72805 - Atch 1 Shop Layout.pptx
PPTX presentation 3 MB Posted
- Attached to
- KC-46 Bottle Filling Station
- Solicitation number
- FA8571-23-Q-0069
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WarrantyInformation-VERSION2.6.pdf | ||
| Solicitation - FA857123Q0069.pdf | ||
| SourceofRepairInstructions-VERSION2.1.pdf | ||
| Wage Determination.pdf | ||
| 72805 - PD.docx | DOCX document | |
| 72805 - CDRL A003 - Accident Incident Report.pdf | ||
| 72805 - App C.docx | DOCX document | |
| 72805 - CDRL A002 - Contractors Safety Plan.pdf | ||
| 72805 - CDRL A001 - ASME DOT Cert.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Current Shop Layout
Proposed Layout This Layout shows where the most probable MicroBulk tank location as well as the Fill Station Modular where bottles would be filled. A CO2 line would have to be ran from the tank to the modular and from the tank to the fill box outside. A line from the N2 Booster will also have to be ran into the modular building.
Shop Photos image1.png image2.png image3.png image4.jpeg image5.jpeg image6.jpeg image7.png image8.png image9.jpeg image10.jpeg
File details come from the government source that posted it. Updated .