72805 - PD.docx
DOCX document 42 KB Posted
- Attached to
- KC-46 Bottle Filling Station Federal contract opportunity
- Solicitation number
- FA8571-23-Q-0069
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| SourceofRepairInstructions-VERSION2.1.pdf | ||
| WarrantyInformation-VERSION2.6.pdf | ||
| 72805 - CDRL A003 - Accident Incident Report.pdf | ||
| 72805 - CDRL A002 - Contractors Safety Plan.pdf | ||
| 72805 - CDRL A001 - ASME DOT Cert.pdf | ||
| 72805 - App C.docx | DOCX document | |
| 72805 - Atch 1 Shop Layout.pptx | PPTX presentation | |
| Solicitation - FA857123Q0069.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
KC-46 Bottle Filling Station
21 Feb 2023
1. DESCRIPTION. The Contractor shall provide all tools, parts, materials, supplies, equipment, rigging, labor, transportation and supervision necessary to supply, ship, unload, and install one (1) KC-46 Bottle Filling Station for the 402d Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georiga.
1.1 The KC-46 Bottle Filling Station shall include:
| Item |
| Description |
| Quantity |
| 1 |
| Raft Cylinder Filling Unit |
| 1 Each |
| 2 |
| 450L Taylor Wharton Co2 Microbulk Tank |
| 1 Each |
| 3 |
| Remote Co2 Fill box in SS Cabinet to fill MB |
| 1 Each |
| 4 |
| Pureair o2 Monitor |
| 1 Each |
1.2 The KC-46 Bottle Filling Station is used to fill KC-46 High Pressure Composite Life Raft Cylinders.
1.3 Specific Requirements:
· Fill Box mounted outside of building
· Automatic Filling Unit –Capability of securing all bottle sizes, hook-up to bottle, selection of recipe on digital interface and fill bottle to the desired weight and pressure
· Installation including all plumbing between fill box, MicroBulk Tank, Automatic Filling Unit, and Nitrogen Generator.
· MicroBulk Co2 Tank bolted to ground
1.4 Preventative Maintenance.
1.4.1 Maintenance Support Group (MXSG) will perform all preventative/corrective maintenance.
2. Service Support. (for Incidental Services where Contractor comes on base):
2.1 Government Representatives.
| Primary Government Representative |
| Alternate Government Representative |
Heath Henry
402 CMXG/MXDEP
420 Peacekeeper Way Building 364 Robins AFB, GA 31098 DoDAAC: F3QCCM
(478) 222-4068 heath.henry.1@us.af.mil James Glidewell
402 CMXG/MXDEA
420 Peacekeeper Way Building 364 Robins AFB, GA 31098 DoDAAC: F3QCCM
(478) 327-3349 james.glidewell.1@us.af.mil
2.2 Delivery/Shipping. The Contractor shall deliver the items to the address in paragraph 2.3 no later than 140 days after contract award. FOB Destination.
2.2.1 Ship To Address.
Bldg 364 420 Peacekeeper Way DoDAAC: F3QCCM Robins AFB, GA 31098
Mark For: Heath Henry, 402 CMXG/MXDEP, (478) 222-4068, heath.henry.1@us.af.mil.
2.2.2 Delivery Specifications. Building 364 has its own loading dock, ramps and stairs if needed. The Government can provide a forklift for the MicroBulk Tank and Filling Unit.
2.4 Incidental Services.
2.4.1 Installation.
2.4.1.1 Contractor will perform installation of KC-46 Bottle Filling Station.
2.4.2 Training.
2.4.2.1 The Contractor shall provide on-site training for up to eight (8) Government personnel for the KC-46 Bottle Filling Station and shall occur no later than seven (7) days after delivery. Training shall consist of one (1) 1-day business day, up to an eight (8) hour workday and shall be coordinated with the Government Points of Contact to schedule training.
2.4.3 Functional Testing.
2.4.3.1 Contractor will perform Functional Testing of KC-46 Bottle Filling Station.
2.4.4 Upon delivery, the contractor shall provide the American Society of Mechanical Engineers (ASME) or Department of Transportation (DOT) certification with the MicroBulk Tank. The certification shall show that tests have been performed, inspections made, parts/assemblies/equipments/systems have been installed, tested, inspected, and are ready for operation, or that specific qualifications have been obtained shall provide objective evidence in support of the certification. The Contractor shall provide Government with one (1) hard copy and/or one (1) electronic copy. All copies shall be legible and written in English. (CDRL A001, DI-MISC-82386, Certification Data/Report Technical Content Requirements)
2.5 Warranty. The Contractor shall provide a one (1) year warranty on all equipment and workmanship and a five (5) year warranty on MicroBulk Tank.
2.6 A separate contract will be set up for regular refilling of MicroBulk Co2 Tank.
3. Government Furnished Equipment and Services or Government Furnished Property (PFP) and services.
3.1 None.
4. General Information.
4.1 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 364 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 6:30 am to 2:30 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.
4.2 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.3 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.3.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.4 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.5 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.6 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.7 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:
· Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle Management,
· SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition,
· National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev 5, Security and Privacy Controls for Information Systems and Organizations.
4.8 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.9 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number: Commercial 478-222-1972.
4.10 Environmental Management Systems (EMS) Awareness. Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
4.10.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. Contractors that do not have a Common Access Card must exercise Option 2.
4.10.2 Option 1 (Preferred Option): The Air Force version of EMS Awareness Training is available through the myLearning website: https://lms-jets.cce.af.mil/. EMS Awareness Training is located under the Air Force Civil Engineer Center (AFCEC) /Air Force Environmental Courses tab. This option is only available to contractors who have a CAC and requires self-enrollment.
4.10.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training Power Point Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.
4.11 ISO 5001-Energy Management. System Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.11.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.11.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.11.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.
4.12 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.12.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A002, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.12.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
4.13 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926-3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
| a. Contract, Contract Number, Name and Title of Person(s) Reporting |
| b. Date, Time and exact location of accident/incident |
| c. Brief Narrative of accident/incident (Events leading to accident/incident) |
| d. Cause of accident/incident, if known |
| e. Estimated cost of accident/incident (material and labor to repair/replace) |
| f. Impound Authority Name and Phone Number (as applicable) |
| g. Nomenclature of equipment and personnel involved in accident/incident |
| h. Corrective actions (taken or proposed) |
| i. Other pertinent information |
(CDRL A003, DI-SAFT-81563 NOT 2, Accident/Incident Report)
5 Appendices.