7333917 AMENDMENT 0002.pdf

PDF 325 KB Posted

Attached to
N400857333917 Replace Vehicle Arrest System at 3 Gates
Solicitation number
7333917
Issued by

About this file

This document is a federal contract amendment (Amendment 0002) for a project to Replace Vehicle Arrest System for 3 Gates at MCAS Cherry Point, NC, issued by NAVFAC (Naval Facilities Engineering Command). The amendment addresses a Request for Information (RFI) regarding hybrid beacon requirements, clarifying that the hybrid beacon requirement has been removed and Drawing 12908492 has been revised accordingly.

The solicitation's key details include Project Number 733917, with the proposal receipt date changed to 4 September 2025 no later than 12:00 pm (EDT). Contractors must acknowledge the amendment with their proposal submission, and failure to do so may result in proposal rejection. The amendment maintains all other terms and conditions of the original solicitation unchanged.

View the file

Other files

File Type Posted
12908492 Rev 2.pdf PDF
12908505 Rev 1.pdf PDF
34 75 13.13.pdf PDF
01 30 00.pdf PDF
7333917 AMENDMENT 0001.pdf PDF
12908492 Rev 1.pdf PDF
12908504 Rev 1.pdf PDF
12908506 Rev 1.pdf PDF
7333917 Drawings.pdf PDF
7333917 Specs.pdf PDF
7333917 RFP.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC

SPECIFICATION

7 33917 eplace Vehicle Arrest System for 3 Gates

MCAS Cherry Point, NC AMENDMENT

IMPORTANT

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.

If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

2 28/ 33917

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION 333917

Vehicle Arrest System for 3 Gates

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

333917 Replace Vehicle Arrest System for 3 Gates, MCAS

A. The purpose of this amendment is to respond to the following RFI:

1. If this is hybrid beacon, are we to upgrade all signs and signals to include mast arms, HAWK style signals, and black out signs?

Response: No, a hybrid beacon requirement has been removed. Drawing 12908492 has been revised to reflect this change.

B. All other terms and conditions remain unchanged.

is changed to 4

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

16C. DATE SIGNED

File details come from the government source that posted it. Updated .