751_22315.JBB SLC Paint River Trail Washout Repair - Addendum 1.pdf
PDF 4 MB Posted
- Solicitation number
- RFQ - 171 - 230000000207
- Issued by
- Dickinson County, Crystal Falls City, Michigan
About this file
This document is an addendum to a bid solicitation issued by the Michigan Department of Technology, Management, and Budget (DTMB) for the SLC-Paint River Washout Repair Project, File No. 751/22315.JBB. The project involves repairing washout damage to the Paint River ORV Trail in Crystal Falls, Michigan. Key project details include removing and disposing of washout material, installing culverts and riprap slope protection, and restoring the trail surface. The bid due date has been extended to March 1, 2023 at 2:00 PM Eastern. A pre-bid meeting was held on February 15, 2023, and the attendee list is provided. The project is expected to be completed in late 2023.
The addendum provides clarification on several bidding requirements, including the responsibility for obtaining permits, survey control points, as-built drawing expectations, and disposal of excavated spoils. It also confirms that prevailing wages apply and provides responses to questions received from potential bidders. Funding for the project is from the State of Michigan, and the contractor will be responsible for securing any necessary permits not provided by the owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DC_Spec_Paint_River_Trail_FINAL_020223.pdf | ||
| DTMB-0415 AdvertismentRev0822.pdf | ||
| 20230201_PAINT RIVER TRAIL_IFB PLAN SET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A1-2000-1
SLC-PAINT RIVER WASHOUT REPAIR DTMB FILE NO. 751/22315.JBB
ADDENDUM NO. 1
File No.: 751/22315.JBB Department of Technology, Management, & Budget
Project Name: SLC-Paint River Trail Washout Repair
Subject: Addendum 1
DATE: February 24, 2023
BID DATE: Wednesday, March 1, 2023, at 2:00 p.m. Eastern
TO: All Bidders
INTENT: This Addendum is issued to revise the bid question period and extend the bid due date. Additional specification section to be added.
ATTACHMENTS: 1. Pre-Bid Meeting Attendance Sheet
2. Project Plan Sheets C-02, C-03, and D-01
All Bidders submitting a Bid on the above Contract shall carefully read this Addendum and give it consideration in the preparation of their Bid.
Contractor shall list all addenda on the Bid Form to ensure conformity in the bid.
Drawings, Specifications and/or Proposals are herein amended, expanded and/or modified, as hereinafter described, and become a part of the Contract Documents with same force and affect as if incorporated, therein, originally. Any contrary provisions contained, or referred to, in Drawings and/or Specifications, shall remain applicable unless overridden by this Addendum.
Revised or contrary provisions herein shall not affect any other part of Contract Documents and any deletions, additions, substitutions and/or revisions mentioned, shall include all labor, materials, methods, modifications, etc. required for complete performance of the work.
The following are revisions to the Bidding and Contract Requirements:
General Information:
1. See enclosed Pre-Bid Meeting Attendance Sheet.
2. The existing forcemain for the City of Crystal Falls’ Main Lift Station as shown on the plans is an existing asbestos cement pipe that is expected to remain in operation until late fall of 2023. The exact location and depth of this forcemain are unknown. Washout material removal activities must be conducted in a manner that will not damage the existing pipe and allow it to remain in operation for the duration of the work.
a. It is noted that the existing forcemain is not located near Location #1.
3. Replace the following sheets with the revised sheets:
a. C-01 Existing Conditions: Revised to show the location of the existing buried fiber optic cables and a table of survey Control Points.
b. C-02 Proposed Conditions Location 1: Revised to show the location of the existing buried fiber optic cables.
c. C-03 Proposed Conditions Location 2: Revised to show the location of the existing buried fiber optic cables.
A1-2000-2
d. D-01: Revised Detail 5 to remove reference to the RCP culvert end section and indicate all culvert joints shall be wrapped.
The following are responses to questions received. Included below is the original question along with the response in italic text below:
1. Please confirm if this project is subject to prevailing Davis Bacon wages?
a. State of Michigan Prevailing Wages are required for this project see Section
00700 General Conditions and Appendix V for details.
2. Please confirm who is obtaining the SWPPP and SESC permits?
a. The contractor is responsible for the SWPPP and SESC permits. The Contractor shall also secure the Notice to Proceed with Earth Change in accordance with Appendix III, there is no cost for this permit.
3. Please confirm if there is localized survey control points for GPS equipment set up?
a. Yes control points are available and have been added to the plan set.
4. Please explain in what detail the Close Out Document As-built drawings are expected?
a. Contractor shall remain onsite redline as-built drawings that will be provided to the PSC. O&M manuals including submittal log will also be required to be provided too.
5. Is there local and secure equipment/material staging areas in the vicinity of the construction area? Can granular materials over the road trucks access this area?
a. There is no DNR owner property available for use as a staging area near the project site. There is some room along the trail that can be utilized for a staging area during the project. You are encouraged to visit the site to review these areas. Over the road trucks will be able to access the project area using the existing trail.
6. Who is the responsible party identifying the Buckthorn for removal in the project area?
a. The contractor is responsible for identifying if necessary and removing and disposing of any buckthorn material.
7. Will pre-construction staking of the two Locations be completed by the Owner?
a. There will be no construction staking by the Owner.
8. IFB Drawing Sheet D-01 shows corrugated metal pipe (CMP) flared end sections (FES), while Sheet D-01, detail 5/-, Note 3 states reinforced concrete pipe (RCP) FES. Please clarify which is correct?
a. All culverts and end sections shall be corrugated metal pipe (CMP).
9. Is it the Contractors responsibility to remove all excavated spoils offsite? Or does the DTMB have areas locally for disposal of the clean spoils?
a. The excavated spoils should be used to fill voids in the placed rip rap as indicated on Detail 2 on sheet D-01. The contractor is responsible for locating a suitable disposal site for any additional waste material.
A1-2000-3
10. Please define if reused topsoil needs to be “screened”? If so, please define if a screening plant is needed or if oversized particles can be handpicked from the topsoil?
a. Reused topsoil does not have to be screened in a screening plant but the contractor should rake out or otherwise remove large rocks and debris from reused topsoil.
11. Section 02270 calls for placement of sediment traps, excavated sediment traps, and check dams, yet there is no call out for these structures in the drawings. Please provide specifications and details/drawings for these structures if they are required?
a. The plans show the minimum SESC requirements required at this time, the Contractor shall follow all requirements identified in the Notice to Proceed with Earth Change and SESC permit. The Contractor is ultimately responsible for securing the site from all washouts or earth disturbance until all permanent SESC measures have been established.
Bidder shall acknowledge receipt of this Addendum at the bottom of the Bid Summary form to be submitted as part of the greater bid.
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SF
SF
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
FIBR
001310
1310132013301340
FIB
R
FIB
R
FIB
R
FIB
R
FIB
R
FIB
R
FIB
R
FIB
R
FIB
R
CP-1
CP-2
CP-1
C
AR
M O
D Y, T O
N Y
B :\W or ki ng \D
TM
B\
SL
C
P ai nt R iv er
O R
V Tr ai l W as ho ut \0
0_ C
AD
\D es ig n\ Sh ee ts
\E
XI
ST
IN
G C
O N
D
IT
IO
N
S.
dw g
/2
4/
GEI CONSULTANTS OF MICHIGAN, P.C.
990 LALLEY ROAD
IRON RIVER, MI 49935
(906)214-4140
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
0 2/3/2023 FOR BID RAA
1 2/24/2023 ADDENDUM 1 RAA
If this scale bar does not measure 1" then drawing is not original scale.
For Bid
SHEET NAME
SHEET NO.
DRAFT
SL
C
-P A
IN
T
R
IV
ER
TR
A
IL
W A
SH
O
U T
R
EP
A
IR
C R
YS
TA
L
FA
LL
S, M I
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
Designed:
Checked:
Drawn:
GEI Project
Approved:
TNC
RAA
TNC
2203044
P.E. No.: 6201058357
RAA
EXISTING
CONDITIONS
C-01
KEY MAP
LOCATION 1
SCALE: 1" = 30'
LOCATION 2
SCALE: 1" = 30'
LOCATION 1
LOCATION 2
EXISTING UNDERGROUND SEWER FORCE MAIN ALIGNMENT
PROTECT IN PLACE
PAINT RIVER EDGE OF WATER
TWO (2) UNDERGROUND COMMUNICATION
PROTECT IN PLACE
ORV TRAIL
ORV TRAIL
24" CULVERT WITH RIPRAP OUTLET
INV EL 1302.32
24" CULVERT WITH RIPRAP INLET
INV EL 1303.34
SCALE, FEET
30 60 0
SCALE, FEET
30 60
24" CULVERT WITH RIPRAP OUTLET
INV EL 1308.31
24" CULVERT WITH RIPRAP INLET
INV EL 1309.74
APPROXIMATE LIMITS OF
WASHOUT MATERIAL
APPROXIMATE LIMITS
OF WASHOUT MATERIAL
APPROXIMATE LIMITS OF TRAIL
PROPOSED UNDERGROUND SEWER FORCE MAIN ALIGNMENT
TO BE CONSTRUCTED IN SEPARATE PROJECT
PROTECT IN PLACE IF INSTALLED
PA
IN
T R
IV
ER
ORV TRAIL
EXISTING SILT FENCE
POTENTIAL OLD CULVERT
TWO (2) UNDERGROUND COMMUNICATION
PROTECT IN PLACE
CONTROL POINTS
POINT
NUMBER NORTHING EASTING ELEVATION DESCRIPTION
CP-1 480982.50' 25911611.40' 1328.80' SPIKE
CP-2 481135.89' 25911575.29' 1327.87' SPIKE
SEE KEY MAP FOR LOCATION
OF CONTROL POINT CP-2
FIBR FIBR FIBR FIBR FIBR FIBR FIBR FIBR FIBR FIBR FIBR FIBR FIBR
13281326
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC
101+00 102+00 103+00 104+00
100+00 104+71
SF
SF
SF
SF
SF
SF
SF SF SF SF
DITCH CENTERLINE
STA 100+83
OFFSET 17.9
DITCH CENTERLINE
STA 100+13
OFFSET 9.9
DITCH CENTERLINE
STA 104+61
OFFSET 10.3
DITCH CENTERLINE
STA 101+94
OFFSET 11.8
DITCH CENTERLINE
STA 102+47
OFFSET 11.5
DITCH CENTERLINE
STA 104+06
OFFSET 11.0
L2 L3L1
1326 1328
DITCH CENTERLINE
STA 101+41
OFFSET 13.4
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
.8
100+00
.3
100+50
.8
101+00
.8
101+50
.2
102+00
.1
102+50
.0
103+00
.9
103+50
.0
104+00
.5
104+50
.2
104+71100+00
.2
100+50
.8
101+00
.1
101+50
.7
102+00
.6
102+50
.7
103+00
.4
103+50
.5
104+00
.9
104+50
.2
104+71
PR LEFT DITCH BOTTOM
GRADE SLOPE 1.9%
PR LEFT DITCH BOTTOM
GRADE SLOPE 1.5%
PR TRAIL GRADE AT PR CENTER LINE
100+00
.4
100+50
.2
101+00
.2
101+50
.1
102+00
.1
102+50
.0
103+00
.0
103+50
.9
104+00
.8
104+50 104+71
TRANSITIONS SLOPE AT 3%
EX GRADE
TRANSITIONS SLOPE AT 3%
EX
IS
TI
NG
G
RA
DE
PR
O
PO
SE
D
T R
A
IL
G R
A D
E
PR
O
PO
SE
D
L
EF
T D
IT
C
H G
R A
D E
PR LEFT DITCH BOTTOM GRADE
STA 100+83
EL 1323.9
PR LEFT DITCH BOTTOM GRADE
STA 104+61
EL 1331.1
PR LEFT DITCH BOTTOM GRADE
STA 100+13
EL 1324.9
PO
B
FU
LL
D
EP
TH
6I
N
3A S
U R
FA
C
E C
O U
R
SE
ST
A:
+2
PO
E
FU
LL
D
EP
TH
SU
R
FA
C E
C O
U R
SE
, 2
3A , 6
IN
C
H
ST
A:
+5
CULV, CL A, CMP, 18 INCH
STA 100+83.01
INV EL 1323.6
POTENTIAL OLD CULVERT, REMOVE
FROM SERVICE
ALIGNMENT LINE TABLE
LINE #
L1
L2
L3
BEGIN STA
100+00
102+17.66
103+75.12
END STA
102+17.66
103+75.12
104+70.94
LENGTH
217.66'
157.45'
95.82'
BEGIN NORTHING
480637.53
480805.63
480921.53
BEGIN EASTING
25911789.81
25911651.54
25911544.96
END NORTHING
480805.63
480921.53
480993.16
END EASTING
25911651.54
25911544.96
25911481.31
DIRECTION
N39°26'15"W
N42°36'05"W
N41°37'19"W
C
AR
M O
D Y, T O
N Y
B :\W or ki ng \D
TM
B\
SL
C
P ai nt R iv er
O R
V Tr ai l W as ho ut \0
0_ C
AD
\D es ig n\ Sh ee ts
\P R
O
PO
SE
D
C O
N D
IT
IO
N S.
dw g
/2 4/
GEI CONSULTANTS OF MICHIGAN, P.C.
990 LALLEY ROAD
IRON RIVER, MI 49935
(906)214-4140
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
0 2/3/2023 FOR BID RAA
1 2/24/2023 ADDENDUM 1 RAA
If this scale bar does not measure 1" then drawing is not original scale.
For Bid
SHEET NAME
SHEET NO.
DRAFT
SL
C
-P A
IN
T
R
IV
ER
TR
A
IL
W A
SH
O
U T
R
EP
A
IR
C R
YS
TA
L
FA
LL
S, M I
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
Designed:
Checked:
Drawn:
GEI Project
Approved:
TNC
RAA
TNC
2203044
P.E. No.: 6201058357
RAA
PROPOSED
CONDITIONS
LOCATION 1
C-02
SCALE, FEET
20 40
EX TRAIL CENTERLINE
6" 23A SURFACE COURSE
' 14'
REMOVE WASHOUT MATERIAL DOWN TO NATIVE SOIL
AND SEED WITH UN-MULCHED , WETLAND SEED MIX
28FT - CULV, CL A, CMP, 18 INCH
2 - CULV, END SECTION
INV EL 1323.9 (W)
INV EL 1323.3 (E)
PR LEFT DITCH FLOW PATH
A C-04
A C-04
INSTALL SILT FENCE
16'
CULVERT END SECTION AND RIRRAP
SEE DETAIL ON DWG D-01
16' 13'
13'
LIMIT OF CLEARING (TYP)
CULVERT END SECTION AND RIRRAP SEE
DETAIL ON DWG D-01
VERTICAL SCALE, FEET
NOTE: 2x VERTICAL EXAGGERATION
HORIZONTAL SCALE, FEET
0 20 40
10 20
NOTES:
1. CONTRACTOR RESPONSIBLE FOR PROPER REMOVAL AND DISPOSAL OF BUCKTHORN LOCATED WITHIN LIMIT
OF CLEARING.
2. DISPOSE OF ALL MATERIAL REMOVED FROM WASHOUT AREA. NEW MATERIAL TO BE USED FOR
CONSTRUCTION OF NEW TRAIL STRUCTURE.
3. CONTRACTOR RESPONSIBLE TO CONSTRUCT PROJECT TO LINES AND GRADES SHOWN. CONTRACTOR MUST
CALCULATE AND VERIFY MATERIAL QUANTITIES.
ENGINEERS ESTIMATE QUANTITIES
(FOR INFORMATION ONLY)
TOTAL UNIT DESCRIPTION
120 CYD AGGREGATE SURFACE COURSE, 6 INCH, 23A
120 CYD AGGREGATE BASE, FILL, 23A
10 SYD RIPRAP, PLAIN
150 CYD WETLAND WASHOUT MATERIAL REMOVAL
390 FT EROSION CONTROL, SILT FENCE
28 FT CULV, CL A, CMP, 18 INCH
2 EA CULV, END SECTION
2 EA BARRICADE, TYPE III, HIGH INTENSITY, DOUBLE SIDED,
LIGHTED, FURN
CONTRACTOR TO INSTALL
BARRICADE(S) TO CLOSE TRAIL
ESTIMATED AREA OF WASHOUT MATERIAL: 1350 SFT
EARTH EXCAVATION
CONTRACTOR TO PROVIDE POSITIVE
DRAINAGE AWAY FROM OUTLET STRUCTURE POTENTIAL OLD CULVERT,
REMOVE FROM SERVICE
IF LOCATED
CONTRACTOR TO INSTALL
BARRICADE(S) TO CLOSE TRAILTWO (2) UNDERGROUND COMMUNICATION
PROTECT IN PLACE
file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt
SAN
SAN
SANSAN
SAN
SAN
SAN
SANSANSANSANSANSAN
SF
SF
SANSAN
SAN
SANSANSANSAN
SAN
SANSAN
SANSAN
SAN
SANSAN FIBR
FIBRFIBRFIBRFIBRFIBRFIBR
FIBRFIBRFIBRFIBRFIBRFIBRFIBRFIBR
130013001300
200+00 204+81
1310201+00 202+00 203+00 204+00
DITCH
STA 201+74
OFFSET 19.4
DITCH
STA 202+50
OFFSET 16.0 DITCH
STA 203+34
OFFSET 12.8
DITCH
STA 204+00
OFFSET 10.9
DITCH
STA 201+28
OFFSET 17.5
DITCH
STA 200+99
OFFSET 12.6
SF SF
SF
SF
SF
SF
SF
SF
LOC LOC
LOC
L8L7L6
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
.3
200+00
.7
200+50
.3
201+00
.9
201+50
.4
202+00
.0
202+50
.4
203+00
.4
203+50
.8
204+00
.4
204+50
.8
204+81
.3
200+00
.7
200+50
.3
201+00
.9
201+50
.4
202+00
.0
202+50
.4
203+00
.4
203+50
.8
204+00
.4
204+50
.8
204+81200+00 200+50
.5
201+00
.9
201+50
.8
202+00
.0
202+50
.2
203+00
.4
203+50
.6
204+00 204+50 204+81
EX
IS
TI
NG
G
RA
DE
PR
O
PO
SE
D
T R
A
IL
G R
A D
E
PR
O
PO
SE
D
L
EF
T D
IT
C
H G
R A
D E
EX 24IN CMP CULVERT
STA 201+56
INV EL 1302.8
(TO REMAIN)
EXTEND CULVERT
CULV, CL A, CMP, 24 INCH
STA 201+54
INV EL 1303.6
PROPOSED LEFT DITCH GRADE
STA 201+78
INV EL 1305.3
PO
B
FU
LL
D
EP
TH
SU
R
FA
C E
C O
U R
SE
, 2
3A , 6
IN
C
H
ST
A:
+6
PR LEFT DITCH GRADE
STA 204+23
INV EL 1311.1
PO
E
FU
LL
D
EP
TH
SU
R
FA
C E
C O
U R
SE
, 2
3A , 6
IN
C
H
ST
A:
+1
PROPOSED LEFT DITCH GRADE
STA 201+00
INV EL 1306.5
PO
E
R
IP
R R
AP
SL
O
PE
P R
O
TE
C
TI
O N
ST
A:
+1
PO
B
R
IP
R R
AP
SL
O
PE
P R
O
TE
C
TI
O N
ST
A:
+9
ALIGNMENT LINE TABLE
LINE #
L6
L7
L8
BEGIN STA
201+77.29
202+79.24
204+12.16
END STA
202+79.24
204+12.16
204+81.03
LENGTH
101.95'
132.92'
68.87'
BEGIN NORTHING
479516.66
479609.99
479732.39
BEGIN EASTING
25912459.12
25912418.09
25912366.27
END NORTHING
479609.99
479732.39
479794.45
END EASTING
25912418.09
25912366.27
25912336.40
DIRECTION
N23°43'48"W
N22°56'42"W
N25°42'08"W
C
AR
M O
D Y, T O
N Y
B :\W or ki ng \D
TM
B\
SL
C
P ai nt R iv er
O R
V Tr ai l W as ho ut \0
0_ C
AD
\D es ig n\ Sh ee ts
\P R
O
PO
SE
D
C O
N D
IT
IO
N S.
dw g
/2 4/
GEI CONSULTANTS OF MICHIGAN, P.C.
990 LALLEY ROAD
IRON RIVER, MI 49935
(906)214-4140
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
0 2/3/2023 FOR BID RAA
1 2/24/2023 ADDENDUM 1 RAA
If this scale bar does not measure 1" then drawing is not original scale.
For Bid
SHEET NAME
SHEET NO.
DRAFT
SL
C
-P A
IN
T
R
IV
ER
TR
A
IL
W A
SH
O
U T
R
EP
A
IR
C R
YS
TA
L
FA
LL
S, M I
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
Designed:
Checked:
Drawn:
GEI Project
Approved:
TNC
RAA
TNC
2203044
P.E. No.: 6201058357
RAA
PROPOSED
CONDITIONS
LOCATION 2
C-03
PAINT RIVER EDGE OF WATER
EXISTING TRAIL CENTERLINE
EXTEND CULVERT
CULV, CL A, CMP, 24 INCH, 8 FT
CULV, END SECTION
INV EL 1303.7
PR TRAIL CENTERLINE
EX CULVERT
PR LEFT DITCH GRADE
GRADE SLOPE 2.4%
PROPOSED TRAIL GRADE
AT PROPOSED CENTER LINE
EXISTING GRADE
A C-05
A C-05
REMOVE WASHOUT MATERIAL DOWN TO
NATIVE SOIL AND SEED WITH
UN-MULCHED , WETLAND SEED MIX
EXISTING UNDERGROUND SEWER FORCE MAIN ALIGNMENT
PROTECT IN PLACE
PROPOSED UNDERGROUND SEWER FORCE MAIN ALIGNMENT
TO BE CONSTRUCTED IN SEPARATE PROJECT
PROTECT IN PLACE IF INSTALLED
SCALE, FEET
30 60
PR LEFT DITCH GRADE
GRADE SLOPE 6.7%
PR LEFT DITCH GRADE
GRADE SLOPE 5.3%
CULVERT END SECTION AND RIRRAP
SEE DETAIL ON DWG D-01
TRANSITION SLOPE AT 3%
TRANSITION SLOPE AT 3%
INSTALL SILT FENCE
RIPRAP SLOPE PROTECTION
SEE DETAIL ON DWG D-01
LIMIT OF CLEARING
VERTICAL SCALE, FEET
NOTE: 2x VERTICAL EXAGGERATION
HORIZONTAL SCALE, FEET
0 30 60
0 15 30
EX SILT FENCE
NOTES:
1. CONTRACTOR RESPONSIBLE FOR PROPER REMOVAL AND DISPOSAL OF BUCKTHORN LOCATED WITHIN LIMIT
OF CLEARING.
2. DISPOSE OF ALL MATERIAL REMOVED FROM WASHOUT AREA. NEW MATERIAL TO BE USED FOR
CONSTRUCTION OF NEW TRAIL STRUCTURE.
3. CONTRACTOR RESPONSIBLE TO CONSTRUCT PROJECT TO LINES AND GRADES SHOWN. CONTRACTOR MUST
CALCULATE AND VERIFY MATERIAL QUANTITIES.
CONTRACTOR TO INSTALL
BARRICADE(S) TO CLOSE TRAIL
(TYP)
CONTRACTOR TO INSTALL RIPRAP PER
CMP FLARED END SECTION DETAIL
SEE DETAIL ON DWG D-01
ENGINEERS ESTIMATE QUANTITIES
(FOR INFORMATION ONLY)
TOTAL UNIT DESCRIPTION
85 CYD AGGREGATE SURFACE COURSE, 6 INCH, 23A
290 CYD AGGREGATE BASE, FILL, 23A
440 SYD RIPRAP, PLAIN
670 CYD WETLAND WASHOUT MATERIAL REMOVAL
440 FT EROSION CONTROL, SILT FENCE
8 FT CULV, CL A, CMP, 24 INCH
1 EA CULV, END SECTION
2 EA BARRICADE, TYPE III, HIGH INTENSITY, DOUBLE SIDED,
LIGHTED, FURN
ESTIMATED AREA OF WASHOUT MATERIAL: 7450 SFT
TWO (2) UNDERGROUND COMMUNICATION
PROTECT IN PLACE 1
file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt
INSTALLATION WITH TRENCHING
NOTES:
1. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
2. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY. 9" (225mm) MAXIMUM STORAGE HEIGHT.
3. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED.
EXTRA STRENGTH FILTER
FABRIC NEEDED WITHOUT
WIRE MESH SUPPORT
STEEL OR WOOD POST
ATTACH FILTER FABRIC
SECURELY TO UPSTREAM
SIDE OF POST
10' (3m) MAXIMUM SPACING WITH WIRE SUPPORT FENCE 6' (1.8m)
MAXIMUM SPACING WITHOUT
WIRE SUPPORT FENCE
FLOW
PONDING HEIGHT
8" (200 mm)
3/4" (20mm) MIN
DRAIN ROCK
FLOW
12" MIN
(300 MM)
9" MAX
(225 mm)
STORAGE HT
PONDING HEIGHT
FLOW
INSTALLATION WITHOUT TRENCHING
STEEL OR WOOD
POST
36" (1M) HIGH MAX
12" MIN
(300 mm)
4"x6" (100x150mm)
TRENCH WITH
COMPACTED BACKFILL
DEPTH
VARIES
EXISTING WETLAND
SOILS TO REMAIN
REMOVE WASHOUT
MATERIAL DOWNS TO
NATIVE WETLAND SOILS
SEE PER SPECS, NO MULCH
IN WETLAND AREAS
WASHOUT MATERIAL
CONSISTS OF SAND, GRAVEL,
AND GROUND BRUSH
NOTES:
1. CONNECTOR TO SUBMIT WETLAND SPOILS REMOVAL PLAN.
2. SEE SHEET G-02 FOR ADDITIONAL DETAILS.
C
AR
M O
D Y, T O
N Y
B :\W or ki ng \D
TM
B\
SL
C
P ai nt R iv er
O R
V Tr ai l W as ho ut \0
0_ C
AD
\D es ig n\ Sh ee ts
\D
ET
AI
LS
.d w g
/2
4/
GEI CONSULTANTS OF MICHIGAN, P.C.
990 LALLEY ROAD
IRON RIVER, MI 49935
(906)214-4140
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
0 2/3/2023 FOR BID RAA
1 2/24/2023 ADDENDUM 1 RAA
If this scale bar does not measure 1" then drawing is not original scale.
For Bid
SHEET NAME
SHEET NO.
DRAFT
SL
C
-P A
IN
T
R
IV
ER
TR
A
IL
W A
SH
O
U T
R
EP
A
IR
C R
YS
TA
L
FA
LL
S, M I
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
Designed:
Checked:
Drawn:
GEI Project
Approved:
TNC
RAA
TNC
2203044
P.E. No.: 6201058357
RAA
DETAILS
D-01
NOT TO SCALE
C-02,03 SILT FENCE
DETAIL
CMP CULVERT
MIN. O.D. + 24" 6" MIN. MDOT CL II
SAND BELOW PIPE
COMPACTED MDOT CL II SAND
VARIES
MIN. 12"
COMPACTED MDOT CL II SAND
AGGREGATE SURFACE COURSE, 6 INCH, 23A
MDOT CL II SAND
6" MIN THICKNESS
GEOTEXTILE SEPARATION
FABRIC (TOE IN EACH END)
3' (MIN)
STABLE GRADE
2' (MIN)
EXISTING
GRADE
RIPRAP, PLAIN
24" MIN THICKNESS
(TYP)
2' (MIN)
RIPRAP VOIDS TO BE FILLED
WITH EXCAVATED SPOILS FROM
WETLAND AREA LEAVING TOP
1/3 RIPRAP EXPOSED
WETLAND SEED MIX TO BE
PLACED ON SPOILS MATERIAL
NOTES:
1. RIP RAP SHALL CONFORM TO THE STANDARD SPECIFICATIONS
2. CONTRACTOR SHALL INSTALL NON-WOVEN 8 OZ/SYD GEOTEXTILE FABRIC BELOW ALL RIP RAP
WHEREVER UTILIZED. GEOTEXTILE FABRIC JOINTS SHALL OVERLAP A MINIMUM OF 2'
3. TYPICAL FLARED CMP END SECTION SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE
WITH MDOT STANDARD PLAN R-88-D
A A
5'
2' MIN
CMP DIA.
RIPRAP, PLAIN
24" MIN THICKNESS
(TYP)
2' MIN
CONNECTOR STRAP
CULVERT INVERT ELEVATION
SHOULD BE PLACED 1/6TH
THE HEIGHT BELOW DITCH
FLOW LINE
6"
NON-WOVEN
GEOTEXTILE
SECTION A-A
NOT TO SCALE
C-03 RIPRAP SLOPE PROTECTION
DETAIL
NOT TO SCALE
- CMP FLARED END SECTION
DETAIL
NOT TO SCALE
- CMP JOINT DETAIL
DETAIL
NOT TO SCALE
C-03 CMP CULVERT CROSS SECTION
DETAIL
PREFABRICATED CMP END SECTION
INSTALLED IN ACCORDANCE WITH
MDOT STANDARD PLAN R-88-D
NEW OR EXISTING CMP CULVERT
CMP CULVERT EXTENSION/NEW CMP CULVERT
COUPLING BAND
INSTALLED PER MANUFACTURER SPECIFICATIONS
OR AS DIRECTED BY ENGINEER
4 OZ. GEOTEXTILE FABRIC
WRAP AROUND ALL COMPLETED JOINTS
EXTEND 12" BEYOND EACH END OF COUPLING BAND
CONNECTOR STRAP
NOT TO SCALE
- WETLAND MATERIAL REMOVAL
DETAIL
Company Name Phone Email Comments Date
Blue Line Site Solutions Cody Rajala 906.370.8094 bluelinesitesolutions@outlook.com 2/15/2023
Blue Restoration, LLC Brendan Fosgitt 989.615.4682 bluerestorationllc@yahoo.com 2/15/2023
Catskill Remedial Contracting Services, Inc. Josh Guy 517.881.5411 j.guy@catskillremedial.com 2/15/2023
FA Industrial Services, Inc. Bill Casagranda 906.284.7374 b.casagranda@fais.build 2/15/2023
MD Contracting, Inc. Dan Robillard 906.201.0251 mdcontracting@gmail.com 2/15/2023
MJ VanDamme, Inc. Pete Ryynanen 906.346.2641 pete.ryynanen@mjvandamme.onmicrosoft.com 2/15/2023
Pine Creek Excavating Jared Gendron 906.282.1094 pinecreekexcavating@gmail.com 2/15/2023
WR Construction Will Rajala 906.362.2371 rajalaw@wrcmqt.com 2/15/2023
Pre-Bid Meeting: February 15, 2023 at 2:00PM ET
PRE-BID MEETING SIGN-IN SHEET
Department of Technology, Management and Budget
Design & Construction Division
Department of Natural Resources SLC-Paint River Washout Repair - File No. 751/22315.JBB
GEI Project No. 2203044
Bids Due: March 1, 2023 at 2:00PM ET
| 751_22315.JBB SLC Paint River Trail Washout Repair - Addendum 1 |
| 20230224_PAINT RIVER ORV TRAIL_ADD1_CAD-FILES |
| Sheets and Views |
| 3 EXISTING CONDITIONS |
| 4 PROPOSED CONDITIONS LOCATION 1 |
| 5 PROPOSED CONDITIONS LOCATION 2 |
| 8 DETAILS |
Copy of DTMB Pre-Bid Signin Sheet