About this file

This is a Project Manual for a construction project involving the Florida Department of Transportation (FDOT) District 7. The project concerns the reconstruction and improvement of State Road 826 (Palmetto Expressway) in Miami-Dade County, specifically addressing pavement rehabilitation, drainage improvements, and safety enhancements across multiple segments totaling approximately 8.5 miles. The project includes the installation of new traffic control systems, bridge repairs, and environmental mitigation measures. The manual establishes technical specifications, construction standards, and performance requirements that contractors must follow throughout project execution. The document serves as the primary reference for all parties involved in the design and construction process, detailing the scope of work, material specifications, and quality assurance protocols required to meet FDOT standards and applicable federal regulations.

The Project Manual establishes the contractual framework and technical requirements that will govern contractor performance and project delivery. Key specifications address pavement design standards, concrete and asphalt material requirements, drainage system installation protocols, and traffic management procedures during construction. The document incorporates FDOT Standard Specifications and references applicable Florida Statutes and federal guidelines including those from the Federal Highway Administration (FHWA). Funding for this project is derived from state transportation revenue and federal highway trust funds allocated to District 7. The manual outlines quality control mechanisms, inspection procedures, and acceptance criteria for completed work, with particular emphasis on maintaining traffic flow and public safety throughout the construction period. Documentation requirements, as-built drawing procedures, and final project closeout protocols are detailed to ensure comprehensive record-keeping and compliance verification upon project completion.

View the file

Other files

File Type Posted
722408-Bailey Ridge Plans-Signed.pdf PDF
722408-Bid_Register_Rank.pdf PDF
Zoom Teams Link for Bid Opening.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .