751_13068.TAP_DB to LL Trail_BidPackage1_TechnicalSpecifications2.pdf

PDF 5 MB Posted

Attached to
751/14068. TAP; Dollar Bay to Lake Linden Trails (Bid Pkg 1)
Solicitation number
RFQ - 171 - 230000000382
Issued by
Houghton County, Dollar Bay CDP, Michigan

About this file

This document is a permit issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) Water Resources Division for the 31-Lake Linden Trail project in Houghton County, Michigan. The permit authorizes the repair and replacement of culverts, naturalization of stream channels, and culvert cleanout along several trail segments in the townships of Osceola, Schoolcraft, and Torch Lake, as well as the Village of Lake Linden. The permit is valid for five years from the date of issuance on November 4, 2022. The permit includes detailed specifications and conditions for the authorized work, including requirements for erosion control, work sequencing, and culvert installation.

The related state and local contract opportunity is for the 751/14068. TAP; Dollar Bay to Lake Linden Trails (Bid Pkg 1) project, which encompasses work in Houghton County, Michigan and the Dollar Bay CDP. The scope of the contract includes the construction activities authorized by the permit. No additional details are provided regarding the specific contract requirements, pricing terms, funding sources, or award information.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This notice must be displayed at the site of work.

Laminating this notice or utilizing sheet protectors is recommended.

Please refer to the above permit number with any questions or concerns.

NOTICE OF AUTHORIZATION

Permit Number: WRP035615 v. 1 Date Issued: November 4, 2022 Site Name: 31-Lake Linden Trail-Osceola, Schoolcraft, Torch Lake Twps

Expiration Date: November 4, 2027

The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended; specifically:

Part 31, Floodplain Regulatory Authority of the Water Resources Protection.

Part 301, Inland Lakes and Streams.

Part 303, Wetlands Protection.

Part 315, Dam Safety.

Part 323, Shorelands Protection and Management.

Part 325, Great Lakes Submerged Lands.

Part 353, Sand Dunes Protection and Management.

Authorized activity:

Repair culverts, replace culverts, naturalize stream channels at trail segments, and clean out culverts at locations listed in the plans of this permit.

Waterbody Affected: Tributaries to Keweenaw Waterway Property Location: Houghton County, Osceola Township, Torch Lake Township, Schoolcraft Township, and Village of Lake Linden

Permittee:

Matt Torreano, MDNR 427 US-41 North Baraga, MI 49908

Hunter King Marquette District Office Water Resources Division 906-235-4537

MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY

WATER RESOURCES DIVISION

PERMIT

Issued To:

Matt Torreano, MDNR 427 US-41 North Baraga, MI 49908

Permit No: WRP035615 v.1 Submission No.: HPJ-7YVE-1ZRRP Site Name: 31-Lake Linden Trail-Osceola, Schoolcraft, Torch Lake Twps Issued: November 4, 2022 Expires: November 4, 2027

This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:

Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)

EGLE certifies that the activities authorized under this permit are in compliance with the State Coastal Zone Management Program and certifies without conditions under the Federal Clean Water Act, Section 401 that the discharge from the activities authorized under this permit will comply with Michigan’s water quality requirements in Part 31, Water Resources Protection, of the NREPA and associated administrative rules, where applicable.

Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:

Authorized Activity:

Repair culverts, replace culverts, naturalize stream channels at trail segments, and clean out culverts at locations listed in the plans of this permit. All work shall be completed in accordance with the attached plans and the terms and conditions of this permit.

Waterbody Affected: Tributaries to Keweenaw Waterway Property Location: Houghton County, Osceola Township, Torch Lake Township, Schoolcraft Township, and Village of Lake Linden Town/Range/Section(s): 55N 32W 06, 55N 33W 01, 55N 33W 12, 55N 33W 13, 55N 33W 14, 55N 33W 23, 55N 33W 26, 55N 33W 27, 55N 33W 28, 55N 33W 33, 56N 32W 29, 56N 32W 30, 56N 32W 31, Matt Torreano, MDNR 2 WRP035615 v.1

Authority granted by this permit is subject to the following limitations:

A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.

B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.

C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.

D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.

E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.

F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with

2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.

G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.

H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.

I. This permit shall not be assigned or transferred without the written approval of EGLE.

J. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.

K. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).

L. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.

M. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.

N. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.

O. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.

Proposed modifications must be approved, in writing, by EGLE prior to being implemented.

P. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.

Q. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit

Matt Torreano, MDNR 3 WRP035615 v.1 are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.

R. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.

S. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).

T. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.

U. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.

V. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.

W. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.

X. Work to be done under authority of this permit is further subject to the following special instructions and specifications:

1. Authority granted by this permit does not waive permit or program requirements under Part 91 of the

NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview and select “Soil Erosion and Sedimentation Control Agencies”.

2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.

3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.

4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.

5. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.

6. During work on the crossing, and until the site is stabilized, the stream shall be passed through a temporary channel. The temporary channel shall be completely stabilized with riprap placed over geotextile filter fabric prior to passing flow and maintained in good working condition until the culvert is installed and stabilized.

OR

7. During work on the culvert, and until the site is stabilized, the stream shall be blocked off with clean stone and/or gravel bags and the water pumped around the crossing. Water shall be discharged into the watercourse with appropriate treatments to remove suspended particles and to dissipate energy.

An extra pump shall be kept on site in the event of failure.

8. The placement of the new culvert and the initial placement of fill in the stream shall be done in the dry or in such a manner that all flow is immediately passed through the culvert. The major placement of fill shall be done in the dry or in still water where erosion and siltation will be minimized. The fill material used in this initial placement shall be washed gravel, coarse aggregate, or rock and shall be placed at both ends of the culvert above normal water level before backfill material is placed.

https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview

Matt Torreano, MDNR 4 WRP035615 v.1

9. The culvert shall be installed to align with the center line of the existing stream at both the inlet and outlet ends, and must be buried below the stream bed to provide a natural channel substrate through the structure as shown on the approved plans.

10. Road fill side slopes shall not be steeper than 1-on-2 (1 vertical to 2 horizontal) except where headwalls of reinforced concrete, mortar masonry, dry masonry, or other acceptable methods are used.

11. Road fill side slopes terminating in the stream and any raw streambanks resulting from the construction shall be stabilized with temporary measures in accordance with appropriate Best Management Practices based on site conditions, and if necessary, may be riprapped extending above the ordinary high water mark, before or upon commencement of the permitted activity. Temporary stabilization measures shall be maintained until permanent measures are in place.

12. All other road fill slopes, ditches, and other raw areas draining directly to the stream may be protected with riprap, sod and/or seed and mulch as may be necessary to provide effective erosion protection.

The placement of riprap shall be limited to the minimum necessary to ensure proper stabilization of the side slopes and fill in the immediate vicinity of the structure.

13. If the project, or any portion of the project, is stopped and lies incomplete for any length of time (other than that encountered in a normal work week) every precaution shall be taken to protect the incomplete work from erosion, including the placement of temporary gravel bag riprap, temporary seed and mulch, or other acceptable temporary protection.

14. No work shall be done in the stream during periods of above-normal flows except as necessary to prevent erosion.

15. The permittee is responsible for acquiring all necessary easements or rights-of-way before commencing any work authorized by this permit. All construction operations relating to or part of this project shall be confined to the existing right-of-way limits or other acquired easements.

16. Historic artifacts could occur on or near this project site and may be impacted by your activities. If during the course of construction artifacts are encountered, immediately contact the Office of the State Archaeologist, at 517-373-6358.

17. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.

Issued By:

Hunter King Marquette District Office

Matt Torreano, MDNR 5 WRP035615 v.1

THIS PERMIT MUST BE SIGNED BY THE PERMITTEE TO BE VALID.

I hereby assure that I have read, am familiar with, and agree to adhere to the terms and conditions of this permit.

Permittee Signature Date cc: Osceola Township Clerk Torch Lake Township Clerk Schoolcraft Township Clerk Village of Lake Linden Clerk Houghton CEA Zane Hyrkas, OHM Advisors Melody Harmon, OHM Advisors

Si te

Ex is tin g

C ul ve rt

Si ze

(f t)

Pr op os ed

Cu lv er t

Si ze

(f t)

Ex is tin g

Cu lv er t

Le ng th (f t)

Pr op os ed

Cu lv er t

Le ng th (F t)

Ex is tin g

Cu lv er t

Co ve r ( ft

Pr op os ed

Cu lv er t

Co ve r ( ft

Pr op os ed

Pi pe

S lo pe

Ty pe o f

R ep ai r

St ru ct ur e Sh ap e

+3

3.

N

A Br id ge

Re pa irs

+2

5.

N A

G en er al

W or k

2+

.1

.7

<1

N A

G en k

Ci rc ul ar

7+

.4

.4

.1

N A

Re m ov e

Cu lv er t a nd

N at ur al iz e

5+

.2

2.

6.

.3

N A

Re m ov e

Cu lv er ur al iz e

9+

.7

7.

7.

2.

Re pa ir W as ho ut Ci rc ul ar

6+

.6

3.

5x

4.

.9 N

A Cu lv er t Re pa irs

9+

.5

4.

5c 4.

N A

Cu lv er t

Re pa irs

6+

.8

0.

.5

6.

Re pa ir W as ho ut Ci rc ul ar

1+

.8

4.

5x 4.

.2 N

A Cu lv er t Re pa irs

8+

.4

4.

0.

.1

N A

N at ur al iz e

W as ho ut

0+

.1

4.

5x 4.

1.

.7

N A

Re m ov e

Cu lv er ur al iz e

Ex is tin g

C ul ve rt

Si ze

(f t)

Pr op os ed

Cu lv er t

Si ze

(f t)

Ex is tin g

Cu lv er t

Le ng th (f t)

Pr op os ed

Cu lv er t

Le ng th (F t)

Ex is tin g

Cu lv er t

Co ve r ( ft

Pr op os ed

Cu lv er t

Co ve r ( ft

Pr op os ed

Pi pe

S

Ty pe o f

R ep ai r

St ru ct ur e Sh ap e

6+

.0

5x ou tle t

4x in le t

N

A G en k

3+

.1

9.

Re pa ir

W as ho ut

Ci rc ul ar

7+

.7

1.

.6 Re pa ir

W as ho ut

Ci rc ul ar

0+

.8

1.

1.

.7

.1

3.

Re pl ac e Cu lv er t Ci rc ul ar

1+

.3

.8

.7

.6

Re pl ac e

Cu lv er t

Ci rc ul ar

9+

.4

.1

9.

N A

Re pl ac e

Cu lv er t

3+

.6

.8

5.

5.

Re pl ac e Cu lv er t Ci rc ul ar

6+

.1

1.

.9

4.

.6

In st al l Cu lv er t Ci rc ul ar

8+

.0

.2

.2 8.

8.

9.

Re pl ac e Cu lv er t

4+

.6

5.

.4

Re pl ac e Cu lv er t Ci rc ul ar

6+

.0

.1

.1

.8

Re pl ac e

Cu lv er t

Ci rc ul ar

3+

.6

.1

N

A Re pa ir

W as ho ut

Ci rc ul ar

5+

.0

1.

Re pl ac e Cu lv er t Ci rc ul ar

7+

.4

1.

1.

.7

.6

.6

Re pl ac e Cu lv er t

4+

.8

.5 N

A G en k

Ex is tin g

C ul ve rt

Si ze

(f t)

Pr op os ed

Cu lv er t

Si ze

(f t)

Ex is tin g

Cu lv er t

Le ng th

(ft

Pr op os ed

Cu lv er t

Le ng th (F t)

Ex is tin g

Cu lv er t

Co ve r ( ft

Pr op os ed

Cu lv er t

Co ve r ( ft

Pr op os ed

Pi pe

S

Ty pe o f

R ep ai r

St ru ct ur e Sh ap e

1+

.4

1.

.1

.7

.5

Re pl ac e Cu lv er t Ci rc ul ar

2+

.1

2.

.4

0.

Re pl ac e Cu lv er t Ci rc ul ar

1+

.2

0.

2.

5.

4.

Re pl ac e

Cu lv er t

Ci rc ul ar

1+

.0

1.

0.

Re pl ac e Cu lv er t Ci rc ul ar

4+

.0

Br id ge

' x

2.

Re pa ir

W as ho ut

Bo x

6+

.0

Br id ge

' x

2.

0.

Re pl ac e

Cu lv er t

Bo x

5+

.0

1.

Re pa ir W as ho ut Ci rc ul ar

0+

.0

0.

2.

Re pa ir W as ho ut Ci rc ul ar

5+

.0

3.

2.

Re pa ir

W as ho ut

Ci rc ul ar

S it e

E xi st in g

C u lv e rt

S iz e ft

P ro p o se d

C u lv e rt

S iz e ft

E xi st in g

C u lv e rt

Le n g th ft

P ro p o se d

C u lv e rt

Le n g th

F t)

E xi st in g

C u lv e rt

C o v e r (f t)

P ro p o se d

C u lv e rt

C o v e r (f t)

P ro p o se d p ip e s lo p e

T y p e o f

R e p a ir S tr u ct u re

S h a p e

.0

.7

.9

.3

R e p la ce

C u lv e rt C ir cu la r

.2

.5

R e p la ce C u lv e rt

C ir cu la r

.2

.8

.1

.9

R e p a ir

W a sh o u t

C ir cu la r

.1

.9

.4

.5

.4

R e p a ir W a sh o u t C ir cu la r

.5

.5 x3 .5

.5 x8 .5

.6

.5

R e p la ce C u lv e rt

B o x

.6

.3

.5

.1

R e p a ir

W a sh o u t

C ir cu la r

.4

.9

.6

.8

R e p la ce C u lv e rt

C ir cu la r

.5

.5

.9

.5

R e p la ce

C u lv e rt C ir cu la r

.4

.2

.4

.7

.5

.4

R e p a ir

W a sh o u t

C ir cu la r

.1

.4

.3

In st a ll C u lv e rt

C ir cu la r

.9

.5

.5

.5

.5

.3

R e p la ce

C u lv e rt C ir cu la r

.2

.6

.2

.2

R e p a ir W a sh o u t C ir cu la r

.3

.5

.8

.5

.5

.5

R e p a ir

W a sh o u t

C ir cu la r

.6

.9

.5

.9

R e p la ce

C u lv e rt C ir cu la r

.3

.3 x5

.7 t o

T /A rc h

.6

.1

C u lv e rt R e p a ir s B o x

.2

.6

.0

R e p a ir

W a sh o u t

C ir cu la r

.1

.4

.5

R e p la ce C u lv e rt

C ir cu la r

.0

-0

.5

.9

R e p la ce C u lv e rt

C ir cu la r

.9

.4

.8

C u lv e rt R e p a ir s

K n o w w h at

's

STATEOFMICHIGAN

ADAMP.LACH,RA,DIRECTOR

DESIGNANDCONSTRUCTIONDIVISION

S F

S

FSFSFSFSFSFSFSF

SFSFSFSFSFSFSF

K n o w w h at

's

STATEOFMICHIGAN

no w w ha t's

STATE OF MICHIGAN

ADAM P. LACH, RA, DIRECTOR

DESIGN AND CONSTRUCTION DIVISION

w w ha t's

STATE OF MICHIGAN

STATEOFMICHIGAN

w w ha t's

STATE OF MICHIGAN

This notice must be displayed at the site of work.

Laminating this notice or utilizing sheet protectors is recommended.

Please refer to the above permit number with any questions or concerns.

NOTICE OF AUTHORIZATION

Permit Number: WRP036430 v. 1 Date Issued: February 1, 2023 Site Name: 31-Lake Linden Trail-Osceola, Schoolcraft, Torch Lake Twps

Expiration Date: February 1, 2028

The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended; specifically:

Part 31, Floodplain Regulatory Authority of the Water Resources Protection.

Part 301, Inland Lakes and Streams.

Part 303, Wetlands Protection.

Part 315, Dam Safety.

Part 323, Shorelands Protection and Management.

Part 325, Great Lakes Submerged Lands.

Part 353, Sand Dunes Protection and Management.

Authorized activity:

Install a 32-foot-long, 3-foot-diameter circular culvert in a tributary to the Keweenaw Waterway at location 680+90.

Install a 40-foot-long, 4-foot-diameter circular culvert in a tributary to the Keweenaw Waterway at location 660+99.

Install a 34-foot-long, 16-foot- by 5-foot-dimension precast concrete box culvert buried in a tributary to the Keweenaw Waterway.

Waterbody Affected: Tributaries to Keweenaw Waterway Property Location: Houghton County, Osceola Township, TRS 55N 33W Sec 12

Permittee:

Matt Torreano 427 US-41 North Baraga, MI 49908

Hunter King Marquette District Office

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY

WATER RESOURCES DIVISION

PERMIT

Issued To:

Matt Torreano 427 US-41 North Baraga, MI 49908

Permit No: WRP036430 v.1 Submission No.: HPP-MMND-BBY1V Site Name: 31-Lake Linden Trail-Osceola, Schoolcraft, Torch Lake Twps Issued: February 1, 2023 Expires: February 1, 2028

This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:

Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)

EGLE certifies that the activities authorized under this permit are in compliance with the State Coastal Zone Management Program and certifies without conditions under the Federal Clean Water Act, Section 401 that the discharge from the activities authorized under this permit will comply with Michigan’s water quality requirements in Part 31, Water Resources Protection, of the NREPA and associated administrative rules, where applicable.

Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:

Authorized Activity:

Install a 32-foot-long, 3-foot-diameter circular culvert in a tributary to the Keweenaw Waterway at location 680+90.

Install a 40-foot-long, 4-foot-diameter circular culvert in a tributary to the Keweenaw Waterway at location 660+99.

Install a 34-foot-long, 16-foot- by 5-foot-dimension precast concrete box culvert buried in a tributary to the Keweenaw Waterway.

All work shall be completed in accordance with the approved plans and specifications of this permit.

Waterbody Affected: Tributaries to Keweenaw Waterway Property Location: Houghton County, Osceola Township, TRS 55N 33W Sec 12

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

EGLE

WRP036430 v1.0

Approved

Matt Torreano 2 WRP036430 v.1

Authority granted by this permit is subject to the following limitations:

A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.

B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.

C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.

D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.

E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.

F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with

2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.

G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.

H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.

I. This permit shall not be assigned or transferred without the written approval of EGLE.

J. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.

K. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).

L. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.

M. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.

N. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.

O. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.

Proposed modifications must be approved, in writing, by EGLE prior to being implemented.

P. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.

Q. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

EGLE

WRP036430 v1.0

Approved

Matt Torreano 3 WRP036430 v.1 are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.

R. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.

S. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).

T. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.

U. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.

V. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.

W. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.

X. Work to be done under authority of this permit is further subject to the following special instructions and specifications:

1. Authority granted by this permit does not waive permit or program requirements under Part 91 of the

NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview and select “Soil Erosion and Sedimentation Control Agencies”.

2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.

3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.

4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.

5. During work on the crossing, and until the site is stabilized, the stream shall be passed through a temporary channel. The temporary channel shall be completely stabilized with riprap placed over geotextile filter fabric prior to passing flow and maintained in good working condition until the culvert is installed and stabilized.

OR

During work on the culvert, and until the site is stabilized, the stream shall be blocked off with clean stone and/or gravel bags and the water pumped around the crossing. Water shall be discharged into the watercourse with appropriate treatments to remove suspended particles and to dissipate energy.

An extra pump shall be kept on site in the event of failure.

6. The placement of the new culvert and the initial placement of fill in the stream shall be done in the dry or in such a manner that all flow is immediately passed through the culvert. The major placement of fill shall be done in the dry or in still water where erosion and siltation will be minimized. The fill material used in this initial placement shall be washed gravel, coarse aggregate, or rock and shall be placed at both ends of the culvert above normal water level before backfill material is placed.

7. The culvert shall be installed to align with the center line of the existing stream at both the inlet and outlet ends, and must be buried below the stream bed to provide a natural channel substrate through the structure as shown on the approved plans.

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

Matt Torreano 4 WRP036430 v.1

8. Road fill side slopes shall not be steeper than 1-on-2 (1 vertical to 2 horizontal) except where headwalls of reinforced concrete, mortar masonry, dry masonry, or other acceptable methods are used.

9. Road fill side slopes terminating in the stream and any raw streambanks resulting from the construction shall be stabilized with temporary measures in accordance with appropriate Best Management Practices based on site conditions, and if necessary, may be riprapped extending above the ordinary high water mark, before or upon commencement of the permitted activity. Temporary stabilization measures shall be maintained until permanent measures are in place.

10. All other road fill slopes, ditches, and other raw areas draining directly to the stream may be protected with riprap, sod and/or seed and mulch as may be necessary to provide effective erosion protection.

The placement of riprap shall be limited to the minimum necessary to ensure proper stabilization of the side slopes and fill in the immediate vicinity of the structure.

11. If the project, or any portion of the project, is stopped and lies incomplete for any length of time (other than that encountered in a normal work week) every precaution shall be taken to protect the incomplete work from erosion, including the placement of temporary gravel bag riprap, temporary seed and mulch, or other acceptable temporary protection.

12. No work shall be done in the stream during periods of above-normal flows except as necessary to prevent erosion.

13. The permittee is responsible for acquiring all necessary easements or rights-of-way before commencing any work authorized by this permit. All construction operations relating to or part of this project shall be confined to the existing right-of-way limits or other acquired easements.

14. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.

15. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.

Issued By:

Hunter King Marquette District Office Water Resources Division 906-235-4537

THIS PERMIT MUST BE SIGNED BY THE PERMITTEE TO BE VALID.

I hereby assure that I have read, am familiar with, and agree to adhere to the terms and conditions of this permit.

Permittee Signature Date cc: Osceola Township Clerk Houghton CEA Zane Hyrkas, OHM Advisors Ericka Malone, OHM Advisors Melody Harmon, OHM Advisors

USACE

EGLE

WRP036430 v1.0

Approved Issued On:02/01/2023

Expires On:02/01/2028

EGLE

WRP036430 v1.0

Approved

Project Manual Cover
DTMB-0415 Advertisement (Rev 10-22)
OHM DCSpec (Rev03-2022)
WRP033564 - Lake Linden Trail wo Site Plans
WRP035615-Lake Linden Trail
Segment 001 of pl1.pdf
excel not pn.pdf
Segment 002 of pl1.pdf
Bidding Documents Divider Sheet-CO
CLOSEOUT REQUIREMENTS
Closeout Procedures
FINAL COMPLETION CHECKLIST
DTMB-0437_Guarantee__Indebtedness_Statement_2019.04.10_652659_7
DTMB-0445_Certificate_of_Substantial_Completion_2019.04.10_652665_7
DATE OF SUBSTANTIAL COMPLETION:__ ______________________
Bidding Documents Divider Sheet-TS
TECHNICAL SPECIFICATIONS
Table of Contents Generated by MasterWorks
SUBMITTAL RECORD
012200 FL - Unit Prices
033000 FL - Cast-In-Place Concrete
311000 FL - Site Clearing
312000 FL - Earth Moving
312500 - EROSION and SEDIMENTATION CONTROLS_11-2017 OHM
329200 FL - Turf and Grasses
334100 FL - Storm Utility Drainage Piping

File details come from the government source that posted it. Updated .