724022-Bid Tabulation.pdf
PDF 75 KB Posted
- Attached to
- 245118 Laurel Avenue NE Waterline Replacement
- Solicitation number
- S-KS0043-00013612
- Issued by
- Marion County, Oregon
About this file
This bid tabulation document is from the City of Salem, Oregon, for the Laurel Avenue NE Waterline Replacement project (Bid No. 245118, Project No. 724022). The project involves installing approximately 778 linear feet of 8-inch ductile iron waterline, including water services, fire hydrant assembly, customer service reconnections, and associated infrastructure improvements. The bid closing date is May 13, 2025, with three bidders evaluated: Premier Property Development LLC (low bidder), Flow Line Construction LLC (2nd low bidder), and Pacific North Construction LLC (3rd low bidder). The bid tabulation details 22 separate line items covering mobilization, traffic control, erosion control, pipe installation, service connections, and various restoration and patching work.
The bid tabulation reveals significant variation in unit pricing across bidders, with the low bidder (Premier Property Development LLC) submitting a total bid of $226,500.00, compared to the engineer's estimate of $436,916.00. The engineer's estimated project value ranges between $375,000 and $475,000. The bid includes multiple contractors, with several listed as non-responsive. Pricing covers comprehensive infrastructure work including water service installations, chlorination assemblies, blow-off assemblies, sidewalk repairs, and pavement patching. The document provides a detailed breakdown of unit prices for each project component, allowing for comprehensive comparison across bidders and against the original engineering estimate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 724022 Intent to Award.pdf | ||
| 724022-Project Manual.pdf | ||
| 724022-Bid Register with Rank~1.pdf | ||
| 724022- Signed Final Plans.pdf | ||
| Locum House Scope of work insullation 041425.docx | DOCX document | |
| Bid Opening Zoom Link~3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABULATION OF BIDS FOR:
Average of 3
(*) figures changed to reflect accurate extension or addition 2 nd
Low Bidder 3 rd
Low Bidder Lowest Bidders
NO. QUANTITY
UNIT OF
MEASURE UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE UNIT PRICE UNIT PRICE
1 210 Mobilization All Req'd Lump Sum 40,000.00 40,000.00 31,624.66 31,624.66 26,700.00 30,000.00 29,441.55
2 225
Temporary Work Zone Traffic Control, (Complete) All Req'd Lump Sum 15,000.00 15,000.00 12,000.00 12,000.00 6,435.00 6,500.00 8,311.67
3 220
Temporary Accommodations for
Pedestrians, (Complete) All Req'd Lump Sum 2,500.00 2,500.00 10,000.00 10,000.00 530.00 3,000.00 4,510.00
4 280 Project Notification Signs 2 Each 1,350.00 2,700.00 500.00 1,000.00 280.00 300.00 360.00
5 207 Erosion Control Measures a 207 Erosion Control & Sediment Prevention All Req'd Lump Sum 2,500.00 2,500.00 2,500.00 2,500.00 1,654.00 2,000.00 2,051.33 b 207 Silt Sacks 9 Each 80.00 720.00 50.00 450.00 33.00 35.00 39.33 c 207 Biofilter Bags 27 Each 20.00 540.00 4.74 127.98 15.00 20.00 13.25 d 703 Tree Protection Fence 136 Lin. Ft. 10.00 1,360.00 1.51 205.36 2.25 5.00 2.92
6 208 Restoration and Cleanup All Req'd Lump Sum 2,000.00 2,000.00 4,000.00 4,000.00 4,520.00 1,500.00 3,340.00
7 241
Foundation Stabilization (Stipulated
Price) 5 Cu. Yd. 80.00 400.00 80.00 400.00 80.00 80.00 80.00
8 242 Rock Excavation (Stipulated Price) 5 Cu. Yd. 180.00 900.00 180.00 900.00 180.00 180.00 180.00
9 510
8-inch Ductile Iron Pipe - Class 52, Trench Excavation, and Crushed Rock
Backfill with Restrained Joints 778 Lin. Ft. 120.00 93,360.00 125.00 97,250.00 114.50 125.00 121.50
#2 Flow Line
Construction
#3 Pacific
North 5/13/2025
Engineer's
Estimate
Laurel Avenue NE Waterline Replacement
Premier Property Development, LLC
160 SW Wyatt St
Low Bidder
Dallas, OR 97338
Project Number:
Bid/Contract Number:
Closing Date:
724022
245118 Project Manager
Julia Gonzalez, PE
\\pubwks\pwfiles\Group\Engineering\Projects\CIP\724022 Laurel Ave Waterline\11 Ad Bid Award\Contract Book\724022-aba-master.xlsm\Bid Tabulation
Page 1 of 3 Tabulation of Bids
(*) figures changed to reflect accurate extension or addition 2 nd
Low Bidder 3 rd
Low Bidder Lowest Bidders
NO. QUANTITY
UNIT OF
MEASURE UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE UNIT PRICE UNIT PRICE
#2 Flow Line
Construction
#3 Pacific
North 5/13/2025
Engineer's
Estimate
Laurel Avenue NE Waterline Replacement
Premier Property Development, LLC
160 SW Wyatt St
Low Bidder
Dallas, OR 97338
Project Number:
Bid/Contract Number:
Closing Date:
724022
245118 Project Manager
Julia Gonzalez, PE
10 540 Water Service (Main to Meter)
10a 540
1-inch Water Service - Long (Longer than 15 Lin. Ft) 19 Each 3,000.00 57,000.00 750.00 14,250.00 2,700.00 3,500.00 2,316.67
10b 540 2-inch Water Service 1 Each 6,000.00 6,000.00 750.00 750.00 8,000.00 9,000.00 5,916.67
10c 541 Customer Service Reconnection 20 Each 1,000.00 20,000.00 450.00 9,000.00 450.00 500.00 466.67
11 530
Fire Hydrant Assembly (Including
Mainline Tee) 1 Each 8,000.00 8,000.00 5,000.00 5,000.00 9,889.00 9,500.00 8,129.67
12 510 Ductile Iron Fittings
12a 510 8-inch 45° Bend (ALL MJ) 10 Each 500.00 5,000.00 250.00 2,500.00 450.00 700.00 466.67
12b 510 8-inch Foster Adaptor (MJ) 1 Each 350.00 350.00 250.00 250.00 400.00 400.00 350.00
13 540 1-inch Chlorination Assembly 2 Each 2,000.00 4,000.00 500.00 1,000.00 500.00 1,500.00 833.33
14 550 Blow Off Assembly per Std. 407 2 Each 2,000.00 4,000.00 500.00 1,000.00 1,600.00 2,750.00 1,616.67
15 402
Sanitary Sewer Lateral Replacement and
Reconnection for Conflict with Water
Main 1 Each 3,000.00 3,000.00 5,000.00 5,000.00 6,970.00 2,500.00 4,823.33
16 380
Type A, PCC Curb and Gutter Over
Variable Thickness of 1"-0 Aggregate
Base 27 Lin. Ft. 85.00 2,295.00 100.00 2,700.00 142.00 100.00 114.00
17 385
Sidewalk, 4 inches of PCC Over 2 inches of 1"-0 Aggregate Base 700 Sq. Ft. 40.00 28,000.00 10.00 7,000.00 21.00 20.00 17.00
\\pubwks\pwfiles\Group\Engineering\Projects\CIP\724022 Laurel Ave Waterline\11 Ad Bid Award\Contract Book\724022-aba-master.xlsm\Bid Tabulation
Page 2 of 3 Tabulation of Bids
(*) figures changed to reflect accurate extension or addition 2 nd
Low Bidder 3 rd
Low Bidder Lowest Bidders
NO. QUANTITY
UNIT OF
MEASURE UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE UNIT PRICE UNIT PRICE
#2 Flow Line
Construction
#3 Pacific
North 5/13/2025
Engineer's
Estimate
Laurel Avenue NE Waterline Replacement
Premier Property Development, LLC
160 SW Wyatt St
Low Bidder
Dallas, OR 97338
Project Number:
Bid/Contract Number:
Closing Date:
724022
245118 Project Manager
Julia Gonzalez, PE
18 385
Sidewalk, 6 inches of PCC Over 2 inches of 1"-0 Aggregate Base 277 Sq. Ft. 40.00 11,080.00 10.00 2,770.00 40.00 30.00 26.67
19 390 Detectable Warning Surface 20 Sq. Ft. 70.00 1,400.00 10.00 200.00 22.00 50.00 27.33
20 270 Temporary Trench Patch 798 Lin. Ft. 12.00 9,576.00 5.00 3,990.00 4.50 5.00 4.83
21 270
Level 2 HMAC 1/2-inch Dense
(Permanent Trench Patching with T-Cut) 851 Lin. Ft. 135.00 114,885.00 12.00 10,212.00 51.00 35.00 32.67
22 867 Pavement Bar, Type B-HS 14 Sq. Ft. 25.00 350.00 30.00 420.00 105.00 25.00 53.33
Total 436,916.00 226,500.00
2nd Low Bidder 304,563.00
3rd Low Bidder 317,220.00
391,512.00
425,730.75 non-responsive non-responsive non-responsive non-responsive non-responsive
#2 Flow Line Construction LLC
#3 Pacific North Construction, LLC
North Santiam Paving Co.
Turney Excavating Inc.
#4 North Core USA, LLC
#5 Wind Rose Excavation, LLC
Civil West Construction
Jesse Rodriguez Construction LLC
M.L. Houck Construction Co.
Remaining Bidders
\\pubwks\pwfiles\Group\Engineering\Projects\CIP\724022 Laurel Ave Waterline\11 Ad Bid Award\Contract Book\724022-aba-master.xlsm\Bid Tabulation
Page 3 of 3 Tabulation of Bids