About this file

This is Addendum No. 2 to the bidding documents for the Au Train River Bridge Superstructure Removal project issued by U.P. Engineers & Architects, Inc. on behalf of the Michigan Department of Natural Resources in Alger County, Michigan. The addendum clarifies that the center span superstructure weighs approximately 60 tons, with approximately 30 tons consisting of timber decking that may be removed prior to lifting to reduce the load. Bidders are required to acknowledge receipt of this addendum on the bid form. The addendum was issued in May 2025 and modifies the original plans and specifications for the bridge superstructure removal project.

The addendum makes two primary specification changes: it replaces the Asbestos Abatement Attestation Submission form and revises the certified payroll submission process. Effective April 2, 2025, all contractors and subcontractors must register with the Department of Labor and Economic Opportunity (LEO) Wage and Hour to obtain a State Project Registration (SPR) and pay an annual fee of $500 to submit bids and perform state work. Certified payroll submissions for both contractors and subcontractors must be submitted directly to the LEO Wage and Hour database via their online portal and are no longer submitted to DTMB via email. The Asbestos Abatement Attestation Submission form is required with all bids pursuant to Public Act 59 of 2024, requiring bidders to attest whether they will self-perform asbestos abatement work or nominate a subcontractor, and to disclose any environmental violations or consent orders. Bids submitted without the required SPR will be deemed non-responsive and cannot be awarded.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 Portage Street Houghton, MI 49931

906-482-4810 • 800-562-7684 • Fax: 906-482-9799

Office also in:

Iron Mountain

Ishpeming Marinette Marquette

Sault Ste Marie

U.P. Engineers & Architects, Inc. www.UPEA.com

ADDENDUM # 2

File No. 751/24434.JBB

Michigan Department of Natural Resources

Au Train River Bridge Superstructure Removal

Alger County, Michigan

This ADDENDUM NO. 2, issued on May, 2025 is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc. and is hereby made a part of the bidding documents.

Bidders are required to acknowledge receipt of this ADDENDUM NO. 2 on the appropriate place on the Bid Form.

Bidder Questions and Answers

1. Q: Can we verify the weight of the bridge?

A: The center span superstructure has an approximate weight of 60 tons. Approximately

30 tons consists of timber decking that potentially could be removed prior to lifting in order to lighten the load.

Specifications

1. Replace the Asbestos Abatement Attestation Submission (page 6 of the PDF) with the attached revised sheet.

2. Replace the following portion of 00700-2.5.1:

Contractor must submit certified payrolls for both Contractor and subcontractors not later than 10 days after the end of a pay period to DTMB via email at DTMB-

DCDCertPay@michigan.gov. Files are to be 20mb or less and follow the naming convention provided by the Project Director to include the following information:

[CP###] [CH]-[Client]-[Vendor] [CN] [SFN] [ProjectID] – [County],pdf

CP###: A 3-digit ID of the Certified Payroll and the sequential order that it is for this specific project

CH: Contract Holder – this would be ‘DTMB’.

Client: Acronym of the agency the project is for

Vendor: Abbreviated Contractor name

CN: DTMB Contract Number – Y#####

SFN: The 4th through 8th number of this project file number ###/#####.AAA

ProjectID: Project name or abbreviated description

County: The county the work is taking place

ADDENDUM NO. 1

751-24434.JBB Au Train River Bridge Superstructure Removal – Addendum #2 May 9, 2025

Contractor will cease the submitting process of Certified Payroll to DTMB via the email on or about April 2, 2026, when the Department of Labor and Economic Opportunity requires that all certified payrolls be submitted directly to the Department of Labor and

Economic Opportunity database via the internet, 2023 PA 10 as amended, MCL

408.1122. Certified Payroll will continue to be required to be submitted to DTMB as an attachment to the Contractor’s regular payment request.

With:

Contractor is to submit certified payrolls, including contractor and subcontractor, not later than 10-days after the end of a pay period to the Department of Labor and

Economic Opportunity database via the internet through the Online Certified

Payroll Submission process the Contractor signed up for to receive their State

Project Registration, 2023 PA 10 as amended, MCL 408.1122. State certified payroll is not to be submitted to DTMB at any time.

END OF ADDENDUM NO. 2

Attachments:

- Revised DTMB-SFA- Asbestos Abatement Attestation Submission and DESIGN AND CONSTRUCTION Frequently Asked Questions for Recent Law Changes

Bidding and Contract Document (R 03/25) Project Name: Au Train River Bridge File No. 751/24434.JBB

ASBESTOS ABATEMENT ATTESTATION

SUBMISSION REQUIRED WITH ALL BIDS

Pursuant to the Public Entity Asbestos Removal Verification Act, PA 59 of 2024, MCL 338.3371 et seq. (“the Act”), the Owner will conduct the background investigation as required of any asbestos abatement contractor, or a general contractor that contracts with an asbestos abatement contractor, for the abatement of asbestos. Under the Act, an "Asbestos abatement contractor" means a business entity that is licensed under the asbestos abatement contractors licensing act, 1986 PA 135, MCL 338.3101 to 338.3319, and that carries on the business of asbestos abatement on the premises of another business entity and not on the asbestos abatement contractor's premises. Asbestos abatement contractor includes an individual or person with an ownership interest in a business entity described in MCL 338.3373(b).

(INSTRUCTIONS: Professional to select one of these two statements, then delete the not selected statement and instructions.)

THE SCOPE OF WORK TO BE COVERED UNDER THIS CONTRACT CONTAINS ASBESTOS ABATEMENT AND THIS

ATTESTATION MUST BE COMPLETED.

THE SCOPE OF WORK TO BE COVERED UNDER THIS CONTRACT DOES NOT CONTAINS ASBESTOS

ABATEMENT AND THIS ATTESTATION IS TO BE LEFT BANK.

Contractor attests that: (check one:)

1. The Contractor will self-perform all asbestos abatement project work and attests that Contractor has not been issued 5 or more notices of violation of environmental regulations (State and/or Federal), nor has been subject to an administrative consent order or a consent judgment involving environmental regulations.

2. The Contractor will self-perform all asbestos abatement project work; however, Contractor has been issued 5 or more notices of violation of environmental regulations (State and/or Federal), or has been subject to an administrative consent order or a consent judgment involving environmental regulations, requiring Owner to conduct a background investigation and a public hearing pursuant to PA 59 of 2024, MCL 338.3371 et seq.

3. The Contractor nominates the following Sub-contractor for all asbestos abatement project work and attests that the nominated Sub-contractor has not been issued 5 or more notices of violation of environmental regulations (State and/or Federal), nor has been subject to an administrative consent order or a consent judgment involving environmental regulations:

Nominated Sub-contractor: _______________________________________________________________________

4. The Contractor nominates the following Sub-contractor for all asbestos abatement project work; however, the nominated Sub-contractor has been issued 5 or more notices of violation of environmental regulations (State and/or Federal), or has been subject to an administrative consent order or a consent judgment involving environmental regulations, requiring Owner to conduct a background investigation and a public hearing pursuant to PA 59 of 2024, MCL 338.3371 et seq.

Nominated Sub-contractor: _______________________________________________________________________

DTMB-SFA- DESIGN AND CONSTRUCTION

Frequently Asked Questions for Recent Law Changes April 8, 2025

Prevailing Wage Law Q: What has changed in the prevailing wage laws?

A: Per Public Act 10 of 2023, amended per PA110 of 2024, all contractors and subcontractors performing work for the State of Michigan as a construction mechanic must register with Labor and Economic Opportunity (LEO) Wage and Hour and receive a State Project Registration (SPR) and pay the associated annual fee to be able to submit bids for state work and submit certified payroll during the project.

Q: When did the change become effective?

A: April 2, 2025.

Q: Does this change apply to projects bid and/or already under a contract before April 2, 2025?

A: No, the change applies to all projects with bids due on or after April 2, 2025.

Q: How do I get a State Project Registration (SPR) register with LEO Wage and Hour?

A: Instructions can be found on the LEO Wage and Hour Prevailing Wage website for attaining the required State Project Registration (SPR) for all contractors and subcontractors.

Q: How much does it cost and how do I pay the annual fee?

A: The fee will be determined by LEO Wage and Hour and is currently $500. The fee is paid directly to LEO Wage and Hour through their website. Please contact LEO Wage and Hour for any assistance or questions relating to issues for registration or payment.

Q: What happens if I submit a bid without the required SPR?

A: As the law requires, the bid will be determined not responsive and cannot be awarded a contract.

Q: Do I have to provide a SPR for every subcontractor that I provide with post bid submittals when I am being considered for award of a contract?

A: No, but the SPR’s must be available if requested. If it is not able to be provided, the contract may be terminated.

Q: What happens if I need to change a subcontractor after the work begins?

A: The General Contractor must immediately notify the Owner of any change in registration status for themselves and any subcontractor and is required to ensure that all subcontractors maintain a SPR with LEO Wage and Hour.

Q: How do I submit the required certified payroll?

A: Certified payroll for both the contract and subcontractors is required to be submitted directly to LEO Wage and Hour with the access provided at the time of paying for your SPR. Certified payroll for projects with State of Michigan Prevailing Wages are not to be submitted to DTMB at any time.

Q: Who do I ask for assistance with determining the appropriate wage rate?

A: LEO Wage and Hour.

For additional information please see 2024-PA-0110.pdf.

END

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.legislature.mi.gov%2Fdocuments%2F2023-2024%2Fpublicact%2Fpdf%2F2024-PA-0110.pdf&data=05%7C02%7Charlanp%40michigan.gov%7C176e4f87397847fde62208dd76d9de3b%7Cd5fb7087377742ad966a892ef47225d1%7C0%7C0%7C638797400292882830%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=F4JjZSz87XByaI70Z%2FFo7vHX%2BLV%2FWEXnPc8iqh684mo%3D&reserved=0

File details come from the government source that posted it. Updated .