed to the Project Director.
5% BID SECURITY REQUIRED
NIGP CODES: 91313
ACCEPTING QUESTIONS UNTIL:
Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Steve Wright at swright@upea.com no later than 5:00 p.m., Eastern on May 7, 2025.
Documents may be obtained from: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
PSC/Agency: U.P. Engineers & Architects, Inc.
Address: 100 Portage Street, Houghton, MI 49931
Phone: (906) 482-4810
Fax: (906) 482-9799 Email: swright@upea.com
Approved by:
File details come from the government source that posted it. Updated .