738614-event.pdf
PDF 215 KB Posted
- Attached to
- DFCM Construction-Standard Low Bid-Big Water Fish Hatchery Stream Bank Erosion Repairs-19338520
- Solicitation number
- JJ19034
- Issued by
- Millard County, Utah
About this file
This is an Invitation for Bid (IFB) issued by the Utah Division of Facilities Construction and Management (DFCM) for Big Water Fish Hatchery Stream Bank Erosion Repairs, located in Big Water, Utah, for the Department of Natural Resources (DNR) Division of Wildlife Resources. The project, identified as DFCM Project No. 19338520, involves stream bank erosion repairs with a construction estimate of $1,900,000.00. A mandatory pre-submittal meeting was held on March 27, 2019, and bids were due on April 4, 2019. The solicitation includes a base bid and three alternate bid items: Buck Tank Wash Armoring and Additional Channel Excavation, and two Additional Bank Stabilization Repair options.
The bid requires contractors to submit a subcontractors list, provide a bid bond, complete a bid schedule with unit and lump sum pricing, and meet specific prerequisites including having a valid contractor's license. The service line items are to be bid as lump sum quantities, with bidders required to enter total prices for the base bid and three alternates. The project involves environmental management and nonresidential construction services, with commodity codes covering facilities construction, building construction, and environmental management services. Interested bidders were directed to obtain contract documents from the DFCM web page and contact Rob Robinson for any project-related questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DFCM web page.html | HTML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Construction-Standard Low Bid-Big Water Fish Hatchery Stream Bank Erosion Repairs-19338520
BIG WATER FISH HATCHERY STREAM BANK EROSION REPAIRS DNR – DIVISION OF WILDLIFE
RESOURCES – BIBIG WATER, UT DFCM Project No. 19338520
Open 3/20/2019 3:00 PM MDT Type Invitation for Bid Close 4/4/2019 3:00 PM MDT Number JJ19034 Currency US Dollar
Sealed Until 4/4/2019 3:00 PM MDT
Contacts Rob Robinson rdrobinson@utah.gov
Commodity Codes Commodity Code Description 99901 DFCM Division Facilities and Construction and Managment
72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services
77100 Environmental management including natural resources management and conservation strategy planning services and environmental testing and lab services including air quality
27 May 202027 May 2020 mailto:rdrobinson@utah.gov mailto:rdrobinson@utah.gov
Sealed bids will be received by the Division of Facilities Construction and Management (DFCM) for:
BIG WATER FISH HATCHERY STREAM BANK EROSION REPAIRS
DNR – DIVISION OF WILDLIFE RESOURCES – BIG WATER, UT
DFCM Project No. 19338520
Bids will be in accordance with the Contract Documents that will be available at 3:00 PM on Wednesday, March 20, 2019 on the DFCM web page at https://dfcm.utah.gov. For questions regarding this project, please contact Rob Robinson, DFCM, at 801-706-5966 or rdrobinson@utah.gov. No others are to be contacted regarding this project.
A MANDATORY pre-submittal meeting to discuss the multi-step bidding process will be held at 1:00 PM on Wednesday, March 27th, 2019 at Wahweap Big Water Fish Hatchery Road, Big Water, Utah 84741. All bidders wishing to bid on this project must attend this pre-bid meeting.
Construction estimate for this project is $1,900,000.00
Description https://dfcm.utah.gov/
Required to View Event
Prerequisites Required to Enter Bid
1. Subcontractor's List Due
2. Liquidated Damages
3. Completion Date
4. Mandatory Pre-bid Meeting
5. Pricing
6. Bid Bond
7. Complete the attached bid schedule form with unit and lump sum pricing as requested for each alternate.
27 May 202027 May 2020
Buyer Attachments
1. Instructions & Subcontractors List Form
2. Solicitation-19338520
3. Approved Drawings-19338520
4. Approved Specs-19338520
5. Pre-Bid Site Meeting Attendance Log
6. DFCM Addendum No. 1 - 19338520
7. Bid Schedule
8. DFCM Addendum No. 2
9. DFCM Addendum No. 3
0. Revised Project Schedule Per Addendum No. 3
27 May 202027 May 2020 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-635438782Subcontractor%20List%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=4rAxLG2TGRqzNQdYl7KNF3EWtDU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-635438782Subcontractor%20List%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=4rAxLG2TGRqzNQdYl7KNF3EWtDU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-777122670Solicitation-19338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=259%2BwMdC%2BkP42qXxb84SY5%2Bl880%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-777122670Solicitation-19338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=259%2BwMdC%2BkP42qXxb84SY5%2Bl880%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-77712350719338520-BIG-WATER-HATCHERY-STREAMBANK-EROSION-REPAIRS-Stamped-Drawings.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=%2B6ru%2BOOAfKT3n8OG%2BbAN6%2BQReM4%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-77712350719338520-BIG-WATER-HATCHERY-STREAMBANK-EROSION-REPAIRS-Stamped-Drawings.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=%2B6ru%2BOOAfKT3n8OG%2BbAN6%2BQReM4%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-77712343919338520-BIG-WATER-HATCHERY-STREAMBANK-EROSION-REPAIRS-Stamped-Specs.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=6VBourgcuoDIVjgDCBDoAqT6H18%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-77712343919338520-BIG-WATER-HATCHERY-STREAMBANK-EROSION-REPAIRS-Stamped-Specs.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=6VBourgcuoDIVjgDCBDoAqT6H18%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-781517152Attendance%20log.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=wHGcReqNdGaZu%2BJEtMQ6KHvORAM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-781517152Attendance%20log.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=wHGcReqNdGaZu%2BJEtMQ6KHvORAM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-782232221Addendum%20No.%201%20-%2019338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=iq0xmEAWL%2B0aQRmaXXoprGnjTnc%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-782232221Addendum%20No.%201%20-%2019338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=iq0xmEAWL%2B0aQRmaXXoprGnjTnc%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783844024Base%20Bid%20%26%20Add%20Alts%20Bid%20Schedule.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=oAFhUAJX%2Fsk7jsKaSN3qE%2BV8nWE%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783844024Base%20Bid%20%26%20Add%20Alts%20Bid%20Schedule.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=oAFhUAJX%2Fsk7jsKaSN3qE%2BV8nWE%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783850500Addendum%20No.%202%20-%2019338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=W%2Fedt0kXHyPnp%2BblLrD4betpygk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783850500Addendum%20No.%202%20-%2019338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=W%2Fedt0kXHyPnp%2BblLrD4betpygk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783866821Addendum%20No.%203%20-%2019338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=z%2BDzDJpcVmjGdWXU0jXzrwMvSHY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783866821Addendum%20No.%203%20-%2019338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=z%2BDzDJpcVmjGdWXU0jXzrwMvSHY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783867916Revised%20Project%20Schedule-19338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=cKPDiT2eAx%2BB1P%2B7oB23ivn%2F5c8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/738614-783867916Revised%20Project%20Schedule-19338520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1653675136&Signature=cKPDiT2eAx%2BB1P%2B7oB23ivn%2F5c8%3D
Questions Required Questions
Group 1:
1.1 # of DFCM Addendums
1.2 Business Organization Type
1.3 Contractor's License #
1.4 Firms legal name and address
1.5 Contractor Point of Contact-name, phone number and email.
Product Line Items Product Line Items
There are no Items added to this event.
Service Line Items Service Line Items
1.
# Item Name, Commodity Code, Description Allow
Alternates Qty. UOM Requested Service Delivery
S1 Base Bid 1 LS - Lump Sum
S2 Add Alt #1 1 LS - Lump Sum
Buck Tank Wash Armoring and Additional Channel Excavation*ENTER TOTAL ADD ALT #1 PRICE for this item.
Unit pricing is to be entered on the bid schedule you will upload.
S3 Add Alt #2 1 LS - Lump Sum
Additional Bank Stabilization Repair *ENTER TOTAL ADD ALT #2 PRICE for this item. Unit pricing is to be entered on the bid schedule you will upload.
S4 Add Alt #3 1 LS - Lump Sum
Additional Bank Stabilization Repair *ENTER TOTAL ADD ALT #3 PRICE for this item. Unit pricing is to be entered on the bid schedule you will upload.
File details come from the government source that posted it. Updated .