This document contains the construction plans and specifications for the Sturgeon River Bridge Rehabilitation project in Houghton County and Holly Village, Michigan. The project, led by the Department of Technology, Management and Budget (DTMB) of the State of Michigan, involves the rehabilitation of the existing Sturgeon River Bridge, including clearing around the abutments, installing scour protection, and repairing the bridge deck and railing. The project is estimated to include 25 cubic yards of earth excavation, 176 square yards of heavy riprap, and 302 linear feet of railing removal and replacement. Bids are due by 2:00 PM on the specified deadline, and the contract term is not explicitly stated.
The document provides detailed technical specifications and construction drawings for the project, including notes on soil erosion and sedimentation control, utility coordination, and restoration requirements. Pricing terms, set-asides, and funding details are not included in this document, which appears to be focused on the technical aspects of the construction work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA LOCATION
MAP
CHICAGO
MILWAUKEE
LAKE
MICHIGAN
DETROIT
LAKE
HURON
SAULT
STE
MARIE
MARQUETTE
HOUGHTON
LAKE
SUPERIOR
DULUTH
MINNEAPOLIS
GREEN BAY
ESCANABA
TRAVERSE
CITY
GRAND RAPIDS
LANSING
PROJECT
LOCATION
CHAMPION
STURGEON RIVER BRIDGE REHABILITATION
SNOWMOBILE TRAIL #2
AREA LOCATION
MAP
GENERAL NOTES:
1. GENERAL NOTES APPLY TO ALL DRAWINGS.
2. EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE CONTRACT
DOCUMENTS AND SPECIFICATIONS CONTAINED HEREIN. ALL MATERIALS AND
WORKMANSHIP SHALL BE IN ACCORDING TO THE MICHIGAN DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION, 2012 EDITION,
AND SECTION C (3R) OF THE MICHIGAN DEPARTMENT OF TRANSPORTATION LOCAL
AGENCY PROGRAM GUIDELINES FOR GEOMETRICS - DATED 8-28-08, AND THE
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS, 2011 EDITION.
3. DO NOT SCALE DRAWINGS. ANY DIMENSIONAL INFORMATION REQUIRED WHICH IS
NOT INDICATED ON DRAWING DIMENSION STRINGS SHALL BE OBTAINED FROM THE
ENGINEER.
4. DIMENSIONS SHOWN ARE FINISH SURFACE OF EXISTING CONSTRUCTION, UNLESS
NOTED OTHERWISE.
5. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS (I.E.
EXISTING MATERIALS, FRAMING MEMBER SIZES AND LOCATIONS, METHODS OF
CONSTRUCTION). IF DISCREPANCIES ARE FOUND, NOTIFY ENGINEER BEFORE
PROCEEDING WITH WORK.
6. CONTRACTOR SHALL PAY ALL PERMIT FEES AND FEE REQUIRED FOR ANY PERMIT
EXTENSIONS.
7. CONTRACTOR SHALL MAINTAIN THE IMMEDIATE CONSTRUCTION SITE IN A SECURE,
CLEAN AND SAFE MANNER.
8. PROTECTION: CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR TAKING ALL
STEPS NECESSARY TO PROTECT THE PUBLIC FROM INJURY AND ADJACENT PROPERTY
DAMAGES DURING CONSTRUCTION AS REQUIRED BY LOCAL CODES.
9. REPAIR ALL EXISTING CONSTRUCTION AFFECTED BY NEW WORK TO ITS ORIGINAL
CONDITION.
10. THE LOCATION OF ALL PUBLIC UTILITIES SHOWN ON THESE PLANS IS TAKEN FROM
THE BEST AVAILABLE DATA. PURSUANT TO ACT 53 OF THE P.A. OF 1974, AS A
CONDITION OF THIS CONTRACT. NOTICE SHALL BE GIVEN TO MISS DIG PRIOR TO
UNDERGROUND WORK TO BE PERFORMED IN ACCORDANCE WITH THIS CONTRACT.
PHONE (800) 482-7171.
CIVIL
DRAWING INDEX:
C001 PROJECT NOTES
C101 PLAN OF SITE
C102 PROPOSED PLAN OF SITE
C202 GENERAL DETAILS
DT TITLE SHEET
DICKINSON COUNTY
I Certify That The Civil Plans Were Prepared Under My Direct Supervision
PROJECT LOCATION MAP
OHM PROJECT No.
DATE:
DTMB File No.
Index No.
7136-20-0100
09/30/2022
BID SET
751/20159.JBB
OWNER:
DEPARTMENT OF NATURAL RESOURCES
MARQUETTE CUSTOMER SERVICE CENTER
1990 US-41
MARQUETTE, MI 49855
PROJECT CONTACTS: ROB KATONA
ARCHITECT/ENGINEER:
OHM ADVISORS
424 HANCOCK STREET
HANCOCK, MI 49930
906.482.0535
PROJECT CONTACT - ZANE HYRKAS, PE APPLICATION
DATE
PERMITS APPROVAL DATE
BY CONTRACTOR
DTMB SESC
BY OWNER
EGLE/USACE JPA
3/25/2022
PROJECT LOCATION
N 45°46'46.89"
W 87°49'19.77"
P
L
U
R
I B
U
E
S
U
N
U
M
S
I
Q
U
E
R
E I
S
P E
N I
N S
U
L A
M
A
M O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ stu rg eo n_ riv er _b rid ge
_re ha b\D ra wi ng s\C ivi l\M isc
\20
CO
VE
R1
.1.
dw g S ep
, 2
2 -
:41 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
STRUCTURAL
S101 PLAN OF STRUCTURE
S201 PROPOSED PLAN OF STRUCTURE
S401 DELAMINATION ELEVATIONS
S501 SCOUR PROTECTION AT SOUTH ABUTMENT
S502 STRUCTURAL CROSS SECTIONS
I Certify That The Structural Plans Were Prepared Under My Direct Supervision
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
OHM PROJECT NO.
AutoCAD SHX Text DTMB File No.
AutoCAD SHX Text IDENTIFICATION No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET
AutoCAD SHX Text
DT
AutoCAD SHX Text
751/20159.JBB
AutoCAD SHX Text 09/30/2022
AutoCAD SHX Text
AutoCAD SHX Text
AR
AutoCAD SHX Text
MH
AutoCAD SHX Text
STURGEON RIVER BRIDGE REHAB
AutoCAD SHX Text
COVER
AutoCAD SHX Text
ZH
P
L
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N S
U
L A
M
A
M
O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ stu rg eo n_ riv er _b rid ge
_re ha b\D ra wi ng s\C ivi l\D eta ils \20
NO
T.
dw g
S ep
, 2
2 -
2:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
SF SF SF
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text DTMB No.
AutoCAD SHX Text
OHM PROJ.
AutoCAD SHX Text IDENTIFICATION No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET
AutoCAD SHX Text C-001
AutoCAD SHX Text 7136-20-0100
AutoCAD SHX Text
751/20159.JBB
AutoCAD SHX Text 09/30/2022
AutoCAD SHX Text
AutoCAD SHX Text
AR
AutoCAD SHX Text
CH
AutoCAD SHX Text
STURGEON RIVER BRIDGE REHAB
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
MM
AutoCAD SHX Text
ZH
AutoCAD SHX Text
AutoCAD SHX Text ADJ ADJUST ADJUST APPROX APPROXIMATELY APPROXIMATELY ASPH ASPHALT ASPHALT B/BANK BOTTOM OF BANK BOTTOM OF BANK CONC CONCRETE CONCRETE CT CURB TRANSITION CURB TRANSITION C&G CURB AND GUTTER CURB AND GUTTER CVT CITY, VILLAGE, OR TOWNSHIP CITY, VILLAGE, OR TOWNSHIP DIA DIAMETER DIAMETER DW DOMESTIC WATER DOMESTIC WATER EA EDGE OF ASPHALT EDGE OF ASPHALT ELEC ELECTRIC ELECTRIC ELEV ELEVATION ELEVATION EX EXISTING EXISTING F/C FACE OF CURB FACE OF CURB FF FINISH FLOOR FINISH FLOOR FG FINISHED GRADE FINISHED GRADE FT FEET FEET HDCP HANDICAP HANDICAP INV INVERT ELEVATION INVERT ELEVATION OB OBSERVATION WELL OBSERVATION WELL OBS OBSERVED OBSERVED OH OVERHEAD OVERHEAD OT OVER TOPPING OVER TOPPING PROP PROPOSEDPROPOSED
AutoCAD SHX Text R RADIUS RADIUS RES RESET RESET RIM TOP OF UTILITY/DRAINAGE STRUCTURE TOP OF UTILITY/DRAINAGE STRUCTURE ROW RIGHT-OF-WAY RIGHT-OF-WAY SAN SANITARY SANITARY SP SPRING WATER SPRING WATER SQFT SQUARE FEET SQUARE FEET STM STORM STORM SYD SQUARE YARD SQUARE YARD TC TOP OF CURB TOP OF CURB TELE TELEPHONE TELEPHONE TP TRAVERSE POINT TRAVERSE POINT TS&M TOPSOIL, SEED & MULCH TOPSOIL, SEED & MULCH TYP TYPICAL TYPICAL T/BANK TOP OF BANK TOP OF BANK UG UNDER GROUND UNDER GROUND WEL WELL LINES WELL LINES W# WELL LINE WELL LINE WM WATER MAIN WATER MAIN WTR WATER WATER YBT YELLOW BENCH TIE YELLOW BENCH TIE D RIPRAP SIZE WHERE 50% OF STONES 50RIPRAP SIZE WHERE 50% OF STONES ARE LARGER D MAX STONE SIZE / AVG DEPTH OF MAXMAX STONE SIZE / AVG DEPTH OF RIPRAP
AutoCAD SHX Text REMOVAL 1. REMOVALS SHALL BE DONE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. REMOVALS SHALL BE DONE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2. ANY ADDITIONAL TREE REMOVALS, CLEARING, GRADING, ETC. NEEDED FOR THE CONTRACTOR'S ANY ADDITIONAL TREE REMOVALS, CLEARING, GRADING, ETC. NEEDED FOR THE CONTRACTOR'S STAGING AND/OR WORK OPERATIONS SHALL BE COMPLETED AND AREA RESTORED TO THE SATISFACTION OF THE OWNER WITHOUT ADDITIONAL COMPENSATION. 3. ADDITIONAL WORK OUTSIDE OF THE LIMITS SHOWN ON THE PLAN SHALL BE SUBMITTED TO THE ADDITIONAL WORK OUTSIDE OF THE LIMITS SHOWN ON THE PLAN SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO STARTING THE ADDITIONAL WORK. 4. MATERIALS REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE PROPERLY MATERIALS REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE PROPERLY DISPOSED OF AT AN OFF SITE LOCATION, OTHER THAN EARTHWORK SPOILS AT THE BILL NICHOLLS SITE WHICH ARE PERMITTED TO BE STOCKPILED AT THE LOCATION SPECIFIED ON THE PLANS.
AutoCAD SHX Text MAINTENANCE OF TRAFFIC 1. CONTRACTOR TO PROVIDE NECESSARY SIGNAGE, BARRICADES, AND OTHER DEVICES FOR CONTRACTOR TO PROVIDE NECESSARY SIGNAGE, BARRICADES, AND OTHER DEVICES FOR PROTECTION OF THE PUBLIC AND CONSTRUCTION WORKERS PRIOR TO PERFORMING ANY WORK. 2. CONTRACTOR SHALL COORDINATE STAGING AND ACCESSIBILITY WITH OWNER. CONTRACTOR SHALL COORDINATE STAGING AND ACCESSIBILITY WITH OWNER. 3. ALL TEMPORARY SIGNS AND BARRICADES SHALL CONFORM TO THE MICHIGAN MANUAL OF ALL TEMPORARY SIGNS AND BARRICADES SHALL CONFORM TO THE MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD), 2011 EDITION, AS REVISED. 4. INSTALL SIGNAGE AS SHOWN ON SHEET C-110. LOCATIONS OF SIGNS SHOWN ARE INSTALL SIGNAGE AS SHOWN ON SHEET C-110. LOCATIONS OF SIGNS SHOWN ARE APPROXIMATE AND MAY REQUIRE ADJUSTMENT TO MEET FIELD CONDITIONS, AS DIRECTED BY THE ENGINEER. 5. TYPE III BARRICADES USED ON THIS PROJECT SHALL BE 8' LONG AND BE HIGH INTENSITY TYPE III BARRICADES USED ON THIS PROJECT SHALL BE 8' LONG AND BE HIGH INTENSITY DOUBLE SIDED. 6. TEMPORARY SIGNS AND BARRICADES WITHIN THE CONSTRUCTION INFLUENCE AREA SHALL BE TEMPORARY SIGNS AND BARRICADES WITHIN THE CONSTRUCTION INFLUENCE AREA SHALL BE PROVIDED BY THE CONTRACTOR.
AutoCAD SHX Text DTMB: SOIL EROSION AND SEDIMENTATION CONTROL 1. SUBMIT CONSTRUCTION SEQUENCE & SESC PLAN FOR APPROVAL BY DTMB SESC UNIT PRIOR TO SUBMIT CONSTRUCTION SEQUENCE & SESC PLAN FOR APPROVAL BY DTMB SESC UNIT PRIOR TO DOING WORK. CONSTRUCT AND MAINTAIN ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AND REMOVE WHEN ACCEPTABLE. NON COMPLIANCE COULD RESULT IN $500/DAY FINES BY THE AGENCY AND ASSESSMENT OF ACTUAL DAMAGE COSTS. WITH O&M MANUAL FURNISH SECTION ON OWNER MAINTENANCE OF PERMANENT CONTROLS. IMPLEMENT CONTINUOUS INSPECTION AND MAINTENANCE PROGRAMS. OWNER SHALL CONTINUE AFTER PROJECT COMPLETION. 2. SOIL EROSION AND SEDIMENTATION CONTROL SHALL BE IN ACCORDANCE WITH THE 2020 SOIL EROSION AND SEDIMENTATION CONTROL SHALL BE IN ACCORDANCE WITH THE 2020 MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATION FOR HIGHWAY CONSTRUCTION, MDOT STANDARD PLAN R-96 SERIES, AND DTMB REQUIREMENTS. 3. THE CONTRACTOR SHALL EMPLOY A MICHIGAN DEPARTMENT OF ENVIRONMENTAL GREAT LAKES THE CONTRACTOR SHALL EMPLOY A MICHIGAN DEPARTMENT OF ENVIRONMENTAL GREAT LAKES AND ENERGY CERTIFIED STORM WATER OPERATOR ON ALL SITES WITH A DISTURBANCE OF FIVE OR MORE ACRES (PERMIT-BY-RULE). THE OPERATOR SHALL COMPLETE ALL INSPECTIONS AND REPORTS TO COMPLY WITH SESC PERMIT REQUIREMENTS. 4. THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS IN SUCH A MANNER AS TO MINIMIZE THE THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS IN SUCH A MANNER AS TO MINIMIZE THE AREAS LEFT BARREN DURING CONSTRUCTION AND TO DISTURB ONLY THOSE AREAS ABSOLUTELY REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. 5. EROSION CONTROL ITEMS SHALL BE INSTALLED AND MAINTAINED ON A REGULAR BASIS AS EROSION CONTROL ITEMS SHALL BE INSTALLED AND MAINTAINED ON A REGULAR BASIS AS DIRECTED BY THE ENGINEER AND SHALL BE REMOVED WHEN NO LONGER EFFECTIVE AS DETERMINED BY THE ENGINEER. TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL PERMANENT SOIL CONTROL IS IN PLACE AND STABILIZED. NO SEPARATE PAYMENT SHALL BE ALLOWED FOR EITHER MAINTENANCE OF REMOVAL OF THE EROSION CONTROL ITEMS. 6. THE CONTRACTOR SHALL FOLLOW LOCAL RULES AND REGULATIONS FOR SOIL EROSION AND THE CONTRACTOR SHALL FOLLOW LOCAL RULES AND REGULATIONS FOR SOIL EROSION AND SEDIMENTATION CONTROL FOR ALL MATERIALS THAT ARE DISPOSED OF OFF THE PROJECT SITE. 7. IF THE PROJECT OR ANY CONSTRUCTION ACTIVITY IS STOPPED FOR ANY LENGTH OF TIME OTHER IF THE PROJECT OR ANY CONSTRUCTION ACTIVITY IS STOPPED FOR ANY LENGTH OF TIME OTHER THEN THAT ENCOUNTERED IN A NORMAL WORK WEEK, EVERY PRECAUTION SHALL BE TAKEN TO PROTECT THE UNCOMPLETED WORK FROM EROSION, INCLUDING THE PLACEMENT OF RIP RAP, HAY BALES OR OTHER ACCEPTABLE TEMPORARY PRECAUTION. 8. THE CONTRACTOR SHALL SWEEP PAVED ROADS AND OTHER PAVED SURFACES DAILY TO REMOVE THE CONTRACTOR SHALL SWEEP PAVED ROADS AND OTHER PAVED SURFACES DAILY TO REMOVE TRACKED SOIL AND DEBRIS. 9. THE CONTRACTOR SHALL INSTALL SILT FENCES AS TEMPORARY EROSION AND SEDIMENTATION THE CONTRACTOR SHALL INSTALL SILT FENCES AS TEMPORARY EROSION AND SEDIMENTATION CONTROL IN DISTURBED AREAS AS REQUIRED, AS SHOWN ON THE PLANS. 10. SPOILS ARE NOT PERMITTED TO BE STOCKPILED ANYWHERE ONSITE OTHER THAN THE LOCATIONS SPOILS ARE NOT PERMITTED TO BE STOCKPILED ANYWHERE ONSITE OTHER THAN THE LOCATIONS SHOWN ON THE PLANS. 11. SPOIL PILES SHALL BE GRADED SO THAT THE SLOPES ARE NOT STEEPER THEN 3:1 AND SHALL SPOIL PILES SHALL BE GRADED SO THAT THE SLOPES ARE NOT STEEPER THEN 3:1 AND SHALL BE SEEDED AND MULCHED BLANKETED. BLANKETED. 12. SPOIL PILES SHALL HAVE SILT FENCE PLACED AT THE BASE OF THE SPOIL PILES TO RETAIN SPOIL PILES SHALL HAVE SILT FENCE PLACED AT THE BASE OF THE SPOIL PILES TO RETAIN SOIL UNTIL VEGETATION IS ESTABLISHED. 13. SOIL EROSION AND SEDIMENTATION CONTROLS SHALL BE INSTALLED AND MAINTAINED ACCORDING SOIL EROSION AND SEDIMENTATION CONTROLS SHALL BE INSTALLED AND MAINTAINED ACCORDING TO THE DETAILS AND SPECIFICATIONS INCLUDED IN THE DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET'S SOIL EROSION AND SEDIMENTATION CONTROL GUIDEBOOK DATED FEBRUARY 2005.
AutoCAD SHX Text DTMB: GENERAL NOTES 1. IN CASE OF DISCREPANCIES BETWEEN THE MDOT STANDARD SPECIFICATIONS AND MICHIGAN IN CASE OF DISCREPANCIES BETWEEN THE MDOT STANDARD SPECIFICATIONS AND MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET (DTMB) DC SPEC, THE DTMB PROVISIONS CONTROL.
AutoCAD SHX Text MDOT TRAFFIC SAFETY STANDARD PLANS WHERE THE FOLLOWING ITEMS ARE CALLED FOR IN THE PLANS THEY ARE TO BE CONSTRUCTED ACCORDING TO THE STANDARD PLANS GIVEN BELOW, OPPOSITE EACH ITEM UNLESS OTHERWISE INDICATED. TITLE PLAN NO. PLAN NO. PLAN NO. TEMPORARY TRAFFIC CONTROL DEVICES WZD-125-E* WZD-125-E* GROUND DRIVEN SIGN SUPPORTS FOR TEMPORARY SIGNS WZD-100-A WZD-100-A TABLES FOR "L", "D" AND "B" VALUES M0020a M0020a TYPICAL ADVANCE SIGNING TREATMENT FOR SHORT TERM M0040a M0040a STATIONARY WORK ZONE WHERE TRAFFIC CONTROL REMAINS AT END OF WORK DAY *DENOTES SPECIAL DETAIL
AutoCAD SHX Text GENERAL NOTES 1. IT IS THE CONTRACTORS RESPONSIBILITY TO SECURE ALL PERMITS AND POST ALL BONDS IT IS THE CONTRACTORS RESPONSIBILITY TO SECURE ALL PERMITS AND POST ALL BONDS PRIOR TO CONSTRUCTION, OR ENSURE THAT ALL REQUIRED PERMITS AND BONDS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. 2. ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE IN ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE IN PLACE PRIOR TO STARTING REMOVALS. 3. THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGE TO STREETS, SIDEWALKS, OTHER THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGE TO STREETS, SIDEWALKS, OTHER STRUCTURES, AND ADJACENT AREAS CAUSED BY DEMOLITION OR HAULING OPERATIONS. 4. THE CONTRACTOR SHALL TAKE ALL NECESSARY ACTIONS TO ENSURE WORKER SAFETY AND THE CONTRACTOR SHALL TAKE ALL NECESSARY ACTIONS TO ENSURE WORKER SAFETY AND COMPLIANCE WITH MI-OSHA GUIDELINES. 5. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS PRIOR TO CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS PRIOR TO CONSTRUCTION. ADJUST WORK AS REQUIRED TO MEET FIELD DIMENSIONS AT NO ADDITIONAL COST TO THE OWNER. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING WITH WORK. 6. THE IMPROVEMENTS COVERED BY THESE PLANS SHALL BE DONE IN ACCORDANCE WITH THE IMPROVEMENTS COVERED BY THESE PLANS SHALL BE DONE IN ACCORDANCE WITH ACCOMPANYING SPECIFICATIONS FOR THIS PROJECT INCLUDING THE 2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION, AASHTO'S 2011 POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS, THE 2011 MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, THE MICHIGAN DEPARTMENT OF NATURAL RESOURCES, THE MDOT DRAINAGE MANUAL, AND THE ALUMINUM CULVERT MANUFACTURERS REQUIREMENTS. 7. THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS IN SUCH A MANNER AS TO THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS IN SUCH A MANNER AS TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL CODES FOR NOISE LEVELS, HOURS OF OPERATION FOR CONSTRUCTION ACTIVITY, VIBRATIONS, OR ANY OTHER RESTRICTIONS. NO ADDITIONAL COMPENSATION WILL BE DUE TO THE CONTRACTOR FOR ANY WINTER PROTECTION MEASURES THAT MAY BE REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS. 8. COORDINATION BY THE CONTRACTOR; NO ADDITIONAL COMPENSATION SHALL BE PAID TO COORDINATION BY THE CONTRACTOR; NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY DELAY OR INCONVENIENCE DUE TO MATERIAL SHORTAGES OR DELAYS DUE TO THE OPERATIONS OF SUCH OTHER PARTIES DOING WORK INDICATED OR SHOWN ON THE PLANS OR IN THE PROPOSAL OR FOR ANY DELAYS IN CONSTRUCTION DUE TO THE ENCOUNTERING OF EXISTING UTILITIES THAT MAY OR MAY NOT BE SHOWN ON THE PLANS. 9. ANY QUANTITIES AND DIMENSIONS SHOWN ON THE PLANS ARE PROVIDED FOR ANY QUANTITIES AND DIMENSIONS SHOWN ON THE PLANS ARE PROVIDED FOR INFORMATION ONLY, CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION.
AutoCAD SHX Text EARTHWORK & GRADING 1. THE CONTRACTOR SHALL RESTORE ALL ADJACENT AREAS UPON COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL RESTORE ALL ADJACENT AREAS UPON COMPLETION OF THE PROJECT. 2. ALL DISTURBED AREAS SHALL BE BROUGHT TO FINAL GRADE AND STABILIZED AS SOON AS ALL DISTURBED AREAS SHALL BE BROUGHT TO FINAL GRADE AND STABILIZED AS SOON AS POSSIBLE AFTER BEING DISTURBED. PERMANENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED WITHIN FIVE CALENDAR DAYS OF COMPLETING FINAL GRADING. 3. ALL PERMANENT SLOPES STEEPER THAN 4:1 SHALL BE STABILIZED USING MULCH BLANKETS. ALL PERMANENT SLOPES STEEPER THAN 4:1 SHALL BE STABILIZED USING MULCH BLANKETS. 4. CONTRACTOR SHALL PLACE SALVAGED AND ADDITIONAL TOPSOIL, SEED AND MULCH ON ALL CONTRACTOR SHALL PLACE SALVAGED AND ADDITIONAL TOPSOIL, SEED AND MULCH ON ALL DISTURBED AREAS AS DIRECTED BY THE ENGINEER TO PROVIDE A MINIMUM 3" THICKNESS. 5. ALL FILL SHALL BE CLEAN SATISFACTORY MATERIAL AS IDENTIFIED IN THE SPECIFICATIONS. ALL FILL SHALL BE CLEAN SATISFACTORY MATERIAL AS IDENTIFIED IN THE SPECIFICATIONS. 6. SURPLUS EXCAVATED MATERIAL MAY BE USED TO FLATTEN FILL SLOPES AS DIRECTED BY THE SURPLUS EXCAVATED MATERIAL MAY BE USED TO FLATTEN FILL SLOPES AS DIRECTED BY THE ENGINEER. ANY SURPLUS OR UNSUITABLE MATERIAL, INCLUDING PEAT EXCAVATION, UNABLE TO BE USED SHALL BECOME THE PROPERTY OF THE CONTRACTOR FOR DISPOSAL. 7. PROTECT AREAS ADJACENT TO MATERIAL STOCKPILES WITH SILT FENCE AS REQUIRED. PROTECT AREAS ADJACENT TO MATERIAL STOCKPILES WITH SILT FENCE AS REQUIRED.
AutoCAD SHX Text
DECIDUOUS TREE
AutoCAD SHX Text
CONIFEROUS TREE
AutoCAD SHX Text
ABBREVIATIONS:
AutoCAD SHX Text AGGREGATE SURFACE CONSTRUCTION 1. NEW AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL MEET THE REQUIREMENTS OF NEW AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL MEET THE REQUIREMENTS OF SECTION 902 OF THE 2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION AND SHALL BE MDOT CLASS 23A OR AS APPROVED BY THE ENGINEER. 2. AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL BE CONSTRUCTED PER SECTION AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL BE CONSTRUCTED PER SECTION 306 OF THE 2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 3. THE ROCKLAND SITE EXISTING TRAIL AGGREGATE IS A STONE TYPE THAT SHALL BE SALVAGED THE ROCKLAND SITE EXISTING TRAIL AGGREGATE IS A STONE TYPE THAT SHALL BE SALVAGED AND REINSTALLED. 4" OF 23A GRAVEL SHALL BE PLACED ON TOP OF THE SALVAGED GRAVEL.
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
TRAVERSE POINT
AutoCAD SHX Text
ROW
AutoCAD SHX Text
%%UTOPO LEGEND
AutoCAD SHX Text
HEDGE/TREE
AutoCAD SHX Text
CENTERLINE OF DITCH/STREAM
AutoCAD SHX Text
GRADING LIMIT
AutoCAD SHX Text
(SLOPE STAKE)
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
CENTERLINE OF DITCH
AutoCAD SHX Text
%%UPROPOSED
AutoCAD SHX Text
%%UEXISTING
AutoCAD SHX Text
ROW
AutoCAD SHX Text
%%UEXISTING SYMBOL LEGEND
AutoCAD SHX Text
%%UPROPOSED HATCH LEGEND
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
SLOPE RESTORATION
AutoCAD SHX Text BM #xx
AutoCAD SHX Text
SB#XXX
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
SOIL BORING
AutoCAD SHX Text
CRANE MAT
AutoCAD SHX Text
HAND CHIP AND PATCHING
AutoCAD SHX Text
FLOWABLE FILL
AutoCAD SHX Text
EARTH EXCAVATION
AutoCAD SHX Text
%%UREMOVAL HATCH LEGEND
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
CLEARING LIMITS
AutoCAD SHX Text
SAND BAGS
AutoCAD SHX Text
EDGE OF WATER
AutoCAD SHX Text
SEDIMENT BASIN
AutoCAD SHX Text
TP#
AutoCAD SHX Text
SOIL EROSION AND SEDIMENTATION CONTROL ITEMS
AutoCAD SHX Text
(SEE STANDARD PLAN R-96-SERIES FOR DETAILS)
AutoCAD SHX Text
KEY NO
AutoCAD SHX Text
NAME
AutoCAD SHX Text
PERMANENT/TEMPORARY SEEDING
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
FILTER BAG
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DAM - SAND BAGS
AutoCAD SHX Text
AutoCAD SHX Text RESTORATION 1. PROVIDE SCREENED, WEED-FREE TOPSOIL FOR RESTORATION. PROVIDE SCREENED, WEED-FREE TOPSOIL FOR RESTORATION. SEED WITH A MDOT TYPE THV MIX AT 220 LBS/ACRE. 2. SEED SHOULD BE EVENLY BROADCAST ON THE PREPARED SOIL AND ROLLED OR LIGHTLY SEED SHOULD BE EVENLY BROADCAST ON THE PREPARED SOIL AND ROLLED OR LIGHTLY RAKED INTO THE SEED BED. DO NOT OVER BURY. 3. USE CERTIFIED WEED-FREE STRAW MULCH IN AREAS WITHIN THE FLOODPLAIN. USE CERTIFIED USE CERTIFIED WEED-FREE STRAW MULCH IN AREAS WITHIN THE FLOODPLAIN. USE CERTIFIED WEED-FREE STRAW MULCH BLANKET IN AREAS OUTSIDE THE FLOODPLAIN. APPLY AT 1 TON PER ACRE OR APPROXIMATELY 90% COVERAGE. 4. IN SLOPE RESTORATION AREAS WITH SLOPES OVER 3H:1V, PLACE HIGH VELOCITY MULCH IN SLOPE RESTORATION AREAS WITH SLOPES OVER 3H:1V, PLACE HIGH VELOCITY MULCH BLANKET OVER STRAW MULCH. OVERLAP AND STAKE ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. USE BIODEGRADABLE WOOD STAKES.
AutoCAD SHX Text
MULCH BLANKET AND HIGH VELOCITY MULCH BLANKET
AutoCAD SHX Text
AutoCAD SHX Text
RAILING
AutoCAD SHX Text GENERAL STRUCTURAL NOTES 1. LOADS LOADS 1.1. GUARDRAIL LIVE LOAD: PER AASHTO 17TH ED - 50 PLF TRANSVERSE AND LATERAL GUARDRAIL LIVE LOAD: PER AASHTO 17TH ED - 50 PLF TRANSVERSE AND LATERAL SIMULTANEOUSLY AT RAILS AND 50 PLF * S TRANSVERSE POINT LOAD ON POST AT ELEVATION OF TOP RAIL CL. A NON-CURRENT TRAFFIC IMPACT LOAD OF 5000 LBS TRANSVERSELY OUTWARD, 2500 LBS LONGITUDINALLY AND 1250 LBS TRANSVERSELY INWARD DISTRIBUTED IN ACCORDANCE WITH SECTION 2.7.1.3 OF THE 17TH EDITION OF AASHTO BRIDGE DESIGN SPECIFICATION IS APPLIED TO THE LOWER RAIL ELEMENTS AND RAILING POSTS 2. WELDING SHALL CONFORM TO THE APPROPRIATE PROVISIONS OF THE ANSI/AWS D1.1 WELDING SHALL CONFORM TO THE APPROPRIATE PROVISIONS OF THE ANSI/AWS D1.1 STRUCTURAL WELDING CODE AND/OR ANSI/AWS D1.5 BRIDGE WELDING CODE. WELDING ELECTRODES TO BE MINIMUM E70. XX LOW-HYDROGEN ELECTRODES COMPATIBLE WITH BASE METALS. ALL WELDING SHALL BE PERFORMED BY AWS QUALIFIED WELDERS. 3. CONTRACTOR SHALL FIELD MEASURE EXISTING BRIDGE STRUCTURE PRIOR TO FABRICATION AND CONTRACTOR SHALL FIELD MEASURE EXISTING BRIDGE STRUCTURE PRIOR TO FABRICATION AND SUBMITTAL OF THE SHOP DRAWINGS FOR THE BRIDGE RAILING SYSTEM. ADJUSTMENTS TO THE FINAL LAYOUT ARE CONSIDERED INCIDENTAL AND SHALL BE INCLUDED IN THE CONTRACT PRICE. 4. THE DESIGN OF THE STRUCTURAL MEMBERS IS BASED ON MATERIAL OF THE FOLLOWING GRADES THE DESIGN OF THE STRUCTURAL MEMBERS IS BASED ON MATERIAL OF THE FOLLOWING GRADES AND STRESSES, UNO: STRUCTURAL STEEL: WIDE FLANGE, ANGLES AND PLATES ASTM A588, GRADE 50 Fy=50,000 PSI Fy=50,000 PSI HOLLOW STRUCTURAL SECTIONS (HSS) ASTM A847 Fy=50,000 PSI Fy=50,000 PSI STRUCTURAL TIMBER: PRESSURE TREATED SOUTHERN YELLOW PINE, #2 OR BETTER 5. FASTENERS INTO WOOD SHALL BE HOT DIPPED GALVANIZED, UNO. FASTENERS TO CORROSION FASTENERS INTO WOOD SHALL BE HOT DIPPED GALVANIZED, UNO. FASTENERS TO CORROSION RESISTANT WEATHERING STEEL SHALL BE 304 STAINLESS STEEL, UNO. DO NOT CONNECT GALVANIZED AND PLAIN STEEL TOGETHER.
AutoCAD SHX Text UTILITY NOTES 1. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING MISS-DIG (811) AT LEAST 3 WORKING DAYS PRIOR TO EXCAVATION. 2. THE UTILITY LOCATIONS ARE BASED ON FIELD OBSERVATIONS AND A CAREFUL REVIEW OF THE UTILITY LOCATIONS ARE BASED ON FIELD OBSERVATIONS AND A CAREFUL REVIEW OF UTILITY RECORDS. HOWEVER, IT IS NOT POSSIBLE TO DETERMINE THE PRECISE SIZE, LOCATION, DEPTH, PRESSURE, OR ANY OTHER CHARACTERISTICS OF UNDERGROUND UTILITIES, TANKS OR SEPTIC FIELDS WITHOUT EXCAVATION. THEREFORE, WE CANNOT GUARANTEE THE ACCURACY OR COMPLETENESS OF THE BURIED UTILITY INFORMATION HEREON SHOWN. THE CONTRACTOR SHALL HIRE A PRIVATE UTILITY LOCATOR TO LOCATE UTILITIES ON SITE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THESE UTILITY LOCATIONS PRIOR TO CONSTRUCTION AND MAKE EVERY EFFORT TO PROTECT AND/OR RELOCATE THEM AS REQUIRED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER/SURVEYOR AS SOON AS POSSIBLE IN THE EVENT A DISCREPANCY IS FOUND. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE PROTECTION OF ALL EXISTING THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. ALL UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED WITH LIKE MATERIAL. THE EXACT LOCATION OF EXISTING UTILITIES SHALL BE LOCATED BY HAND DIGGING. ALGER DELTA ELEC ELECTRIC ELECTRIC 426 N 9TH STREET, GLADSTONE, MI 49837 SHANNON PRIEBE 906-428-4141 SPRIEBE@ALGERDELTA.COM AT&T TELECOM TELECOM 211 E B ST, IRON MOUNTAIN, MI 49801 MARSHA BERTOLDI 906-396-9488 MB8983@ATT.com
AutoCAD SHX Text
AGGREGATE SURFACE
RAILING
S
F
S
F
S
F
S
F
S
F
S F
S F
S
F
S
F
S
F
S F
S
F
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
3020105
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N
S U
L
A M
A
M
O E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ stu rg eo n_ riv er _b rid ge
_re ha b\D ra wi ng s\C ivi l\P lan s_ Co ns t\2
0C
ON
.dw g
S ep
, 2
2 -
2:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
40.0'
40.0'
SILT FENCE, 82 LF
SILT FENCE, 57 LF
LIMITS OF CLEARING,
TYP
EXCAVATION, EARTH 25 CYD
CLEARING LIMITS, TYP
EXCAVATION,
EARTH 25 CYD
(2) TYPE III BARRICADES
(2) TYPE III BARRICADES
NOTES:
1. CLEARING BETWEEN ABUTMENTS
SHALL BE PERFORMED BY HAND.
CLEARING LIMITS, TYP
TURBIDITY CURTAIN DEEP, 125 FT
ALTERNATE 1: TURBIDITY CURTAIN SHALLOW, 73 FT
ALTERNATE 1:
PERFORM CLEARING
AS NEEDED TO GET
EQUIPMENT DOWN
SLOPE TO PIER.
HIGH WATER CHANNEL
DREDGE/EXCAVATE FOR
INSTALLATION OF SCOUR
PROTECTION
ALTERNATE 1: DREDGE/EXCAVATE FOR
INSTALLATION OF SCOUR
PROTECTION.
00401300120
TODD JOHNSON
00401300150
GREGORY MAULE
00401300130
JOHN E & BARBARA J GELINE
00401300150
GREGORY MAULE
FOR INFORMATIONAL PURPOSES ONLY
R
O W
ELEVATION PLAN OF SITE1
SCOUR HOLE 2FT DEEP,
6FT WIDE, 15FT LONG
DREDGE/EXCAVATE
FOR TOE OF SCOUR
PROTECTION
ALTERNATE 1:
DREDGE/EXCAVATE
FOR INSTALLATION OF
SCOUR PROTECTION.
TURBIDITY CURTAIN
PLAN OF SITE2
ALTERNATE 3: CLEARING FROM NORTH ABUTMENT TO PIER.
AutoCAD SHX Text
T/BANK
AutoCAD SHX Text
DITCH
AutoCAD SHX Text
T/BANK
AutoCAD SHX Text
PIER
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
STURGEON RIVER
AutoCAD SHX Text
STURGEON RIVER
AutoCAD SHX Text
EX PILES
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
B/BANK
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
EXISTING RIPRAP
AutoCAD SHX Text
EXISTING METAL POST
AutoCAD SHX Text
EXISTING RIPRAP
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EX PILES
AutoCAD SHX Text
EXISTING METAL POST
AutoCAD SHX Text
OHWM 845.00
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text DTMB No.
AutoCAD SHX Text
OHM PROJ.
AutoCAD SHX Text IDENTIFICATION No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET
AutoCAD SHX Text C-101
AutoCAD SHX Text 7136-20-0100
AutoCAD SHX Text
751/20159.JBB
AutoCAD SHX Text 09/30/2022
AutoCAD SHX Text
AutoCAD SHX Text
AR
AutoCAD SHX Text
MH
AutoCAD SHX Text
STURGEON RIVER BRIDGE REHAB
AutoCAD SHX Text
PLAN OF SITE
AutoCAD SHX Text
MM
AutoCAD SHX Text
ZH
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
SURFACE OF WATER 05/27/21 844.85'
1" = 10'
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N
S U
L
A M
A
M
O E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ stu rg eo n_ riv er _b rid ge
_re ha b\D ra wi ng s\C ivi l\P lan s_ Co ns t\2
0C
ON
.dw g
S ep
, 2
2 -
2:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
00401300120
TODD JOHNSON
00401300150
GREGORY MAULE
00401300130
JOHN E & BARBARA J GELINE
(2) TYPE III BARRICADES
30.0' 30.0'
30 FT WOOD FENCING,
6 FT POST SPACING,
SEE DETAIL 2 ON C-202
30 FT WOOD FENCING,
6 FT POST SPACING,
SEE DETAIL 2 ON C-202
ALTERNATE 1:
RIPRAP PLAIN, 107 SYD,
SEE DETAIL 1 ON S-201.
(2) TYPE III BARRICADES
SLOPE RESTORATION, 87 SYD
SLOPE RESTORATION, 68 SYD
ALTERNATE 1:
SLOPE RESTORATION, 66 SYD
AGGREGATE SURFACE CSE,
6 INCH, 42 SYD
CRANE MATS, 67 SYD
AGGREGATE SURFACE CSE,
6 INCH, 43 SYD
SCOUR REPAIR - SEE SHEET S-201
ALTERNATE 1:
BUILD UP CRANE MATS AS NEEDED
TO CROSS HIGH WATER CHANNEL.
INSTALL REFLECTIVE MARKER,
PERMANENT BARRIER
INSTALL REFLECTIVE MARKER,
PERMANENT BARRIER
RIPRAP, HEAVY 176 SYD, SCOUR
PROTECTION, SEE DETAIL ON S-201
FOR INFORMATIONAL PURPOSES ONLY
00401300150
GREGORY MAULE
PROPOSED ELEVATION PLAN OF SITE1
SCOUR REPAIRS,
SEE DETAIL 2/S-501
SCOUR PROTECTION
FOOTING DIMENSIONS ARE
ASSUMED AND SHOWN FOR
INFORMATIONAL PURPOSES ONLY
14.4'
9.7'
12.7'
12.7'
ALTERNATE 1:
SCOUR PROTECTION
AT CENTER OF PIER.
RIPRAP, PLAIN
FILTER AGGREGATE
INSTALL TOE ALONG RIVER SIDE
RIPRAP, HEAVY
INSTALL FLOWABLE FILL IN SCOUR HOLE. INSTALL FORMS
TO ALLOW FOR INSTALLATION AND CONTAINMENT OF
FLOWABLE FILL. REMOVE FORMS AFTER FLOWABLE FILL
HAS HARDENED (MINIMUM 7 DAYS)
PROPOSED PLAN OF SITE2
NOTE:
RIPRAP AT CENTER PIER SHALL NOT BE INSTALLED UNTIL AFTER
THE SCOUR REPAIRS HAVE BEEN PERFORMED. LOADS CROSSING
THE BRIDGE SHALL NOT EXCEED A MICHIGAN NO. 2 TRUCK.
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EX PILES
AutoCAD SHX Text
EXISTING METAL POST
AutoCAD SHX Text
OHWM 845.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text DTMB No.
AutoCAD SHX Text
OHM PROJ.
AutoCAD SHX Text IDENTIFICATION No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET
AutoCAD SHX Text C-102
AutoCAD SHX Text 7136-20-0100
AutoCAD SHX Text
751/20159.JBB
AutoCAD SHX Text 09/30/2022
AutoCAD SHX Text
AutoCAD SHX Text
AR
AutoCAD SHX Text
MH
AutoCAD SHX Text
STURGEON RIVER BRIDGE REHAB
AutoCAD SHX Text
PROPOSED PLAN OF SITE
AutoCAD SHX Text
MM
AutoCAD SHX Text
ZH
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
SURFACE OF WATER 05/27/21 844.85'
1" = 10'
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N
S U
L
A M
A
M
O E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ stu rg eo n_ riv er _b rid ge
_re ha b\D ra wi ng s\C ivi l\P lan s_ Co ns t\2
0C
ON
.dw g
S ep
, 2
2 -
2:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
SILT FENCE DETAIL1STANDARD WOODEN APPROACH RAILING/FENCE2
TYPICAL TRAIL SECTION3
AutoCAD SHX Text NOTES: : 1) ALL WOOD SHALL BE TREATED NO. 2 DOUGLASS FIR. PROVIDE 12'-0" RAIL LENGTHS AND STAGGER RAIL SPLICES 2) USE 3" COATED DECK SCREWS (TORQ HEAD) AT POSTS. COATED DECK SCREWS (TORQ HEAD) AT POSTS. . 3) RAIL BOARD SPLICES SHALL BE CENTERED ON POST.
AutoCAD SHX Text
%%USECTION VIEW
AutoCAD SHX Text
%%UFRONT VIEW
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x8 TOP RAIL
AutoCAD SHX Text
18" SOLID WALL HDPE PIPE FILLED WITH PEA GRAVEL (6A)
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text 2x8 TOP RAIL
AutoCAD SHX Text 6x6 POST
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
SAND OR CHAMFER EDGES OF HAND RAIL
AutoCAD SHX Text
(3) #12X3" COATED DECK SCREWS (TORQ HEAD) AT POSTS
AutoCAD SHX Text OBJECT MARKER SIGN 6"x24" (OM-3L OR OM-3R)
AutoCAD SHX Text
#8X3" COATED DECK SCREWS (TORQ HEAD) @24" O.C.
AutoCAD SHX Text SPLICE AT OF POST (TYP). ALTERNATE RAIL SPLICES AT EACH POST. SEE RAILING FASTENER DETAIL.
AutoCAD SHX Text EDGE OF OBJECT MARKER SHALL ALIGN WITH INNER EDGE OF RAILING. INSTALLED AT START OF RAILING AND BRIDGE.
AutoCAD SHX Text 2x6 TOP RAIL SUPPORT
AutoCAD SHX Text 2x6 TOP RAIL SUPPORT
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text 2x6 RAIL
AutoCAD SHX Text
PREDRILL ALL SCREW HOLES 1/16" LESS THAN DIAMETER OF SCREW
AutoCAD SHX Text 6'
AutoCAD SHX Text 6'
AutoCAD SHX Text 2%%%
AutoCAD SHX Text 2%%%
AutoCAD SHX Text
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text DTMB No.
AutoCAD SHX Text
OHM PROJ.
AutoCAD SHX Text IDENTIFICATION No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET
AutoCAD SHX Text C-202
AutoCAD SHX Text 7136-20-0100
AutoCAD SHX Text
751/20159.JBB
AutoCAD SHX Text 09/30/2022
AutoCAD SHX Text
AutoCAD SHX Text
AR
AutoCAD SHX Text
MH
AutoCAD SHX Text
STURGEON RIVER BRIDGE REHAB
AutoCAD SHX Text
GENERAL DETAILS
AutoCAD SHX Text
MM
AutoCAD SHX Text
ZH
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FENCE POST
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
FILTER FABRIC
AutoCAD SHX Text
COMPACTED
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
SILT FENCE JOINT
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
SUPPORT FENCE
AutoCAD SHX Text
UNDISTURBED
AutoCAD SHX Text
VEGETATION
AutoCAD SHX Text
FENCE POST DRIVEN
AutoCAD SHX Text
1'INTO GROUND
AutoCAD SHX Text
1'MIN
AutoCAD SHX Text
SUPPORT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
SPACING 6' MAX.
AutoCAD SHX Text
6"ANCHOR TRENCH
AutoCAD SHX Text
GEOTEXTITLE FILTER
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
GEOTEXTILE FILTER
AutoCAD SHX Text
FABRIC FASTENED TO
AutoCAD SHX Text
UPHILL SIDE TOWARDS
AutoCAD SHX Text
EARTH DISRUPTION
AutoCAD SHX Text
RIDGE OF COMPACTED
AutoCAD SHX Text
EARTH ON FILTER FABRIC
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
1'MIN
AutoCAD SHX Text
UNDISRUPTED
AutoCAD SHX Text
VEGETATION
AutoCAD SHX Text
SILT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text A
AutoCAD SHX Text
SILT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text B
AutoCAD SHX Text
SILT FENCE JOINT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
FRONT VIEW
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
TO BE
AutoCAD SHX Text
WRAPPED
AutoCAD SHX Text
AROUND
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
POST
AutoCAD SHX Text
COUPLER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
WOOD FENCE (TYP) SEE DETAIL 1
AutoCAD SHX Text
SLOPE RESTORATION
AutoCAD SHX Text
APPROXIMATE EXISTING SIDE SLOPE
AutoCAD SHX Text
EXISTING TRAIL SURFACE
AGGREGATE SURFACE CASE, 6" 23A MATERIAL COMPACTED TO 95% MAX DENSITY
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N
S U
L
A M
A
M
O E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ stu rg eo n_ riv er _b rid ge
_re ha b\D ra wi ng s\C ivi l\P lan s_ Co ns t\2
0C
ON
str uc t_P ha se I.d wg
S ep
, 2
2 -
2:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
EXISTING PLAN OF STRUCTURE2
EXISTING ELEVATION1
151.0'
RAILING, REM
151.0'
75.7' 75.3'
REF. PT. A
STA 10+62
EXPANSION JOINT
REF. PT. B
STA 11+37
REF. PT. C
STA 12+13
REMOVE RAILING 302 LF
S-501
S-501
REMOVE AND SALVAGE EXISTING
WEARING SURFACE AS NEEDED FOR
DECK BOARD REMOVAL, 202 SYD
TRIM DECK BOARDS AT RAILING POSTS TO
EXISTING DECK WIDTH 26 EA
REMOVE DECK BOARDS
5' O.C. 31 EA
SCOUR HOLE 2FT DEEP,
6FT WIDE, 15FT LONG
DREDGE/EXCAVATE
FOR TOE OF SCOUR
PROTECTION
TURBIDITY CURTAIN
FOR INFORMATIONAL PURPOSES ONLY
00401300120
TODD JOHNSON
00401300150
GREGORY MAULE
00401300130
JOHN E & BARBARA J GELINE
00401300150
GREGORY MAULE
AutoCAD SHX Text
T/BANK
AutoCAD SHX Text
DITCH
AutoCAD SHX Text
T/BANK
AutoCAD SHX Text
PIER
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
STURGEON RIVER
AutoCAD SHX Text
STURGEON RIVER
AutoCAD SHX Text
EX PILES
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
EXISTING RIPRAP
AutoCAD SHX Text
EXISTING METAL POST
AutoCAD SHX Text
EXISTING RIPRAP
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
ROW
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EDGE OF WATER 5/27/2021
AutoCAD SHX Text
EX PILES
AutoCAD SHX Text
EXISTING METAL POST
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text DTMB No.
AutoCAD SHX Text
OHM PROJ.
AutoCAD SHX Text IDENTIFICATION No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET
AutoCAD SHX Text S-101
AutoCAD SHX Text 7136-20-0100
AutoCAD SHX Text
751/20159.JBB
AutoCAD SHX Text 09/30/2022
AutoCAD SHX Text
AutoCAD SHX Text
AR
AutoCAD SHX Text
MH
AutoCAD SHX Text
STURGEON RIVER BRIDGE REHAB
AutoCAD SHX Text
PLAN OF STRUCTURE
AutoCAD SHX Text
MM
AutoCAD SHX Text
ZH
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
EXISTING GRADE
SURFACE OF WATER 05/27/21 844.85'
| Sheets and Views |
| DT COVER |
| C-001 NOTES |
| C-101 PLAN OF SITE |
| C-102 PROPOSED PLAN OF SITE |
| C-202 GENERAL DETAILS |
| S-101 PLAN OF STRUCTURE |
| S-201 PROPOSED PLAN OF STRUCTURE |
| S-401 ALTERNATE 2 - DELAMINATION ELEVATIONS |
| S-501 STRUCTURAL CROSS SECTIONS |
| S-502 STRUCTURAL DETAILS |