723106 Final Plans.pdf
PDF 9 MB Posted
- Solicitation number
- S-KS0043-00012485
- Issued by
- Marion County, Oregon
About this file
This is a construction plan set from the Salem Public Works Department for the Silverton Road Sanitary Sewer Rehabilitation project (PN: 723106). The project involves rehabilitating existing sanitary sewer infrastructure along Silverton Road NE from Evergreen Avenue NE to Lana Avenue NE in Salem, Oregon. The work includes installing UV CIPP liner in existing sewer mains, rehabilitating manholes with cementitious lining and epoxy coating, reconstructing lateral connections, and installing new cleanouts. The project requires extensive traffic control measures, with work on Silverton Road limited to night hours (9:00 PM to 6:00 AM), and bypass pumping operations handling flows up to 19 MGD during wet weather conditions.
The plans include detailed requirements for erosion control, traffic management, and bypass pumping operations. The bypass pumping system must maintain service to all properties during construction and includes two separate setups managing different flow zones. The contractor must protect existing utilities, maintain access to businesses and residences throughout construction, and restore all disturbed areas according to City of Salem standards. Special coordination is required for work around a 24-inch steel waterline crossing, and some property coordination may require bilingual (Spanish) communication capabilities from the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024-118 Notice of intent.pdf | ||
| 723106 Addenum 1 - Final Plans.pdf | ||
| 245059 Bid Opening Zoom Link.pdf | ||
| Intent to Award~1.pdf | ||
| 723106 Addendum 1.pdf | ||
| 723106-Bid Tabulation.pdf | ||
| Bid No. 245059-Bid Register.pdf | ||
| 723106 Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:1
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 1-
G -0
1-
TI
TL
E.
dw g (G
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
G-01
TITLE SHEET
CITY OF SALEM - DEPARTMENT OF PUBLIC WORKS
555 LIBERTY STREET SE - SALEM, OREGON 97301
VICINITY MAP
PN: 723106
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
Call before you dig.
Know what's below.
ATTENTION:
EVERGREEN AVENUE NE TO LANA AVENUE NE
PROJECT
AREA
LANA AVE NE
HIGHWAY AVE NE
SILVERTON ROAD NE
EV
ER
G R
EE
N
A
VE
N E
PA
R
K A
VE
N
E
D U
N C
AN
A
VE
N
E
AB
R
AM
S
A
VE
N E
STATE
FAIRGROUNDS
0 125 250 500
FEET
WALDO
MIDDLE
SCHOOL
WASHINGTON
ELEMENTARY
SCHOOL
UTILITY CONTACTS
COMPANY NAME PHONE EMAIL
CITY OF SALEM ENGINEERING 503-588-6211
DISPATCH 503-588-6333
PGE (DISTRIBUTION) KEN SPENCER 503-970-7200 kenneth.spencer@PGN.com
PGE (LIGHTING) JESSE WOODBURY 503-672-5498 jesse.woodbury@PGN.com
NW NATURAL SEAN MILLER 971-712-4711 sean.miller@nwnatural.com
LUMEN TECHNOLOGIES TRAVIS VAUGHN 503-399-4931 Travis.Vaughn@CenturyLink.com
COMCAST JASON MCDONALD 503-924-9120 jason_mcdonald3@Comcast.net
(CENTURY LINK)
BENCHMARK UTILIZED:
MARION COUNTY "RACE", PID 433
ELEV: 171.13' NGVD 29
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:1
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 1-
G -0
1-
TI
TL
E.
dw g (G
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
G-02
SHEET INDEX
SHEET INDEX
GENERAL
EROSION CONTROL
TEMPORARY TRAFFIC CONTROL
SANITARY SEWER
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:1
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 1-
G -0
1-
TI
TL
E.
dw g (G
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
G-03
GENERAL
CONSTRUCTION
NOTES & LEGEND
GENERAL CONSTRUCTION NOTES
1. ALL CONSTRUCTION SHALL BE TO CITY OF SALEM STANDARD DRAWINGS AND STANDARD CONSTRUCTION
SPECIFICATIONS (SCS) AND THE SPECIAL PROVISIONS DEVELOPED FOR THIS PROJECT.
2. REFERENCE SCS FOR REQUIREMENTS REGARDING PROTECTION OF EXISTING FACILITIES AND TREES.
3. REFERENCE SCS FOR REQUIREMENTS REGARDING OPERATION OF EXISTING WATER VALVES.
4. REFERENCE SCS FOR TRAFFIC PROTECTION AND CONTROL REQUIREMENTS.
5. UTILITY COORDINATION:
A. THE LOCATION AND DESCRIPTION OF EXISTING UTILITIES SHOWN ARE COMPILED FROM
AVAILABLE RECORDS AND/OR FIELD SURVEYS. THE CITY OR UTILITY COMPANIES DO NOT
GUARANTEE THE ACCURACY NOR THE COMPLETENESS OF SUCH RECORDS.
B. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY
NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR
952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE
TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987).
C. PROVISIONS SHALL BE MADE BY THE CONTRACTOR TO KEEP ALL EXISTING UTILITIES IN SERVICE AND
PROTECT THEM DURING CONSTRUCTION.
D. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE
REMOVED BY THE CONTRACTOR TO THE EXTENT NECESSARY TO ACCOMPLISH THE WORK.
THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED UTILITIES.
6. REFERENCE SCS FOR ANY ADDITIONAL UTILITY COORDINATION REQUIREMENTS.
7. THE CONTRACTOR SHALL BE EXPECTED TO VISIT THE SITE AND MAKE THEIR OWN DETERMINATION OF
TOPOGRAPHIC FEATURES REQUIRING RESTORATION.
8. DO NOT REMOVE TREES EXCEPT AS APPROVED BY THE ENGINEER. PROTECT ALL ROOTS TWO
INCHES AND LARGER IN DIAMETER. TRIM TREES, SHRUBS AND HEDGES ONLY AS DIRECTED BY THE ENGINEER. REFERENCE SCS FOR REQUIREMENTS REGARDING PROTECTION OF TREES AND ROOTS AND
TREE TRIMMING.
9. ALL CONSTRUCTION SHALL CONFORM TO OREGON D.E.Q. PERMIT No. 1200-CA, A COPY OF WHICH IS
INCLUDED FOLLOWING THE SPECIAL PROVISIONS.
10. REFERENCE THE SPECIAL PROVISIONS AND SCS REGARDING TEMPORARY AND PERMANENT PAVEMENT
PATCHING REQUIREMENTS.
GENERAL CONSTRUCTION LEGEND
COM
CATV CATV CATV CATV CATV CATVCATV
COM COM COM COM COM COM COM
FOC FOC FOC FOC FOC FOC FOC FOC
GAS GAS GAS GAS GAS GAS GAS GAS
OH LINES OH LINES OH LINES OH LINES OH LINES
PH PH PH PH PH PH PH PH PH
ELEC ELEC ELEC ELEC ELEC ELECELEC
SS SS SS SS SS SS SS SS SS
SD SD SD SD SD SD SD SD SD
W W W W W W W W W W
EXISTING EXISTING
RECONSTRUCT LATERAL
(OPEN CUT)
PER COS STD DWG No. 106 w/ TAP
REHABILITATE MANHOLE
NEW MAINLINE U.V. C.I.P.P. LINER
PROPOSED
NEW LATERAL CLEANOUT
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:1
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 1-
G -0
1-
TI
TL
E.
dw g (G
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
G-04
PAGE LAYOUT
SHEET
PAGE LAYOUT SHEET
SS-01
SS-02
0 50 100 200
FEET
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:2
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 1-
G -0
1-
TI
TL
E.
dw g (G
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
G-05
SURVEY CONTROL
SHEET
SURVEY CONTROL SHEET
0 50 100 200
FEET
NOTE:
HORIZONTAL DATUM:
OREGON STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NAD83(2011),
EPOCH 2010.00. COORDINATES SHOWN ARE IN UNITS OF INTERNATIONAL
FEET AND ARE ON A LOCAL DATUM PLANE (LDP) TO REPRESENT TRUE
GROUND DISTANCES. APPLY SCALE FACTOR 0.999890454 ABOUT THE
MIDPOINT OF A BASELINE BETWEEN POINTS 1 AND 20 TO CONVERT
COORDINATES FROM THE LDP TO STATE PLANE.
VERTICAL DATUM:
NGVD 1929(47)
# SURVEY CONTROL POINT
FOUND MONUMENT#
SURVEY MONUMENT PRESERVATION
SHOWN SURVEY CONTROL IS NOT ALL INCLUSIVE OF ALL SURVEY
MONUMENTS WITHIN THE WORK AREA. THE CONTRACTOR SHALL
NOTIFY THE CITY INSPECTOR OR PROJECT ENGINEER WITHIN 24
HOURS OF ANY SURVEY MONUMENT DISTURBED/DESTROYED BY
CONSTRUCTION ACTIVITIES.
BENCHMARK UTILIZED:
MARION COUNTY "RACE", PID 433
ELEV: 171.13' NGVD 29
LEGEND:
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:2
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 6-
EC
-0
1- 5.
dw g
(E C
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
EC-01
EPSC NOTES
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC)
1. THE CONTRACTOR SHALL PROVIDE DAILY MEASURES TO ENSURE SEDIMENT
CONTROL DURING NON-WORK HOURS.
2. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED ON PRIVATE
INLETS TO ENSURE SEDIMENT CONTROL WITHIN THE WORK AREA.
3. THE PROJECT SITE SHALL HAVE A CONCRETE WASHOUT BASIN AVAILABLE
PER STD. PLAN 917 OR APPROVED EQUAL.
4. ALL TEMPORARY STOCKPILES AND CONCRETE MANAGEMENT FACILITIES
SHALL BE LOCATED A MINIMUM OF 50 FEET FROM ANY DRAINAGE INLET OR
WATERCOURSE.
5. DO NOT PLACE BIOFILTER BAGS IN BIKE LANE OR IN LOCATIONS THAT WOULD
BE HAZARDOUS TO THE TRAVELING PUBLIC.
GENERAL EPSC NOTES
(a) Pre-Construction (1). Prior to any land disturbing activities, the boundaries of the clearing and grading limits, vegetated buffers, and any sensitive areas shown on this plan shall be clearly delineated in the field. Unless otherwise approved, no disturbance is permitted beyond the clearing limits. The contractor must maintain the delineation for the duration of the project. Note: vegetated corridors to be delineated with orange construction fence or approved equal.
(2). BMPS that must be installed prior to land disturbing activities are construction entrance, perimeter sediment control, and inlet protection.
(3). Hold a preconstruction conference to review the EPSC and with the city’s project manager and inspector.
(b) Construction (1). All sediment is required to stay on site. Sediment amounts greater than ½ cubic foot which leave the site must be cleaned up within 24 hours and placed back on the site and stabilized or properly disposed.
Vacuuming or dry sweeping must be used to clean up released sediment and it must not be swept or washed into storm sewers, drainage ways, or water bodies. The cause of the sediment release must be found and prevented from causing a recurrence of the discharge within the same 24 hours. Any i in-stream clean up of sediment shall be performed according to the DSL required time frame.
(2). Construction, maintenance, replacement, and upgrading of erosion prevention and sediment control facilities is the sole responsibility of the contractor until all construction is completed,approved, and permanent erosion control (i.e., vegetation/landscaping) is established on all disturbed areas.
(3). All recommended erosion prevention and sediment control procedures are dependent on construction methods, staging, site conditions, weather, and scheduling. During the construction period, erosion control facilities shall be revised, upgraded, replaced, or added, to comply with SRC and State and Federal regulatory requirements.
(4). The contractor is solely responsible for protection of all adjacent property and downstream facilities from erosion and siltation during project construction. Any damage resulting from such erosion and siltation shall be corrected at the sole expense of the contractor.
(5). When saturated soil is present, water-tight trucks must be used to transport saturated soils from the construction site. Soil may be drained on site at a designated location, using appropriate BMPs. Soil must be drained sufficiently to drip less than one gallon per hour prior to leaving the site.
(6). All materials spilled, dropped, or washed into storm drains must be removed immediately, and the contractor shall provide protection of downstream inlets and catch basins to ensure sediment-laden water does not enter the storm drain system.
(7). All discharge of sediment-laden water must be treated with an appropriate bmp to remove sediment from discharge waters and to comply with SRC and State and Federal regulatory permits.
(8). In areas subject to wind erosion, appropriate BMPs must be used which may include the application of fine water spraying, plastic sheeting, mulching, or other approved measures.
(9). The EPSC measures and BMPs shown on this plan are the minimum requirements for anticipated site conditions. During the construction period, these measures shall be upgraded as needed to maintain compliance with all regulations.
(10). The contractor shall provide onsite water or other appropriate BMPs to prevent dust and wind erosion of fine grain soils.
(11). Disturbed areas must be stabilized after 14 days of inactivity, or immediately if rain is forecasted.
See subsection 7A.1(d)-Wet Weather Period.
(12). During the wet weather work period or when rain is forecasted, all active and inactive soil stock piles must be covered with appropriate plastic sheeting. Plastic sheeting must cover the entire stock pile and be sufficiently anchored.
(c) Pollutants, Solid Waste and Hazardous Materials Management (1). Any use of toxic or other hazardous materials must include proper storage, application, and disposal.
(2). The contractor is solely responsible to properly manage pollutants, hazardous wastes, used oils, contaminated soils, concrete waste, sanitary waste, liquid waste, or other toxic substances discovered or generated during construction to prevent leakage, spills or release of pollutants to the environment and surface waters.
(3). Contractor shall develop a project specific written spill prevention and response procedures that includes employee training on spill prevention and proper disposal procedures; regular maintenance schedule for vehicles and machinery; and material delivery and storage controls, signage, material use, and use of covered storage areas for waste and supplies. The plan shall comply with SRC and Federal and State requirements, and shall be available on site at all times.
(d) Wet Weather Period (October 15 through April 30) (1). Construction activities must avoid or minimize the duration of disturbed areas.
(2). Temporary stabilization of the site including covering of bare soils with approved BMPs, must be installed at the end of the shift before a holiday or weekend, or at the end of each workday if rainfall is forecast in the next 24 hours.
(3). Temporary stabilization or covering of soil stockpiles and protection of stockpiles located away from construction activity must occur at the end of each workday.
(e) Maintenance (1). Erosion control measures shall be maintained in such a manner as to ensure that erosion is prevented and sediment-laden water does not enter a drainage system, roadway, or violate applicable water quality standards.
(2). Sediment shall not be washed or swept into storm sewers, drainage ways, or water bodies.
(3). Sediment must be removed from behind all sediment control measures when it has reached a height of 1/3 the barrier height, and prior to the control measures removal.
(4). Removal of trapped sediment in a sediment basin or sediment trap or catch basins must occur when the sediment retention capacity has been reduced by 50 percent; is not functioning properly and/or at the completion of project.
(5). Cleaning of all structures, inlet protection BMPs, and sump pumps must be completed regularly and as required to ensure structures and inlets function properly and flow freely.
(6). Construction site exits shall be maintained in a condition that will prevent tracking or flow of mud onto the row or approved access point. The entrance may require periodic top dressing as conditions demand, and repair and/or cleanout of any structures used to trap sediment. Wheel washing shall be required to prevent sediment and material tracking on road surfaces if passive BMPs are not effective.
(f) Inspection (1). The EPSC must be kept onsite at all times. All measures shown on the plan must be installed properly to ensure compliance with SRC and State and Regulatory permits, and that sediment does not enter a surface water system, roadway, or other properties.
(2). Written EPSC inspection logs shall be maintained onsite and available to city inspectors upon request.
(3). All BMPs shall be inspected at least every week. When a rainfall event exceeds ½" in a 24-hour period, daily inspection of the erosion controls, sediment controls, and discharge outfalls must be conducted and documented. Inspections shall be done by a representative of the permit registrant who is knowledgeable and experienced in the principles, practices, installation, and maintenance of erosion and sediment controls.
(g) Inactive Construction Periods and Post-Construction (1). Should work cease in any area for 14 days, the inactive area must be stabilized with appropriate soil stabilization BMPs. If all construction activity ceases the entire site must be temporarily stabilized using vegetation, heavy mulch layer, temporary seeding, or other method.
(2). All temporary erosion prevention and sediment control facilities shall be removed by the contractor within 30 days after permanent landscaping/vegetation is established and the threat of erosion and sediment transport has been mitigated.
(3). Temporary grass cover measures must be fully established by October 15 or other cover measures (i.e., erosion control blankets with anchors, one-inch of straw mulch, six mil HDPE plastic sheet, etc.)
shall be in place over all disturbed soil areas until April 30. To establish an adequate grass stand for controlling erosion by October 15, it is recommended that seeding and mulching occur by September 1.
(4). Permanent erosion control vegetation on all embankments and disturbed areas shall be re-established as soon as construction is completed.
(h) Specifications (1). Soil preparation. Topsoil should be prepared according to the landscape plans, if available, or recommendations of the grass seed supplier. Slopes shall be textured before seeding by rack walking (i.e., driving a crawling tractor up and down the slopes to leave a pattern of cleat imprints parallel to slope contours) or other method to provide stable areas for seeds to rest.
(2). Seeding. Erosion control grass seed mix shall be as follows: Dwarf grass mix (low height, low maintenance) consisting of dwarf perennial ryegrass (80 percent by weight), creeping red fescue (20 percent by weight). Application rate shall be 100 pounds per acre minimum.
(3). Grass seed shall be fertilized at a rate of ten pounds per 1,000 square feet with 16-16-16 slow release type fertilizer. Disturbed areas within 50 feet of water bodies and wetlands must use a non-phosphorous fertilizer.
(4). The application rate of fertilizers used to reestablish vegetation shall follow manufacturer's recommendations. Nutrient releases from fertilizers to surface waters shall be minimized. Time release fertilizers shall be used. Care shall be made in the application of fertilizers within any waterway riparian zone to prevent leaching into the waterway.
(5). When used, hydromulch shall be applied with grass seed at a rate of 2,000 pounds per acre between April 30 and June 10, or between September 1 and October 1. On slopes steeper than ten percent, hydroseed and mulch shall be applied with a bonding agent (tackifier). Application rate and methodology shall be in accordance with seed supplier recommendations.
(6). When used in lieu of hydromulch, dry, loose, weed-free straw used as mulch shall be applied at a rate of 4,000 pounds per acre (double the hydromulch application requirement). Anchor straw by working in by hand or with equipment (rollers, cleat trackers, etc.). Mulch shall be spread uniformly immediately following seeding.
(7). When conditions are not favorable to germination and establishment of the grass seed, the Contractor shall irrigate the seeded and mulched areas as required to establish the grass cover.
(8). Sediment fences shall be constructed of continuous filter fabric to avoid use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum six-inch overlap, and both ends securely fastened to a post.
(9). The standard strength filter fabric shall be fastened securely to stitched loops installed on the upslope side of the posts, and six inches of the fabric shall be extended into the trench. The fabric shall not extend more than 30 inches above the original ground surface. Filter fabric shall not be stapled to existing trees.
(10). Bio-filter bags shall be clean 100 percent wood product waste. Bags shall be 18-inch x 18-inch x 30-inch, weigh approximately 45 pounds, and be contained in a bag made of ½ inch plastic mesh.
(11). Minimum wet weather slope protection. For 3H:1V or steeper slopes use Bon Terra Type C2 or North American Green Type C125 erosion control blankets. Use a minimum of two inches straw mulch or North American Green Type S150 for slopes flatter than 3H:1V and greater than 6H:1V. Slopes flatter than 6H:1V use one inch straw mulch, hydroseed with hydromulch and tackifier. Slope protection shall be placed on all disturbed areas immediately after completion of each section of construction activity, until the erosion control seeding has been established. As an option during temporary or seasonal work stoppages, a six-mil HDPE plastic sheet may be placed on exposed slopes. The plastic sheet shall be provided with an anchor trench at the top and bottom of the slope, and shall be sandbagged on the slopes as required to prevent damage or displacement by wind.
DESIGN STANDARDS NOTES
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:3
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 6-
EC
-0
1- 5.
dw g
(E C
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
EC-02
EPSC PLAN
LANA AVE &
SILVERTON RD
0 20 40 80
FEET
0 20 40 80
FEET
EROSION CONTROL LEGEND
STRAW WATTLE
HYDROSEED ALL DISTURBED AREAS ON FAIRGROUNDS AFTER
WORK IS COMPLETE.
INLET PROTECTION
- USE SILT SACKS PER STD PLAN 913 FOR STANDARD CB'S.
- USE BIOFILTER BAGS PER STD PLAN 914 FOR CURB INLETS.
NOTE: THIS IS REQUIRED ON ALL INLETS RECEIVING FLOW
FROM THE PROJECT.
DRAINAGE FLOW DIRECTION
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:3
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 6-
EC
-0
1- 5.
dw g
(E C
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
EC-03
EPSC PLAN
EVERGREEN AVE
0 20 40 80
FEET
EROSION CONTROL LEGEND
STRAW WATTLE
HYDROSEED ALL DISTURBED AREAS ON FAIRGROUNDS AFTER
WORK IS COMPLETE.
INLET PROTECTION
- USE SILT SACKS PER STD PLAN 913 FOR STANDARD CB'S.
- USE BIOFILTER BAGS PER STD PLAN 914 FOR CURB INLETS.
NOTE: THIS IS REQUIRED ON ALL INLETS RECEIVING FLOW
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:3
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 6-
EC
-0
1- 5.
dw g
(E C
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
EC-04
EPSC PLAN
EVERGREEN AVE
0 20 40 80
FEET
EROSION CONTROL LEGEND
STRAW WATTLE
HYDROSEED ALL DISTURBED AREAS ON FAIRGROUNDS AFTER
WORK IS COMPLETE.
INLET PROTECTION
- USE SILT SACKS PER STD PLAN 913 FOR STANDARD CB'S.
- USE BIOFILTER BAGS PER STD PLAN 914 FOR CURB INLETS.
NOTE: THIS IS REQUIRED ON ALL INLETS RECEIVING FLOW
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:4
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\ 6-
EC
-0
1- 5.
dw g
(E C
-0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
EC-05
EPSC PLAN
SILVERTON RD -
EVERGREEN AVE
to PARK AVE
0 20 40 80
FEET
EROSION CONTROL LEGEND
INLET PROTECTION
USE SILT SACKS PER STD PLAN 913 FOR
STANDARD CB'S.
USE BIOFILTER BAGS PER STD PLAN 914 FOR
CURB INLETS.
NOTE: THIS IS REQUIRED ON ALL INLETS
RECEIVING FLOW FROM THE PROJECT.
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:4
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-T C
-0 1-
6.
dw g (T
C -0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
TC-01
TRAFFIC CONTROL
NOTES & SIGNS
SIGN LEGEND
TRAFFIC CONTROL NOTES: PEDESTRIAN NOTES:
9.) THE STAGING PLANS PROVIDE GUIDANCE FOR PLACEMENT OF
SIGNAGE AND CHANNELIZING DEVICES, CERTAIN CONSTRUCTION
ACTIVITIES MAY REQUIRE ADDITIONAL SIGNS OR CHANNELIZING
DEVICES.
11.) ALL FLEXIBLE SIGNS AND PORTABLE SIGN SUPPORTS SHALL BE
CRASHWORTHY.
10.) SIGNS PLACED CONTINUOUSLY FOR LONGER THAN THREE DAYS
SHALL BE POST-MOUNTED.
12.) RIGID SIGNS MAY BE USED ON BARRICADES WHEN APPROPRIATELY
CRASH TESTED.
8.) SIGN LOCATIONS SHOWN ARE APPROXIMATE AND SHOULD BE
ADJUSTED IN THE FIELD FOR CONFLICTS SUCH AS SIGHT
DISTANCE, DRIVEWAYS, LANDSCAPING, UTILITIES, ETC.
7.) CONTRACTOR SHALL PROTECT TRAFFIC AND SHALL
PROVIDE TRAFFIC CONTROL AT ALL TIMES DURING CONSTRUCTION.
6.) MAINTAIN LOCAL ACCESS AT ALL TIMES.
4.) SEE SPECIAL PROVISIONS AND TEMPORARY TRAFFIC CONTROL
SHEETS FOR STREET WORK TIME LIMITATIONS.
3.) USE FLAGGERS AND TEMPORARY TRAFFIC CONTROL AS
REQUIRED WITH AN APPROVED WORK IN RIGHT-OF-WAY
PERMIT. REFER TO THE MUTCD AND THE OTTCH.
2.) REFER TO THE MUTCD AND THE OREGON TEMPORARY
TRAFFIC CONTROL HANDBOOK (OTTCH) FOR DISTANCES
BETWEEN SIGNS AND CONES, UNLESS OTHERWISE NOTED.
1.) CONTRACTOR TO COMPLY WITH ALL FEDERAL, STATE AND
LOCAL GUIDELINES FOR TRAFFIC CONTROL.
1.) CONTRACTOR TO PROVIDE PROPER SIGNAGE AND MAINTAIN
A SAFE ACCESSIBLE ROUTE FOR PEDESTRIAN TRAFFIC AT ALL
TIMES DURING CONSTRUCTION.
W20-1 36" x 36"
48" x 24" W1-7
W20-5 36" x 36"
W4-2 36" x 36"
W20-5 36" x 36"
W4-2 36" x 36"
2R2L
3R3L
36" x 36" W20-3
R11-2 48" x 30"
30" x 30" W1-4
30" x 30" W1-4
17L 17R
R3-1 24" x 24"
R3-2 24" x 24"
13R 13L
23 ON
ROADWAY
36" x 36"
CW11-1
R9-11a 24" x 12"
SIDEWALK CLOSED
CROSS HERE
R9-9 24" x 12"
SIDEWALK
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
18C18A 18B
R9-10 24" x 12"
TEMPORARY TRAFFIC CONTROL SPACING TABLES
Table 1 Advance Sign Spacing Within Warning Area
Posted Speed Initial Sign Additional Signs 0-30 mph 100 feet 100 feet
35-40 mph 350 feet 350 feet 45-55 mph 500 feet 500 feet
Signs on portable supports shall be at least one foot above the roadway
Table 2 Taper Length, Number of Devices, and Device Spacing Table
Use 12 Ft lane width as default unless otherwise approved
Shift Taper = 1/2 L Shoulder Taper = 1/3 L
Speed
MPH
25 or below
Along Tangent
Along Taper
55 605550 660 11 12 13 110 495
550500 600 11 12 13 100 425 495450 540 11 12 13 90 360 295270 320 11 12 13 80 305 225205 245 8 9 9 70 250 165150 180 7 8 8 60 200 115105 125 6 6 6 50 155
10 10 11 1211 12 FT
Maximum Device Spacing in Feet
Buffer Spaces
Minimum Number of Devices Lane Width in Feet
Min. Merging Taper length (L) Lane Width (W) in Feet
W20-2 36" x 36"
R3-5 30" x 36"
16R
R3-5 30" x 36"
16L
R9-11a 24" x 12"
SIDEWALK CLOSED
CROSS HERE
R9-11 24" x 12"
SIDEWALK CLOSED
CROSS HERE
AHEAD18D 18E
60" x 30" OR11-4a
TO THRU TRAFFIC
ROAD CLOSED
LOCAL ACCESS ONLY
2.) CONTRACTOR TO PROVIDE A WRITTEN AND DRAWN PLAN FOR
APPROVAL THAT IDENTIFIES REQUIREMENTS FOR PROVIDING
SAFE, EFFECTIVE AND ACCESSIBLE ROUTES FOR PEDESTRIANS
THROUGH OR AROUND THE WORK ZONE PRIOR TO BEGINNING
WORK THAT IMPACTS PEDESTRIAN ROUTES.
13.) PLACE "STEEL PLATE AHEAD" SIGNAGE AS NEEDED FOR TEMPORARY
BYPASS PUMPING TRENCH, OR OTHER LOCATIONS AS NECESSARY.
48" x 24"
25R
48" x 24"
25L 26
36" x 36"
STEEL
PLATE
AHEAD
DETOUR
M4-9L 30" x 24"
27A DETOUR
M4-9R 30" x 24"
27B DETOUR
M4-9a 30" x 24"
27C
NO
PARKING
ANY
TIME
R7-1 12" x 18"
27D DETOUR
END
DETOUR
M4-8 24" x 12"
27E
M4-8a 24" x 18"
W1-6R W1-6L
R2-1 24" x 36"
29A
SPEED
LIMIT
25 R2-6aP 24" x 12"
FINES
DOUBLE29B 30
36" x 36"
WHITE LETTERS ON
BLUE BACKGROUND
BUSINESS
OPEN DURING
CONSTRUCTION
W20-4 36" x 36"
ONE LANE
ROAD
AHEAD
K-6443 36" x 36"
YIELD TO
ONCOMING
TRAFFIC STOP
R1-1 30" x 30"
W23-2 36" x 36"
NEW
TRAFFIC
PATTERN
AHEAD
48" x 48"
(SIGN FURNISHED BY CITY)
(FLAG KIT FURNISHED BY CONTRACTOR)
36 DO NOT
ENTER
R5-1 30" x 30"
W20-7 36" x 36"
5 FLAGGER
AHEAD
OW23-3
36" x 36"
BE
PREPARED
TO STOP
R4-7A 30" x 36"
KEEP
RIGHT
5.) PARKING PERMITS WILL NEED TO BE OBTAINED BY THE
CONTRACTOR FOR ANY PARKING REMOVAL FOR THIS WORK.
CONTACT PARKING SERVICES AT 503-587-2075 TO OBTAIN THESE
PERMITS. "NO PARKING" SIGNS TO BE PLACED 72 HRS IN
ADVANCE OF THE WORK WITH DATES AND TIME.
RIGHT ARROW
40R
R6-1
ONE WAY
48" x 24"
LEFT ARROW
40L
R6-1
ONE WAY
48" x 24"
R9-11 24" x 12"
SIDEWALK CLOSED
CROSS HERE
AHEAD18F
48" x 48"
(CUSTOM SIGN FURNISHED
BY CONTRACTOR)
DMV ENTRANCE
ENTER HERE
MAIN ENTRANCE
CLOSED AHEAD
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:5
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-T C
-0 1-
6.
dw g (T
C -0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
TC-02
TRAFFIC CONTROL
PLAN
ADVANCED SIGNING
& DETOUR ROUTES
0 100 200 400
FEET
ADVANCED SIGNING & DETOUR ROUTES
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
WORK ZONE
PORTABLE SIGN
POST MOUNTED SIGN
TRAFFIC CONTROL LEGEND
LANE CLOSURE
NOTES:
SEQUENTIAL ARROW BOARD
TYPE 2 BARRICADE
PCMS SIGN - SEE TC-06
SEE TC-01 FOR SIGN LEGEND
1. CONTRACTOR SHALL SUBMIT TRAFFIC
CONTROL PLAN TO CITY FOR APPROVAL PRIOR
TO CONSTRUCTION.
2. CONTRACTOR MUST MAINTAIN ONE TRAVEL
LANE, MINIMUM 11' WIDTH, IN EACH DIRECTION
ON SILVERTON RD AT ALL TIMES, EXCEPT FOR
DURING APPROVED NIGHT WORK WITH
FLAGGERS.
3. INSTALL TRAFFIC CONTROL SIGNING AS
SHOWN ON TC-01.
4. FLAGGING ON SILVERTON ROAD NE IS ONLY
ALLOWED BETWEEN 9:00 PM AND 6:00 AM.
5. NO FLAGGING ALLOWED ON SILVERTON RD NE
ON HOLIDAYS, WEEKENDS, OR DURING AN EVENT
EXCLUSION MORATORIUM.
6. PROVIDE ACCESS TO ALL BUSINESSES
DURING CONSTRUCTION. USE BLUE TUBULAR
MARKERS AND PROVIDE RAMP OVER BYPASS
PIPE. SEE BYPASS PLANS.
BYPASS PIPING
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:5
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-T C
-0 1-
6.
dw g (T
C -0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
TC-03
TRAFFIC CONTROL
PLAN
EVERGREEN AVE
0 30 60 120
FEET
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
WORK ZONE
PORTABLE SIGN
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
TRAFFIC CONTROL LEGEND
LANE CLOSURE
NOTES:
POST MOUNTED SIGN
TYPE 2 BARRICADE
SEQUENTIAL ARROW BOARD
SEE TC-01 FOR SIGN LEGEND
TRAFFIC FLOW DIRECTION
TEMPORARY ADA COMPLIANT RAMP
w/ RAILING
TYPICAL PEDESTRIAN & TRAFFIC ROUTING
AROUND SEWER LATERALS ON
EVERGREEN & LANA AVENUE
1. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO
CITY FOR APPROVAL PRIOR TO CONSTRUCTION.
2. NOT USED
3. INSTALL TRAFFIC CONTROL SIGNING AS SHOWN ON TC-01.
4. FLAGGING ON SILVERTON ROAD NE IS ONLY ALLOWED
BETWEEN 9:00 PM AND 6:00 AM.
5. NO FLAGGING ALLOWED ON SILVERTON RD NE ON
HOLIDAYS, WEEKENDS, OR DURING AN EVENT EXCLUSION
MORATORIUM.
6. PROVIDE ACCESS TO ALL BUSINESSES DURING
CONSTRUCTION. USE BLUE TUBULAR MARKERS AND PROVIDE
RAMP OVER BYPASS PIPE. SEE BYPASS PLANS.
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:5
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-T C
-0 1-
6.
dw g (T
C -0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
TC-04
TRAFFIC CONTROL
PLAN
LANA AVE
0 30 60 120
FEET
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
WORK ZONE
PORTABLE SIGN
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
LANE CLOSURE
NOTES:
SEQUENTIAL ARROW BOARD
POST MOUNTED SIGN
TYPE 2 BARRICADE
SEE TC-01 FOR SIGN LEGEND
TRAFFIC FLOW DIRECTION
TRAFFIC CONTROL LEGEND
TEMPORARY ADA COMPLIANT RAMP
w/ RAILING
1. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO
CITY FOR APPROVAL PRIOR TO CONSTRUCTION.
2. NOT USED
3. INSTALL TRAFFIC CONTROL SIGNING AS SHOWN ON TC-01.
4. FLAGGING ON SILVERTON ROAD NE IS ONLY ALLOWED
BETWEEN 9:00 PM AND 6:00 AM.
5. NO FLAGGING ALLOWED ON SILVERTON RD NE ON
HOLIDAYS, WEEKENDS, OR DURING AN EVENT EXCLUSION
MORATORIUM.
6. PROVIDE ACCESS TO ALL BUSINESSES DURING
CONSTRUCTION. USE BLUE TUBULAR MARKERS AND PROVIDE
RAMP OVER BYPASS PIPE. SEE BYPASS PLANS.
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:5
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-T C
-0 1-
6.
dw g (T
C -0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
TC-05
TRAFFIC CONTROL
PLAN
SILVERTON ROAD
0 30 60 120
FEET
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
WORK ZONE
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
LANE CLOSURE
NOTES:
1. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO
CITY FOR APPROVAL PRIOR TO CONSTRUCTION.
2. CONTRACTOR MUST MAINTAIN ONE TRAVEL LANE,
MINIMUM 11' WIDTH, IN EACH DIRECTION ON SILVERTON RD
AT ALL TIMES, EXCEPT FOR DURING APPROVED NIGHT WORK
WITH FLAGGERS.
3. INSTALL TRAFFIC CONTROL SIGNING AS SHOWN ON TC-01.
4. FLAGGING ON SILVERTON ROAD NE IS ONLY ALLOWED
BETWEEN 9:00 PM AND 6:00 AM.
5. NO FLAGGING ALLOWED ON SILVERTON RD NE ON
HOLIDAYS, WEEKENDS, OR DURING AN EVENT EXCLUSION
MORATORIUM.
6. PROVIDE ACCESS TO ALL BUSINESSES DURING
CONSTRUCTION. USE BLUE TUBULAR MARKERS AND PROVIDE
RAMP OVER BYPASS PIPE. SEE BYPASS PLANS.
PORTABLE SIGN
POST MOUNTED SIGN
TYPE 2 BARRICADE
SEQUENTIAL ARROW BOARD
SEE TC-01 FOR SIGN LEGEND
TRAFFIC FLOW DIRECTION
TRAFFIC CONTROL LEGEND
TEMPORARY ADA COMPLIANT RAMP
w/ RAILING
TYPICAL TRAFFIC ROUTING
FOR SEWER LATERAL WORK
ON NORTH SIDE OF SILVERTON RD
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:5
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-T C
-0 1-
6.
dw g (T
C -0 ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
TC-06
TRAFFIC CONTROL
PCMS PLAN
0 100 200 400
FEET
PCMS PLAN
LEGEND
PORTABLE CHANGEABLE MESSAGE SIGN(PCMS)
NOTES:
PORTABLE CHANGEABLE MESSAGE SIGN
(PCMS) INSTALLATION DETAIL
INSTALL PCMS BEYOND THE OUTSIDE SHOULDER,
WHEN POSSIBLE.
USE THE APPROPRIATE TYPE OF BARRICADE PANELS
FOR PCMS LOCATION.
RIGHT SHOULDER, USE TYPE B(III)R
LEFT SHOULDER, USE TYPE B(III)L
USE SIX DRUMS IN SHOULDER TAPER ON 20' SPACING.
SEE ODOT TM800 FOR ADDITIONAL REQUIREMENTS.
P
PCMS MESSAGES -SILVERTON RD
TIME PERIOD OF USE
7 DAYS PRIOR TO AND DURING CONSTRUCTION.
SILVERTON
RD NE
ROADWORK
LANE
CLOSURE
DATE-DATE
PANEL 1 PANEL 2
PORTABLE CHANGEABLE MESSAGE SIGN (PCMS)
MESSAGE NO. 1
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:0
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-S S-
-0
2.
dw g (S
S-ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
SS-01
SANITARY SEWER
PLAN
LANA AVE &
SILVERTON ROAD
STA 10+00 to 25+25
0 20 40 80
FEET
GENERAL NOTES
0 20 40 80
FEET
REHABILITATE MANHOLE WITH
CEMENTITIOUS LINING FOLLOWED BY
EPOXY COATING PER SPECIAL
PROVISIONS.
1 CONSTRUCT U.V. C.I.P.P. LINER
PER SIZE NOTED.
RECONSTRUCT LATERAL TO EXTENT SHOWN
ON PLANS VIA OPEN CUT
PER DTL D3, SHT SS-03.
SHEET KEYNOTES
SEWER LEGEND
1. CONTRACTOR SHALL FIELD VERIFY LINER LENGTH
PRIOR TO ORDERING MATERIAL.
2. CONTRACTOR SHALL PROVIDE ACCESS TO
BUSINESSES AND HOMEOWNERS AT ALL TIMES.
3. CONTRACTOR TO FIELD VERIFY LATERAL LOCATION
AND STATUS FOR ALL LATERALS ADJACENT TO
PROJECT PIPE PRIOR TO LINER INSTALLATION. ANY
ACTIVE LATERALS FOUND WHICH ARE NOT ALREADY
CALLED OUT TO BE RECONSTRUCTED OR REINSTATED
ON THE PLANS SHALL BE ASSESSED BY THE
CONTRACTOR AND RECONSTRUCTED OR REINSTATED,
AS DIRECTED BY THE ENGINEER. ANY LATERALS
WHICH ARE FOUND TO BE INACTIVE SHALL NOT BE
REINSTATED.
4. ALL NEW / RECONSTRUCTED SEWER LATERALS
CROSSING WATERLINES TO CROSS UNDER THE
WATERLINE WITH 18" VERTICAL CLEARANCE, MINIMUM,
PER OAR CHAPTER 333.
5. ALL LATERALS ASSUMED TO BE 4-INCHES UNLESS
OTHERWISE NOTED.
6. CONTRACTOR TO ACQUIRE PLUMBING PERMIT FOR
ALL PIPE-WORK ON PRIVATE PROPERTY.
7. CONTRACTOR TO MINIMIZE DISTURBED AREA
REQUIRING SURFACE RESTORATION FOR
RECONSTRUCTED LATERALS.
8. COORDINATION WITH SOME PROPERTIES MAY
REQUIRE BI-LINGUAL (SPANISH) SPEAKERS PROVIDED
BY CONTRACTOR.
9. LANDSCAPE RESTORATION TO BE PROVIDED PER
DTL 5, SHT SS-03 AND THE SPECIAL PROVISIONS.
RECONSTRUCT LATERAL TO BE CONNECTED
TO 8" CSP SS VIA PVC WYE COUPLED TO THE
EXISTING MAINLINE. ABANDON AND DO NOT
REINSTATE CONNECTION AT 36" MAINLINE.
RECONSTRUCT LATERAL
(OPEN CUT)
PER DTL D3, SHEET SS-03
REHABILITATE MANHOLE
NEW MAINLINE U.V. C.I.P.P. LINER
NEW LATERAL CLEANOUT
P CONTRACTOR TO PROTECT.
8 SUSPECTED ABANDONED LATERAL. SEE
GENERAL NOTE 3.
RECONSTRUCT CONCRETE PORTION OF
LATERAL AT THE MAIN (2-4 FT MIN, OPEN
CUT) PER DTL D3, SHEET SS-03.
11A NEW CLEANOUT TO BE INSTALLED IN
CENTER OF SIDEWALK
PER DTL D2, SHEET SS-03.
12 NEW CLEANOUT TO BE INSTALLED AT
BUILDING PER DTL D4, SHEET SS-03.
13 REINSTATE LATERAL WITH BRIM STYLE LINER
AT MAINLINE CONNECTION.
14 CONTRACTOR TO INSPECT 8" CSP SS IN
LANA AVE. FROM MH 8156 TO 8157
FOLLOWING COMPLETION OF NEW LATERAL
CONNECTIONS.
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:1
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-S S-
-0
2.
dw g (S
S-ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
SS-02
SANITARY SEWER
PLAN
EVERGREEN AVE
STA 25+25 to 31+28
0 20 40 80
FEET
GENERAL NOTES
REHABILITATE MANHOLE WITH
CEMENTITIOUS LINING FOLLOWED BY
EPOXY COATING PER SPECIAL
PROVISIONS.
SHEET KEYNOTES
SEWER LEGEND
RECONSTRUCT LATERAL
(OPEN CUT)
PER DTL D3, SHEET SS-03
REHABILITATE MANHOLE
NEW MAINLINE U.V. C.I.P.P. LINER
RECONSTRUCTED LATERAL CROSSES
EXISTING 24" STEEL WATERLINE. FULL STICK
OF DUCTILE IRON SERVICE PIPE TO BE
CENTERED ON WATERLINE. CROSSING OF
THIS 24" W/L REQUIRES A STANDBY WITH 48
HOURS NOTICE OF STANDBY. COORDINATE
WITH CITY SHOPS.
7 ABANDON EXISTING LATERAL.
DO NOT REINSTATE.
8 SUSPECTED ABANDONED LATERAL. SEE
GENERAL NOTE 3.
9 CONTRACTOR TO LOCATE LATERAL SERVING
3045-3049 EVERGREEN AVE, AND
RECONSTRUCT OR REINSTATE AS DIRECTED
BY ENGINEER.
10 RECONSTRUCT CONCRETE PORTION OF
LATERAL AT THE MAIN (2-4 FT MIN, OPEN
CUT) PER DTL D3, SHEET SS-03.
CONSTRUCT NEW LATERAL FROM MAINLINE
TO BUILDING AS SHOWN ON PLANS VIA OPEN
CUT PER DTL D3, SHEET SS-03. NEW
CLEANOUTS TO BE INSTALLED AT THE
BUILDING AND IN THE SIDEWALK.
NEW LATERAL CLEANOUT
3070 & 3080 EVERGREEN AVE
LATERAL DETAIL
1. CONTRACTOR SHALL FIELD VERIFY LINER LENGTH
PRIOR TO ORDERING MATERIAL.
2. CONTRACTOR SHALL PROVIDE ACCESS TO
BUSINESSES AND HOMEOWNERS AT ALL TIMES.
3. CONTRACTOR TO FIELD VERIFY LATERAL LOCATION
AND STATUS FOR ALL LATERALS ADJACENT TO
PROJECT PIPE PRIOR TO LINER INSTALLATION. ANY
ACTIVE LATERALS FOUND WHICH ARE NOT ALREADY
CALLED OUT TO BE RECONSTRUCTED OR REINSTATED
ON THE PLANS SHALL BE ASSESSED BY THE
CONTRACTOR AND RECONSTRUCTED OR REINSTATED,
AS DIRECTED BY THE ENGINEER. ANY LATERALS
WHICH ARE FOUND TO BE INACTIVE SHALL NOT BE
REINSTATED.
4. ALL NEW / RECONSTRUCTED SEWER LATERALS
CROSSING WATERLINES TO CROSS UNDER THE
WATERLINE WITH 18" VERTICAL CLEARANCE, MINIMUM,
PER OAR CHAPTER 333.
5. ALL LATERALS ASSUMED TO BE 4-INCHES UNLESS
OTHERWISE NOTED.
6. CONTRACTOR TO ACQUIRE PLUMBING PERMIT FOR
ALL PIPE-WORK ON PRIVATE PROPERTY.
7. CONTRACTOR TO MINIMIZE DISTURBED AREA
REQUIRING SURFACE RESTORATION FOR
RECONSTRUCTED LATERALS.
8. COORDINATION WITH SOME PROPERTIES MAY
REQUIRE BI-LINGUAL (SPANISH) SPEAKERS PROVIDED
BY CONTRACTOR.
9. LANDSCAPE RESTORATION TO BE PROVIDED PER
DTL 5, SHT SS-03 AND THE SPECIAL PROVISIONS.
1 CONSTRUCT U.V. C.I.P.P. LINER
PER SIZE NOTED.
RECONSTRUCT LATERAL TO EXTENT SHOWN
ON PLANS VIA OPEN CUT
PER DTL D3, SHT SS-03.
11A NEW CLEANOUT TO BE INSTALLED IN
CENTER OF SIDEWALK
PER DTL D2, SHEET SS-03.
12 NEW CLEANOUT TO BE INSTALLED AT
BUILDING PER DTL D4, SHEET SS-03.
11B NEW CLEANOUT TO BE INSTALLED BETWEEN
BACK OF WALK AND ROW
PER DTL D2, SHEET SS-03.
13 REINSTATE LATERAL WITH BRIM STYLE LINER
AT MAINLINE CONNECTION.
15 VACUUM-EXCAVATE TO INSTALL
RECONSTRUCTED LATERAL ON PRIVATE
PROPERTY AT 3175 EVERGREEN AVE.
P CONTRACTOR TO PROTECT.
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:1
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-S S-
D
ET
AI
LS
.d w g
(S S-ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
SS-03
DETAILS
NTS
CIPP END SEALD1
ASPHALT, CONCRETE AND
GRAVEL SURFACES
NTS
SERVICE LATERALD2 CLEANOUT & PERMANENT INSPECTION PORT BOX AND CAP NTS
SERVICE LATERALD3 CONNECTION FOR FUTURE SERVICE WITH SIDEWALK
NOTES:
1. PLUG SHALL BE
THREADED PVC
SCREW ON PLUG
WITH 2" NUT
NTS
SURFACE RESTORATIOND5 FOR RECONSTRUCTED LATERALNTS
SERVICE LATERALD4 CLEANOUT AT BUILDING
SURFACE RESTORATION TABLE
AT PROPERTY LINE
ON PRIVATE PROPERTY
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:3
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-S S-
-5
B
YP
AS
S.
dw g
(S S-ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
SS-04
CONCEPTUAL
BYPASS PUMPING
PLAN
SHEET KEYNOTES
GENERAL NOTES
0 40 80 160
FEET
1 DISCHARGE FLOWS INTO MH 8160.
TRAFFIC CONTROL REQ'D. MAINTAIN ONE LANE
OF TRAFFIC IN EACH DIRECTION ON LANA AVE.
1. THE BYPASS PLANS PROVIDE GUIDANCE FOR
CONSTRUCTION. ADDITIONAL BYPASS PUMPING MAY BE
REQUIRED BEYOND THESE PLANS. CONTRACTOR IS
REQUIRED TO SUBMIT BYPASS PLAN PRIOR TO
CONSTRUCTION FOR APPROVAL.
2. ACCESS TO ALL BUSINESS AND HOMES SHALL BE
MAINTAINED AT ALL TIMES.
3. FRANCHISE UTILITY LOCATIONS HAVE NOT BEEN FIELD
MARKED AND ARE NOT SHOWN ON THE PLANS. THE
CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED AND
MARKED AND SHALL PROTECT AS REQUIRED.
4. ROUTE TEMPORARY BYPASS TRENCH TO AVOID
ADA RAMPS. MAINTAIN ALL ADA CURB RAMPS DURING
CONSTRUCTION.
5. ALL PIPING SHALL BE WATERTIGHT AND INSPECTED
DAILY DURING OPERATIONS TO VERIFY THERE ARE NO
LEAKS IN THE CONTRACTOR BYPASS SYSTEM.
6. CONTRACTOR TO HAVE NECESSARY SPILL
CONTAINMENT MEASURES AVAILABLE ON SITE TO
MITIGATE ANY LEAKS.
7. CONTRACTOR TO MANAGE ALL LOCAL FLOWS (LATERALS
& COLLECTORS) IN ACCORDANCE WITH THE
SPECIFICATIONS.
8. WATER LEVEL AT THE UPSTREAM END OF EACH BYPASS
PIPE NOT TO EXCEED TWO THIRDS FULL FLOW DEPTH
(MEASURED AT BYPASS MANHOLE).
BYPASS
SETUP No.
1+2
WET WEATHER
PEAK
(MGD)
4 BYPASS PIPE IS TO BE PLACED BELOW GRADE IN
TEMPORARY TRENCH . RESTORE TRENCH PER
COS STD DWG No. 309 WITH ROCK BACKFILL.
COMBINE BYPASS FLOWS FROM SETUP #1 &
SETUP #2 AND CONSTRUCT A TEMPORARY
TRENCH AND COVER TO ROUTE THE BYPASS
PIPING BENEATH SILVERTON ROAD.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO OBTAIN ALL NECESSARY PERMITTING FROM
MARION COUNTY AND THE CITY FOR EXCAVATION
AND TRAFFIC CONTROL.
2 UTILIZE RAMPS TO MAINTAIN ACCESS TO
DRIVEWAYS & SIDEWALK.
3 ROUTE BYPASS PIPING ABOVE GROUND, NORTH
OF SIDEWALK AND BUS STOP, WITHIN R.O.W. OR
PROPOSED TEMPORARY CONSTRUCTION
EASEMENT.
5 ROUTE BYPASS PIPING ABOVE GROUND, ALONG
SOUTH GUTTER OF SILVERTON ROAD.
6 ROAD CLOSURES REQ'D AT PARK AVE. AND
EVERGREEN AVE.
7 BYPASS SETUP #2
UTILIZE EXTG MH 13495 OR EXCAVATE PIT FOR
BYPASSING. TRAFFIC CONTROL REQ'D TO
ACCESS MH. AT LEAST ONE LANE IN EACH
DIRECTION MUST BE MAINTAINED AT ALL TIMES
ON SILVERTON RD.
8 OPEN CUT EXCAVATION. EXTG UTILITY
CROSSINGS INCLUDE GAS, WATER, & SS.
CONTRACTOR TO PROTECT ALL UTILITIES.
PROPOSED BYPASS PIPING - ABOVE GROUND
PROPOSED BYPASS PIPING - TEMPORARY TRENCH
PROJECT PIPE REHABILITATION
10 BYPASS PIPING TO CROSS SIDEWALK AND RUN
ALONG NORTH GUTTER OF LANA AVE.
0 10 20 40
FEET
INSET PLAN
BYPASS SETUP #1
UTILIZE EXTG MH 8167 OR EXCAVATE PIT FOR
BYPASSING. TRAFFIC CONTROL REQ'D TO
ACCESS MH.
RUN BYPASS PIPING VIA THE PROPOSED
TEMPORARY CONSTRUCTION EASEMENT ON THE
NORTH EDGE OF 2700 BLOCK EVERGREEN AVE
NE, AND ON THE EAST EDGE OF THE OREGON
STATE FAIRGROUNDS.
ESTIMATED FLOWS
DIURNAL PEAK
DRY WEATHER
(MGD)
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
1 DISCHARGE FLOWS INTO MH 8160.
TRAFFIC CONTROL REQ'D. MAINTAIN ONE LANE
OF TRAFFIC IN EACH DIRECTION ON LANA AVE.
1. THE BYPASS PLANS PROVIDE GUIDANCE FOR
CONSTRUCTION. ADDITIONAL BYPASS PUMPING MAY BE
REQUIRED BEYOND THESE PLANS. CONTRACTOR IS
REQUIRED TO SUBMIT BYPASS PLAN PRIOR TO
CONSTRUCTION FOR APPROVAL.
2. ACCESS TO ALL BUSINESS AND HOMES SHALL BE
MAINTAINED AT ALL TIMES.
3. FRANCHISE UTILITY LOCATIONS HAVE NOT BEEN FIELD
MARKED AND ARE NOT SHOWN ON THE PLANS. THE
CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED AND
MARKED AND SHALL PROTECT AS REQUIRED.
4. ROUTE TEMPORARY BYPASS TRENCH TO AVOID
ADA RAMPS. MAINTAIN ALL ADA CURB RAMPS DURING
CONSTRUCTION.
5. ALL PIPING SHALL BE WATERTIGHT AND INSPECTED
DAILY DURING OPERATIONS TO VERIFY THERE ARE NO
LEAKS IN THE CONTRACTOR BYPASS SYSTEM.
6. CONTRACTOR TO HAVE NECESSARY SPILL
CONTAINMENT MEASURES AVAILABLE ON SITE TO
MITIGATE ANY LEAKS.
7. CONTRACTOR TO MANAGE ALL LOCAL FLOWS (LATERALS
& COLLECTORS) IN ACCORDANCE WITH THE
SPECIFICATIONS.
8. WATER LEVEL AT THE UPSTREAM END OF EACH BYPASS
PIPE NOT TO EXCEED TWO THIRDS FULL FLOW DEPTH
(MEASURED AT BYPASS MANHOLE).
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:3
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-S S-
-5
B
YP
AS
S.
dw g
(S S-ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
SS-05
CONCEPTUAL
BYPASS PUMPING
PLAN
SHEET KEYNOTES
GENERAL NOTES
0 40 80 160
FEET
4 BYPASS PIPE IS TO BE PLACED BELOW GRADE IN
TEMPORARY TRENCH . RESTORE TRENCH PER
DTL D3 ON SHEET SS-06.
COMBINE BYPASS FLOWS FROM SETUP #1 &
SETUP #2 AND CONSTRUCT A TEMPORARY
TRENCH AND COVER TO ROUTE THE BYPASS
PIPING BENEATH SILVERTON ROAD.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO OBTAIN ALL NECESSARY PERMITTING FROM
MARION COUNTY AND THE CITY FOR EXCAVATION
AND TRAFFIC CONTROL.
2 UTILIZE RAMPS TO MAINTAIN ACCESS TO
DRIVEWAYS & SIDEWALK.
3 ROUTE BYPASS PIPING ABOVE GROUND, NORTH
OF SIDEWALK AND BUS STOP, WITHIN R.O.W. OR
PROPOSED TEMPORARY CONSTRUCTION
EASEMENT.
5 ROUTE BYPASS PIPING ABOVE GROUND, ALONG
SOUTH GUTTER OF SILVERTON ROAD.
6 ROAD CLOSURES REQ'D AT PARK AVE. AND
EVERGREEN AVE.
7 BYPASS SETUP #2
UTILIZE EXTG MH 13495 OR EXCAVATE PIT FOR
BYPASSING. TRAFFIC CONTROL REQ'D TO
ACCESS MH. AT LEAST ONE LANE IN EACH
DIRECTION MUST BE MAINTAINED AT ALL TIMES
ON SILVERTON RD.
8 OPEN CUT EXCAVATION. EXTG UTILITY
CROSSINGS INCLUDE GAS, WATER, & SS.
CONTRACTOR TO PROTECT ALL UTILITIES.
9 BYPASS SETUP #1
UTILIZE EXTG MH 8167 OR EXCAVATE PIT FOR
BYPASSING. TRAFFIC CONTROL REQ'D TO
ACCESS MH.
RUN BYPASS PIPING VIA THE PROPOSED
TEMPORARY CONSTRUCTION EASEMENT ON THE
NORTH EDGE OF 2700 BLOCK EVERGREEN AVE
NE, AND ON THE EAST EDGE OF THE OREGON
STATE FAIRGROUNDS.
10 BYPASS PIPING TO CROSS SIDEWALK AND RUN
ALONG NORTH GUTTER OF LANA AVE.
BYPASS
SETUP No.
1+2
WET WEATHER
PEAK
(MGD)
PROPOSED BYPASS PIPING - ABOVE GROUND
PROPOSED BYPASS PIPING - TEMPORARY TRENCH
PROJECT PIPE REHABILITATION
ESTIMATED FLOWS
DIURNAL PEAK
DRY WEATHER
(MGD)
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
SILVERTON ROAD
SANITARY SEWER
REHABILITATION
/1
7/
1:
:4
AM
R
:\D w g\ Sa le m
C ity o f\S ilv er to n
R oa d Se w er
R eh ab
2.
.0 \C iv il\
Pl ot s\
-S S-
B
YP
AS
S D
ET
AI
LS
.d w g
(S S-ta b)
CERTIFICATE EXPIRES: JUNE 30, 2024
DATE SIGNED: DEC 17, 2024
WE J.O. 2272.2190.0
PN: 723106
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
JW
TMT
DIGITALLY SIGNED
SS-06
BYPASS NOTES &
DETAILS
STEEL PLATE
MAX TRENCH WIDTH MIN PLATE THICKNESS
10" 1/2"
1'-11" 3/4"
2'-7" 7/8"
3'-5" 1"
5'-3" 1-1/4"
NTS
TEMPORARY BYPASS PUMPING PIPE TRENCHD2
NTS
BYPASS PIPING DRIVEWAY ACCESSD1
| Sheets and Views |
| 1-G-01-5 TITLE-G-01 |
| 1-G-01-5 TITLE-G-02 |
| 1-G-01-5 TITLE-G-03 |
| 1-G-01-5 TITLE-G-04 |
| 1-G-01-5 TITLE-G-05 |
| 6-EC-01-5-EC-01 |
| 6-EC-01-5-EC-02 |
| 6-EC-01-5-EC-03 |
| 6-EC-01-5-EC-04 |
| 6-EC-01-5-EC-05 |
| 11-TC-01-6-TC-01 |
| 11-TC-01-6-TC-02 |
| 11-TC-01-6-TC-03 |
| 11-TC-01-6-TC-04 |
| 11-TC-01-6-TC-05 |
| 11-TC-01-6-TC-06 |
| 17-SS-01-02-SS-01 |
| 17-SS-01-02-SS-02 |
| 19-SS-03 DETAILS-SS-03 |
| 20-SS-04-5 BYPASS-SS-04 |
| 20-SS-04-5 BYPASS-SS-05 |
| 22-SS-06 BYPASS DETAILS-SS-06 |
| 2024-12-23T13:27:24-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:28-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:32-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:36-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:40-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:44-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:49-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:52-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:27:56-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:00-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:03-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:07-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:11-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:15-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:19-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:22-0800 | |
| Andrew A. Tweet |
| 2024-12-23T13:28:26-0800 | |
| Andrew A. Tweet |
This is the start of the file's text. The full file is on GovTribe.