751_20090_GAG DMB-406 Pre-Bid Addendum_01.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ - 171 - 230000000366
- Issued by
- Mecosta County, Montcalm County, Michigan
About this file
This document is a Pre-Bid Addendum issued by the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Natural Resources (DNR) for the Fred Meijer White Pine Trail Phase 2 - Howard City to Big Rapids project. The addendum revises the bid documents, including updates to the Pre-Bid Meeting Attendance Record, Acceptance of Hot Mix Asphalt Mixture Special Provision, Schedule of Change Order Prices, AT&T fiber optic preservation instructions, revised trail typical sections, updated trail signage notes, a new Washington Road Crossing Detail, and clarifications on asphalt requirements. The bid opening date is April 19, 2023, and the project is located in Mecosta and Montcalm Counties in Michigan.
The addendum provides details on the required sampling and testing procedures for the hot mix asphalt, including uniformity tolerance limits, density requirements, and potential price adjustments for out-of-specification materials. It also outlines the process for dispute resolution testing and the calculation of total price adjustments. No additional information is provided regarding pricing terms, set asides, incumbents, funding sources, or amounts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 0/17)
STATE OF MICHIGAN Date Issued: April 14, 2023 Department of Technology, Management and Budget Index No(s): None State Facilities Administration File No: 751/20090.GAG 3111 W. St Joseph St. Lansing, MI 48917 Department: Natural Resources P.O. Box 30026 Project Name: Fred Meijer White Pine Trail
Phase 2 – Howard City to Big Rapids Lansing, Michigan 48909 Subject: Revision to Bid Documents Bid Opening Date: April 19, 2023
PRE-BID ADDENDUM NO. 01
TO: All Bidders
SUBJECT: Revision to Bid Documents
INTENT: This Addendum is issued to incorporate the items provided below into the Bidding/Construction Contract Documents dated March 24, 2023, for the Project named above.
Item 1 – Pre-Bid meeting attendance record is attached.
Item 2 – Re-issued Acceptance of Hot Mix Asphalt Mixture on MDNR Projects Special Provision.
o Revised the required minimum in-place density of HMA mixtures to be 93.0 percent of the density control target.
Item 3 – Article 7 – Schedule of Change Order Prices – Geotextile Stabilization.
o Revise Item 2, Geotextile, Stabilization in Article 7 – Schedule of Change Order Prices to be
“Geotextile, Stabilization, Non-Woven.” Geotextile, Stabilization, Non-Woven shall be in accordance with Sections 308 and 910 of the MDOT 2020 Standard Specifications for Construction.
o The Geotextile Stabilization will be used as needed and as directed by the Engineer under the proposed Shared Use Path, Aggregate in areas with soft or wet subgrade.
Item 4 – AT&T Fiber Optic Preservation quote.
o AT&T quote is attached with instructions from AT&T for payment. Coordinate with the Special
Provision for Fiber Optic Preservation at Cold Water Creek Culvert. Obtain an updated quote as necessary for accurate bidding.
Item 5 – Updated informational quantities.
o Re-issued Sheet 2, Note Sheet with updated quantities. Note that all quantities shown are for information only and do not necessarily include all items of work required to construct this project.
Item 6 – Revised trail typical sections.
o Re-issued Sheets 5 & 6, Typicals. For “Proposed Typical” (Sheet 5) and “Proposed Typical – Grade
Raise” (Sheet 6) typical sections, the proposed Shared Use Path, Aggregate width has been reduced from 14’ to 12’.
Item 7 – Revised Trail Signage Notes.
o Re-issued Sheet 9, Misc Details.
o Updated signage note #1 to reference advance warning sign index table.
o Updated/renamed “W11-15a/W16-9P Advance Warning Sign Location Index” table. The locations in this table apply only to the advance warning roadway signs. The trail crossing signs located immediately adjacent to the trail shall be installed in both directions at all crossings.
o Updated signage note #3 to include three missing road names.
Item 8 – Washington Road Crossing Detail.
o Issued Sheet 23-1, Detail – Washington Rd (new sheet). In addition to the standard gravel road crossing detail paving limits, Washington Rd will be paved east up to Northland Dr.
Item 9 – Clarifications.
o HMA Aggregate Wear Index (AWI) – there is no AWI requirement for the Shared Use Path, HMA leveling course. Per the Special Provision for Shared Use Path, Hot Mix Asphalt Snowmobile Wearing Course, Special, the Snowmobile Wearing Course shall have an AWI of 333.
o Non Selective Weed Spray (Pramitol 25E) shall be applied on proposed aggregate base immediately prior to placement of HMA, according to manufacturer guidelines.
Here ends Pre-Bid Addendum No. 01.
ACKNOWLEDGEMENT: One copy of this Addendum, properly signed in the space provided below, must be acknowledged and returned for submission of a valid bid. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
OHM Advisors Firm Name
Bidder’s Signature and Title Date
Sincerely, Gerald Gregorski, Project Director DTMB - State Facilities Administration Design and Construction Division
DTMB-0441 (R 19.02)
MEETING ATTENDANCE RECORD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
PROJECT DESCRIPTION/LOCATION
Fred Meijer White Pine Trail Phase 2 – Howard City to Big Rapids
DATE
04-05-2023
TIME
11:00 am
FILE NUMBER
751/20090.GAG
CONTRACT NUMBER MEETING PLACE
Microsoft Teams
PLEASE PRINT YOUR NAME FIRM YOU REPRESENT EMAIL ADDRESS TELEPHONE NUMBER
Chris Powell OHM Advisors Chris.powell@ohm-advisors.com 231-344-1155 Amanda Porath OHM Advisors Amanda.porath@ohm-advisors.com 231-344-1153 Scott Fisher OHM Advisors Scott.fisher@ohm-advisors.com 231-344-1168 Jerry Gregorski DTMB gregorskig@michigan.gov 231-557-9043 Steve Krzesicki DNR krzesickis@michigan.gov 517-285-8231 Ben Dietrich DNR Dietrichb3@michigan.gov Scott Slavin DNR slavins@michigan.gov 231-878-9403 Alec Sherwood AnLaan Corporation alecsherwood@anlaan.com 231-578-1076 Tom Peplinski DJ McQuestion tompep@djmcquestion.com Ben Shepard Dean’s Excavating nate@deansexcavating.com 616-636-5524 Jennifer Miller Blue Restoration, LLC bluerestorationllc@yahoo.com 989-615-4682 Jourdan Lindsey Tamarack Builders jlindsey@tamarackbuilders.com 989-620-4737 Seth VanderKooi Michigan Paving and Materials Co. Seth.vanderkooi@mipmc.com 616-570-4059 Tom Canfield J&N Construction tcanfield@jandnllc.com 231-388-2021 Rod McKenzie Rieth-Riley Construction Co. rmckenzie@rieth-riley.com 231-250-1040 Chad Waldo Rieth-Riley Construction Co. cwaldo@rieth-riley.com 616-262-0010 Kody Park Rieth-Riley Construction Co. kpark@rieth-riley.com 231-629-5703 Andy Lockhart Rieth-Riley Construction Co. alockhart@rieth-riley.com 231-388-0355 Brian Cataldo Greenscape General Contracting brian@greenscapegc.com 989-544-2489
SPECIAL PROVISION
FOR
ACCEPTANCE OF HOT MIX ASPHALT MIXTURE ON MDNR PROJECTS
MDNR:OHM:CRP 1 of 5 03/2023
a. Description. This special provision provides sampling and testing requirements for MDNR projects using the nuclear density gauge testing method. Provide the hot mix asphalt (HMA) mixture in accordance with the requirements of the standard specifications, except where modified herein.
b. Materials. Provide aggregates, mineral filler (if required), and asphalt binder to produce a mixture proportioned within the master gradation limits shown in the contract, and meeting the uniformity tolerance limits in Table 1.
Table 1: Uniformity Tolerance Limits for HMA Mixtures Parameter Top and Leveling Course Base Course
Number Description Range 1 (a) Range 2 Range 1 (a) Range 2 1 % Binder Content -0.30 to +0.40 ±0.50 -0.30 to +0.40 ±0.50
# 8 and Larger Sieves ±5.0 ±8.0 ±7.0 ±9.0 # 30 Sieve ±4.0 ±6.0 ±6.0 ±9.0 2 # 200 Sieve ±1.0 ±2.0 ±2.0 ±3.0
3 Crushed Particle Content (b) Below 10% Below 15% Below 10% Below 15%
a. This range allows for normal mixture and testing variations. The mixture must be proportioned to test as closely as possible to the Job-Mix-Formula (JMF).
b. Deviation from JMF.
Parameter number 2 as shown in Table 1 is aggregate gradation. Each sieve will be evaluated on one of the three gradation tolerance categories. If more than one sieve is exceeding Range 1 or Range 2 tolerances, only the one with the largest exceedance will be counted as the gradation parameter.
The master gradation should be maintained throughout production; however, price adjustments will be based on Table 1. Aggregates which are to be used in plant-mixed HMA mixtures must not contain topsoil, clay, or loam.
c. Construction. Submit a Mix Design and a JMF to the Engineer. Do not begin production and placement of the HMA until receipt of the Engineer’s approval of the JMF. Maintain the binder content, aggregate gradation, and the crushed particle content of the HMA mixture within the Range 1 uniformity tolerance limits in Table 1. For mixtures meeting the definition of top or leveling course, field regress air void content to 3.5 percent with liquid asphalt cement unless specified otherwise on HMA application estimate. For mixtures meeting the definition of base course, field regress air void content to 3.0 percent with liquid asphalt cement unless specified otherwise on HMA application estimate.
P a ss in g
MDNR:OHM:CRP 2 of 5 03/2023
Ensure all persons performing Quality Control (QC) and Quality Assurance (QA) HMA field sampling are “Local Agency HMA Sampling Qualified” samplers. At the pre-production or preconstruction meeting, the Engineer will determine the method of sampling to be used. Ensure all sampling is done in accordance with MTM 313 (Sampling HMA Paving Mixtures) or MTM 324 (Sampling HMA Paving Mixtures Behind the Paver). Samples are to be taken from separate hauling loads.
For production/mainline type paving, obtain a minimum of two samples, each being 20,000 grams, each day of production, for each mix type. The Engineer will sample and maintain possession of the sample. Sampling from the paver hopper is prohibited. Each sample will be divided into two 10,000 gram parts with one part being for initial testing and the other part being held for possible dispute resolution testing. Obtain a minimum of three samples for each mix type regardless of the number of days of production.
Obtain samples that are representative of the day’s paving. Sample collection is to be spaced throughout the planned tonnage. One sample will be obtained in the first half of the tonnage and the second sample will be obtained in the second half of the tonnage. If planned paving is reduced or suspended, when paving resumes, the remaining sampling must be representative of the original intended sampling timing.
Ensure all persons performing testing are Bit Level One certified or Bit QA/QC Technician certified.
Ensure daily test samples are obtained, except, if the first test results show that the HMA mixture is in specification, the Engineer has the option of not testing additional samples from that day.
At the pre-production or preconstruction meeting, the Engineer and Contractor will collectively determine the test method for measuring asphalt content (AC) using MTM 319 (Determination of Asphalt Content from Asphalt Paving Mixtures by the Ignition Method) or MTM 325 (Quantitative Extraction of Bitumen from HMA Paving Mixtures). Back calculation will not be allowed for determining asphalt content.
Ensure all labs performing acceptance testing are qualified labs per the HMA Production Manual and the Michigan Quality Assurance Procedures Manual, and participate in the MDOT round robin process, or they must be AASHTO Materials Reference Laboratory (AMRL) accredited for AASHTO T30 or T27, and AASHTO T164 or T308. Ensure on non-National Highway System (NHS) routes, Contractor labs are made available, and may be used, but they must be qualified labs as previously stated. Contractor labs may not be used on NHS routes. Material acceptance testing will be completed by the Engineer within 14 calendar days, except holidays and Sundays, for projects with less than 5,000 tons (plan quantity) of HMA and within 7 calendars days, except holidays and Sundays, for projects with 5,000 tons (plan quantity) or more of HMA, after the Engineer has obtained the samples. QA test results will be provided to the Contractor after the Engineer receives the QC test results. Failure on the part of the Engineer or the laboratory to provide QA test results within the specified time frame does not relieve the Contractor of their responsibility to provide an asphalt mix within specifications.
The correlation procedure for ignition oven will be established as follows. Asphalt binder content based on ignition method from MTM 319. Gradation (ASTM D5444) and Crushed particle content (MTM 117) based on aggregate from MTM 319. The incineration temperature will be established at the pre-production meeting. The Contractor will provide a laboratory mixture sample to the
MDNR:OHM:CRP 3 of 5 03/2023 acceptance laboratory to establish the correction factor for each mix. Ensure this sample is provided to the Engineer a minimum of 14 calendar days prior to production.
For production/mainline type paving, the mixture may be accepted by visual inspection up to a quantity of 500 tons per mixture type, per project (not per day). For non-production type paving defined as driveways, approaches, and patching, visual inspection may be allowed regardless of the tonnage.
The mixture will be considered out-of-specification, as determined by the acceptance tests, if for any one mixture, two consecutive tests per parameter, (for Parameter 2, two consecutive aggregate gradations on one sieve) are outside Range 1 or Range 2 tolerance limits. If a parameter is outside of Range 1 tolerance limits and the second consecutive test shows that the parameter is outside of Range 2, then it will be considered to be a Range 1 out-of-specification.
Consecutive refers to the production order and not necessarily the testing order. The Contractor shall be responsible for corrective action on out-of-specification mixtures, subject to approval by the Owner and/or Engineer, including but not limited to a price adjustment per the Measurement and Payment section of this special provision.
Contractor operations will be suspended when the mixture is determined to be out-of-specification, but contract time will continue to run. The Engineer may issue a Notice of Non-Compliance with Contract Requirements if the Contractor has not suspended operations and taken corrective action. Submit a revised JMF or proposed alterations to the plant and/or materials to achieve the JMF to the Engineer. Effects on the Aggregate Wear Index (AWI) and mix design properties will be taken into consideration. Production and placement cannot resume until receipt of the Engineer’s approval to proceed.
Pavement in-place density tests will be completed by the Engineer during paving operations.
Pavement in-place density acceptance testing will be completed by the Engineer prior to paving of subsequent lifts and being open to traffic.
Pavement in-place density will be measured using the Direct Density Method.
Use of a nuclear density gauge requires measuring the pavement density using the Gmm from the JMF for the density control target. The required in-place density of the HMA mixture must be
93.0 to 98.0 percent of the density control target. Nuclear density testing and frequency will be in accordance with the MDOT Density Testing and Inspection Manual or as determined by the Engineer and Owner.
After placement, roll the HMA mixture as soon after placement as the roller is able to bear without undue displacement or cracking. Start rolling longitudinally at the sides of the lanes and proceed toward the center of the pavement, overlapping on successive trips by at least half the width of the drum. Ensure each required roller is 8 tons minimum in weight unless otherwise approved by the Engineer.
Ensure the initial breakdown roller is capable of vibratory compaction and is a maximum of 500 feet behind the paving operations. The maximum allowable speed of each roller is 3 miles per hour (mph) or 4.5 feet per second. Ensure all compaction rollers complete a minimum of two complete rolling cycles prior to the mat temperature cooling to 180 degrees Fahrenheit (F).
Continue finish rolling until all roller marks are eliminated and no further compaction is possible.
MDNR:OHM:CRP 4 of 5 03/2023
Pavement Surface Quality. If pavement surface quality is deemed unacceptable by the Owner and/or Engineer, the Contractor shall be responsible for corrective action, subject to approval by the Owner and/or Engineer.
d. Measurement and Payment. The completed work, as described, will be measured and paid for as part of the Lump Sum Contract, except as modified below.
Base Price for use in calculating price adjustments will be based on Contractor’s HMA unit price as submitted with the post-bid schedule of values.
If acceptance tests, as described in section c. of this special provision, show that a Table 1 mixture parameter exceeds the Range 1, but not the Range 2, tolerance limits, that mixture parameter will be subject to a 10 percent penalty. The 10 percent penalty will be assessed based on the acceptance tests only unless the Contractor requests that the 10,000 gram sample part retained for possible dispute resolution testing be tested. The Contractor has 4 calendar days from receipt of the acceptance test results to notify the Engineer, in writing, that dispute resolution testing is requested. The Contractors QC test results for the corresponding QA test results must result in an overall payment greater than QA test results otherwise the QA tests will not be allowed to be disputed. The Engineer has 4 calendar days to send the dispute resolution sample to the lab once dispute resolution testing is requested. The dispute resolution sample will be sent to an independent lab selected by the Owner, and the resultant dispute test results will be used to determine the penalty per parameter, if any. Ensure the independent lab is a MDOT QA/QC qualified lab or an AMRL HMA qualified lab. The independent lab must not have conflicts of interest with the Contractor or Owner. If the dispute testing results show that the mixture parameter is out-of-specification, the Contractor will pay for the cost of the dispute resolution testing and the contract base price for the material will be adjusted, based on all test result parameters from the dispute tests, as shown in Table 3 and Table 4. If the dispute test results do not confirm the mixture parameter is out-of-specification, then the Owner will pay for the cost of the dispute resolution testing and no price adjustment is required.
If acceptance tests, as described in section c. of this special provision, show that a Table 1 mixture parameter exceeds the Range 2 tolerance limits, the 10,000 gram sample part retained for possible dispute resolution testing will be sent, within 4 calendar days, to the independent lab for further testing. The independent lab’s test results will be used to determine the penalty per mixture parameter, if any. If the independent lab’s results do not confirm the mixture parameter is out-of-specification, then no price adjustment is required. If the independent lab’s results show that the mixture is out-of-specification and the Engineer approves leaving the out-of-specification mixture in place, the contract base price for the material will be adjusted, based on all parameters, as shown in Table 3 and Table 4.
In the case that the Contractor disputes the results of the test of the second sample obtained for a particular day of production, the test turn-around time frames given would apply to the second test and there would be no time frame on the first test.
The independent lab will complete all Dispute Resolution testing and return test results to the Engineer, who will provide them to the Contractor, within 13 calendar days upon receiving the Dispute Resolution samples.
In all cases, when penalties are assessed, the penalty applies to each parameter, up to two parameters, that is out of specification.
MDNR:OHM:CRP 5 of 5 03/2023
Table 3: Penalty Per Parameter
Mixture Parameter outof-Specification per
Acceptance Tests
Mixture Parameter out-of- Specification per Dispute Resolution
Test Lab Price Adjustment per Parameter
No N/A None No None
Outside Range 1 but not Range 2:
decrease by 10% Yes
Yes Outside Range 2: decrease by 25%
The quantity of material receiving a price adjustment is defined as the material produced from the time the first out-of-specification sample was taken until the time the sample leading to the first in-specification test was taken.
Each parameter of Table 1 is evaluated with the total price adjustment applied to the contract base price based on a sum of the two parameter penalties resulting in the highest total price adjustment as per Table 4. For example, if three parameters are out-of-specification, with two parameters outside Range 1 of Table 1 tolerance limits, but within Range 2 of Table 1 limits and one parameter outside of Range 2 of Table 1 tolerance limits and the Engineer approves leaving the mixture in place, the total price adjustment for that quantity of material is 35 percent.
Table 4: Calculating Total Price Adjustment Cost Adjustment as a Sum of the Two Highest Parameter Penalties
Number of Parameters Out-of- Specification
Range(s) Outside of Tolerance Limits of Table 1 per Parameter Total Price Adjustment
Range 1 10% One
Range 2 25% Range 1 and Range 1 20% Range 1 and Range 2 35% Two Range 2 and Range 2 50%
Range 1, Range 1 and Range 1 20% Range 1, Range 1 and Range 2 35% Range 1, Range 2 and Range 2 50% Three
Range 2, Range 2 and Range 2 50%
Amanda Porath
From: ADAMS, THOMAS R <TA1863@att.com> Sent: Friday, March 31, 2023 12:15 PM To: 'SSLAVINS@MICHIGAN.GOV' Cc: VANTIL, CORY R Subject: 226148 INVOICE.pdf Attachments: 226148 INVOICE.pdf
Hello
Please do not send payment to any other address than what is listed below.
Otherwise, this will significantly delay your project.
Attached is the invoice for the AT&T work to rearrange existing AT&T facilities.
Your down payment is listed as a credit.
Please note paragraph 1, page 1.
Before we can proceed with this project, we require the following:
Pre-payment in full Executed invoice
Cost / invoice is valid for 60 days. After 60 days we will cancel this project and bill for engineering time.
Sorry, we cannot accept payment via Credit Card. We can take an ACH draw from your bank.
Send payment to:
AT&T CWO -2nd Floor 220 Wisconsin Avenue Waukesha, WI 53186
Thank you, Tom Adams Customer Contracts Specialist Customer Work Order Center
AT&T
220 Wisconsin Avenue, Waukesha, WI, 53186 | ta1863@att.com
MOBILIZING YOUR WORLD
This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this e-mail is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited.
DMB-406 (R 0/17)