Attachmen J-9 Smart Grid STEG Maturity Model January2022.pdf
PDF 9 MB Posted
- Attached to
- Power Tunisia
- Solicitation number
- 72066422R00001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANALYTICAL ANALYSIS
SMART GRID DOMAINS MATURITY
December 2021 ii
ACRONYMS AND DEFINITIONS
AS IS Existing Maturity of "Smart Grid" domains
Characteristic Defines the capabilities or attributes of an organization associated with Smart Grid domains
Expected characteristic
Capabilities and characteristics that an organization must implement or exhibit to achieve the corresponding maturity level within a domain.
Informative characteristics Provide additional descriptive material that may provide some insight
EMEA Europe, Middle East, Africa
EnR Renewable Energies
LoB Line of Business
Maturity Levels Represent defined stages, described in terms of organizational capabilities and characteristics, of an organization’s progress toward achieving its smart grid vision
N1 Level 1 = Initiating
N2 Level 2 = Enabling
N3 Level 3 = Integrating
N4 Level 4 = Optimizing
N5 Level 5 = Pioneering
DMT Direction de Maitrise de la Technologie, STEG
Domains A domain is a logical grouping of smart-grid-related capabilities and characteristics.
SMR Strategy, Management and Regulation
OS Organization and Structure
GO Grid Operations
WAM Workforce and Asset Management
TECH Technology
CUST Customer
VCI Value Chain Integration
SE Society and Environment
SEI Software Engineering Institute of Carnegie Mellon University
SGMM Smart Grid Maturity Model
STEG Tunisian Electricity and Gas Company iii
Terme Français Anglais
AS IS Etat des lieux représentant la Maturité existante des domaines « Smart Grid »
Baseline Assessment representing existing maturity level across SGMM domains
N1 Initiation Initiating
N2 Activation Enabling
N3 Intégration Integrating
N4 Optimisation Optimizing
N5 Pionnier Pioneering
SGMM Modèle de Maturité « Smart Grid » Smart Grid Maturity Model
SMR Stratégie, Gestion et Réglementation Strategy, Management and Regulatory
OS Organisation et Structure Organization and Structure
GO Exploitation du Réseau Grid Operations
WAM Gestion des Actifs et des Effectifs Work and Asset Management
TECH Technologie Technology
CUST Clientèle Customer
VCI Intégration dans la Chaine de Valeur Value Chain Integration
SE Société et Environnement Societal and Environmental iv
TABLE OF CONTENT
1 INTRODUCTION - SMART GRID MATURITY MODEL “SGMM”
2 CONTEXT AND PURPOSE – BASELINE ASSESSMENT
3 METHODOLOGY AND ORGANIZATION
3.1 METHODOLOGY
3.2 ORGANIZATION
4 PROJECT TASKFORCE
5 PRESENTATION OF SMART GRID MATURITY
5.1 GENERAL INFORMATION
5.2 SUMMARY OF ANSWERS
5.3 MATURITY DASHBOARD
5.4 MATURITY PROFILE
5.5 CONCLUSION
APPENDIX 1 OVERVIEW OF METHODOLOGY
APPENDIX 2 SUMMARY OF KEY INFORMATION
APPENDIX 3 SCORES PER LEVEL
APPENDIX 4 SCOREBOARD BY DOMAIN
FIGURE 1 DESCRIPTION OF MATURITY LEVELS
FIGURE 2 DISTRIBUTION BY REGION (SEGMENT 2)
FIGURE 3 DISTRIBUTION OF ANSWERS BY INDUSTRY/TRADE SEGMENT (THE ENTIRE "SGMM"
COMMUNITY)
FIGURE 4 DISTRIBUTION OF ANSWERS BY INDUSTRY/TRADE SEGMENT (SEGMENT 2)
1 INTRODUCTION - SMART GRID MATURITY MODEL
“SGMM”
The Smart Grid Maturity Model (SGMM) is a management tool developed by electric utilities for electric utilities. The model provides a framework for understanding the current state of smart grid deployment and capability within an electric utility, and it provides a context for establishing future strategies and work plans to meet the challenges of grid modernization. It can also help organizations to bridge gaps between strategy and execution.
The SGMM helps create and communicate a common vision of the smart grid for internal and external stakeholders. An electric utility can use the SGMM to identify its smart grid target, assess where it is on the journey to implementing the smart grid, prioritize options, and measure success.
The "SGMM" makes it possible to create and communicate a common vision internally of the electricity company and to the various external stakeholders involved in the process.
The "SGMM" also makes it possible to:
- Establish a common vision for the roadmap towards the "Smart Grid".
- Evaluate the investment objectives and "Smart Grid" guidelines.
- Evaluate and prioritize opportunities and "Smart Grid" projects.
- Benchmark against the achievements and experiences of the "SGMM" community.
- Measure the progress of the strategy with qualitative and quantitative indicators.
- Evaluate the level of "Readiness" to adopt the "Smart Grid" in terms of resources available, infrastructure, strategic thinking, financial viability, impact and development.
Under "Smart Grid Tunisia" , "SGMM" is being used to identify the maturity level of STEG with regards to smart grid technology deployment and strategy development across:
Eight (8) domains
- Business domains
- Grid operations (GO)
- Workforce and Asset Management (WAM)
- Customer (CUST)
- Value Chain Integration (UCI)
- Domains related to technology and human resources
- Strategy, Management and Regulatory (SMR)
- Organization and Structure (OS)
- Technology (TECH)
- Society and Environment (SE)
And five (5) maturity levels
- Level 1: Initiating
- Level 2: Enabling
- Level 3: Integrating
- Level 4: Optimizing
- Level 5: Innovating
The "SGMM is developed to support utilities in defining a technical, organizational, and operational roadmap through a well-thought-out navigation process.
Figure 1 Description of maturity levels
• Complete automation of operations transformation
(functional and business) information (Cross
LOB)
2 CONTEXT AND PURPOSE – BASELINE ASSESSMENT
The Baseline assessment is an essential step to determine the maturity level associated to Smart Grid domains of the utility’s maturity levels. This analysis is based on a global context defined by the objectives of STEG's "Smart Grid" strategy:
- Improve the billing system and the provision of service to the end customer
- Reduce technical and non-technical losses and improve collection
- Optimize the load curve and the balance between production and demand
- Integration of renewable energy facilitated and made reliable
STEG has a roadmap to define the different technologies to be deployed through the different operations management systems; Thus, the AS-IS analysis will enable to measure the degree of progress of strategy objectives and to establish a baseline.
The AS-IS Analysis report provides a general view of “SGMM” domains and Maturity baseline assessment of the eight (8) domains.
STEG has defined and ranked the following ambitions driving their Smart Grid strategy (ranked from most important to least important):
• Customer participation
• Electrification (expanding access to power)
• Enabling new business opportunities
• Energy affordability
• Energy independence
• General environmental improvement objectives
• Improving financial performance
• Improving operational efficiency
• Improving reliability (including outage recovery improvements)
• Improving safety
• Improving security
• Integration of new energy sources and/or storage
• Macro-economic objectives (e.g., job creation, economic development)
• Peak demand reduction
• Reducing theft and/or other losses
3 METHODOLOGY AND ORGANIZATION
3.1 METHODOLOGY
this activity is designed based on a 5-step methodology:
1- Preparation: stakeholder mapping, designation of taskforce and preparation of activity plan
2- Kick-off: Organize introductory workshops and presentation of questionnaires
3- Shadowing support STEG teams, provide clarifications, address questions and requests, framing, contextualizing, etc.
4- Analysis: Consolidation of questionnaires responses and analysis
5- Synthesis: Synthesis of outcomes and presentation of results
The methodology is detailed in Appendix 1.
3.2 ORGANIZATION
The Maturity baseline assessment using “SGMM” consists of two key streams
- STREAM 1 – Capacity reinforcement
- STREAM 2 – Technical assistance and subject matter advisory
STREAM 1
The purpose of stream 1 is to define a capacity building program for STEG teams with a "learning by doing" approach and facilitate the dialogue between different departments.
In this context, "Smart Grid Tunisia" organized three (3) workshops to develop the capabilities of STEG teams to understand and utilize "SGMM" framework as well as “SGMM” product suite.
Workshop Date Number of hours Number of STEG participants
INTRODUCTION TO SMART GRID
MATURITY MODEL « SGMM »
15/06/2021 2 hours 21
PRESENTATION OF SGMM
PRODUCT SUITE
13/07/2021 4 hours 28
OVERVIEW OF
SCORING METHODOLOGY
02/09/2021 5 hours 26
The interactive nature of the workshops created a constructive and collaborative framework between different departments and enabled information sharing and knowledge transfer between participants, this also helped identify and pinpoint challenges encountered during the implementation of different projects and coordination shortcomings.
STREAM 2
Technical assistance consisted of contextualizing SGMM framework and product suite and adapt it to
STEG context. The latter enabled better understanding and acceptance from STEG and a realignment of expectations with regards to the results and findings expected from SGMM as a tool utilized by many utilities and how can SGMM supports the design and roadmapping of Smart Grid strategies and projets in the context of STEG and Tunisia.
During an intensive two weeks of works and consultations between members of the Taskforce, an exhaustive set of questions (177 questions) were debated and discussed in a collaborative approach to define the current situation of Smart Grid domains from an organizational, availability of ressources and management standpoint.
During the different sessions, the project team provided extensive support and managed the consolidation process to build the baseline Maturity assessment for eight (8) domains.
4 PROJECT TASKFORCE
STEG has mobilized a rounded taskforce from different departments to support the baseline assessment for Smart Grid Maturity.
Name Direction Email address
Nejib Sayari DMT (Director) nsayari@steg.com.tn
Taoufik Tissaoui DMT/DEAE ttissaoui@steg.com.tn
Radhouane Dakhli DMT/ Grid of the future rdakhli@steg.com.tn
Karim Trad DMT\Smart Grid ktrad@steg.com.tn
Mahran Khalfoun DMT\Smart Grid mkhalfoun@steg.com.tn
Imen Ben Salem DMT\Smart Grid iaidoudi@steg.com.tn
Lobna Jouirou DMT\Smart Grid ljouirou@steg.com.tn
Nesrine Mekki DMT\Smart Grid nmakki@steg.com.tn
Mohamed Amouri DMT\Smart Grid mhamouri@steg.com.tn
Abir Ayachi DCDI aayachi@steg.com.tn
Ines Taieb DCDI itaieb@steg.com.tn
Mohamed Barboura DCDI mbarboura@steg.com.tn
Mohamed Rafraf DCOSI mhrafraf@steg.com.tn
Khaled Zaibi DCOSI kzaibi@steg.com.tn
Mohamed Amine Aguir DCOSI maaguir@steg.com.tn
Habib Marsaoui DCRH hmarsaoui@steg.com.tn
Hend Ennaifer DCDI\DCM hennaifer@steg.com.tn
Ilhem Abderrahim DCDI\DCM iabderrahim@steg.com.tn
Nabil Mrad DCDI\DCM nmrad@steg.com.tn
Naouel Mrabet DCDI\DCM nmrabet@steg.com.tn
Mounir Houidhek DCDI\DCM mhouidhek@steg.com.tn
Zouheir Ghanmi DCDI\DCM zghanmi@steg.com.tn
Chawki Bahrini DCIT\ Cybersecurity cbahrini@steg.com.tn mailto:nsayari@steg.com.tn mailto:ttissaoui@steg.com.tn mailto:rdakhli@steg.com.tn mailto:ktrad@steg.com.tn mailto:mkhalfoun@steg.com.tn mailto:iaidoudi@steg.com.tn mailto:ljouirou@steg.com.tn mailto:nmakki@steg.com.tn http://4de9653a01d37ec66378739a315ebb0cbbb8ddad/mailto%3Amhamouri%40steg.com.tn%2520 mailto:aayachi@steg.com.tn mailto:itaieb@steg.com.tn mailto:mbarboura@steg.com.tn mailto:mhrafraf@steg.com.tn mailto:kzaibi@steg.com.tn mailto:maaguir@steg.com.tn mailto:hmarsaoui@steg.com.tn mailto:hennaifer@steg.com.tn mailto:iabderrahim@steg.com.tn mailto:nmrad@steg.com.tn mailto:nmrabet@steg.com.tn mailto:mhouidhek@steg.com.tn mailto:zghanmi@steg.com.tn mailto:cbahrini@steg.com.tn
Amani Mansour DCIT\ Cybersecurity ammansour@steg.com.tn
Haifa Gmati DCRTE hgmati@steg.com.tn
Ahmed El Beji DCRTE aelbeji@steg.com.tn
Mounira Msaddek DCSP mmsaddek@steg.com.tn
Wiem Ben Hadj Yahia DCSP wbenhadjyahia@steg.com.tn
Asma Zaidi DCSP azaidi@steg.com.tn
Afef Bennour DSE abennour@steg.com.tn
Meriem Bessibes DSE mbessibes@steg.com.tn mailto:ammansour@steg.com.tn mailto:hgmati@steg.com.tn mailto:aelbeji@steg.com.tn mailto:mmsaddek@steg.com.tn mailto:wbenhadjyahia@steg.com.tn mailto:azaidi@steg.com.tn mailto:abennour@steg.com.tn mailto:mbessibes@steg.com.tn
5 PRESENTATION OF SMART GRID MATURITY
5.1 GENERAL INFORMATION
US utilities represent 30% of SGMM results database; In recent years, Utilities in Asia have become more aware and The participation of American utilities remains dominant and in recent years utilities in Asia are beginning to be aware of the importance of a transversal evaluation conducted through the use of the
“SGMM” process.
Figure 2 Distribution by Region (Segment 2)
Figure 3 Distribution of answers by industry/trade segment (the entire "SGMM" community)
19%
30%32%
19%
EMEA US ASIE AUTRES
55%
1%
12%
6%
6%
6%
9%
5%
4%
6%
17%
0% 20% 40% 60% 80% 100%
Distribution
Commercialisation
Distribution, commercialisation
Transport
Transport, Distribution
Transport, Distribution, commercialisation
Production, Transport, Distribution
Production, Distribution
Production, Distribution, commercialisation
Production, Transport
Production, Transport, Distribution,…
In d u st ry S e gm e n t (b u si n e ss
Figure 4 Distribution of answers by industry/trade segment (Segment 2)
39%
17%
3%
3%
1%
15%
12%
5%
20%
45%
0% 20% 40% 60% 80% 100%
Production, Transport, Distribution,…
Production, Distribution, commercialisation
Production, Transport
Production, Distribution
Production, Transport, Distribution
Transport, Distribution, commercialisation
Transport, Distribution
Transport
Distribution, commercialisation
Distribution In d u st ry
S e gm e n t
(b u si n e ss
5.2 SUMMARY OF ANSWERS
The selection of responses is based on a participatory and collaborative approach, involving key departments from STEG.
The below list presents the summary of confirmed selected responses according to “SGMM” guidelines.
SMR-1.1 C SMR-2.1 B SMR-3.1 C SMR-4.1 A SMR-5.1 A
SMR-1.2 C SMR-2.2 B SMR-3.2 A SMR-4.2 B SMR-5.2 A
SMR-1.3 C SMR-2.3 B SMR-3.3 A SMR-4.3 A SMR-5.3 A
SMR-2.4 B SMR-3.4 B
SMR-2.5 D
SMR-2.6 B
OS-1.1 B OS-2.1 C OS-3.1 D OS-4.1 A OS-5.1 B
OS-1.2 A OS-2.2 A OS-3.2 A OS-4.2 A OS-5.2 A
OS-1.3 C OS-2.3 D OS-3.3 A OS-4.3 A OS-5.3 A
OS-2.4 C OS-3.4 A
OS-2.5 A OS-3.5 B
OS-3.6 B
GO-1.1 D GO-2.1 E GO-3.1 A GO-4.1 A GO-5.1 A
GO-1.2 D GO-2.2 B GO-3.2 A GO-4.2 A GO-5.2 A
GO-1.3 C GO-2.3 A GO-3.3 A GO-4.3 A
GO-1.4 C GO-2.4 D GO-3.4 A GO-4.4 A
GO-1.5 B GO-3.5 B GO-4.5 A
GO-3.6 A
WAM-1.1 B WAM-2.1 C WAM-3.1 B WAM-4.1 A WAM-5.1 A
WAM-1.2 B WAM-2.2 B WAM-3.2 B WAM-4.2 A WAM-5.2 A
WAM-1.3 A WAM-2.3 A WAM-3.3 B WAM-4.3 A
WAM-3.4 A WAM-4.4 A
WAM-3.5 B
WAM-3.6 A
WAM-3.7 A
WAM-1 WAM-2 WAM-3 WAM-4 WAM-5
WAM
GO-1 GO-2 GO-3 GO-4 GO-5
GO
OS
OS-1 OS-2 OS-3 OS-4 OS-5
SMR
SMR-1 SMR-2 SMR-3 SMR-4 SMR-5
TECH-1.1 D TECH-2.1 C TECH-3.1 B TECH-4.1 A TECH-5.1 A
TECH-1.2 C TECH-2.2 B TECH-3.2 A TECH-4.2 A TECH-5.2 B
TECH-1.3 C TECH-2.3 C TECH-3.3 A TECH-4.3 A
TECH-1.4 B TECH-2.4 D TECH-3.4 A TECH-4.4 A
TECH-1.5 C TECH-2.5 A TECH-3.5 A TECH-4.5 A
TECH-2.6 E TECH-3.6 D TECH-4.6 A
TECH-2.7 E
CUST-1.1 B CUST-2.1 D CUST-3.1 D CUST-4.1 B CUST-5.1 A
CUST-1.2 A CUST-2.2 B CUST-3.2 A CUST-4.2 A CUST-5.2 A
CUST-1.3 C CUST-2.3 B CUST-3.3 A CUST-4.3 B CUST-5.3 A
CUST-1.4 B CUST-2.4 D CUST-3.4 A CUST-4.4 A CUST-5.4 A
CUST-2.5 B CUST-3.5 B CUST-4.5 A CUST-5.5 A
CUST-2.6 B CUST-3.6 A CUST-4.6 B
CUST-3.7 D CUST-4.7 B
CUST-3.8 A
CUST-3.9 C
VCI-1.1 B VCI-2.1 B VCI-3.1 A VCI-4.1 A VCI-5.1 A
VCI-1.2 A VCI-2.2 A VCI-3.2 A VCI-4.2 A VCI-5.2 A
VCI-1.3 C VCI-2.3 A VCI-3.3 B VCI-4.3 A VCI-5.3 A
VCI-1.4 B VCI-2.4 A VCI-3.4 A VCI-4.4 A
VCI-1.5 A
SE-1.1 C SE-2.1 B SE-3.1 B SE-4.1 C SE-5.1 C
SE-1.2 C SE-2.2 E SE-3.2 A SE-4.2 A SE-5.2 A
SE-1.3 B SE-2.3 D SE-3.3 B SE-4.3 B SE-5.3 B
SE-1.4 B SE-2.4 A SE-3.4 A SE-4.4 A
SE-2.5 B SE-4.5 B
SE
SE-1 SE-2 SE-3 SE-4 SE-5
VCI
VCI-1 VCI-2 VCI-3 VCI-4 VCI-5
CUST-2 CUST-3 CUST-4 CUST-5
TECH-4 TECH-5
CUST
CUST-1
TECH
TECH-1 TECH-2 TECH-3
For level 1, B and C are predominantly the most selected answers which indicates a rather promising progress for the corresponding characteristics. (i.e., SMR-1.2 Experimental implementations of smart grid concepts are supported)
For level 2, A and B are predominantly the most selected answers which indicates a initiation effort for the corresponding characteristics. (i.e., TECH-2.2 Changes to the enterprise IT architecture that enable smart grid are being deployed)
For level 3, A is predominantly the most selected answers which indicates that no effort was initiated for the corresponding characteristics. (i.e., CUST-3.2 Two-way meter communication has been deployed for a significant number of customers.)
23% 38%
13% 18% 10%
0%
20%
40%
60%
80%
100%
A B C D E
Level 2 - Enabling
16% 34% 41%
9% 0%
0%
20%
40%
60%
80%
100%
A B C D E
Level I - Initiation
59%
28%
4% 9% 0%
0%
20%
40%
60%
80%
100%
A B C D E
Level 3 - Integration
For level 4, A is predominantly the most selected answers which indicates that no effort was initiated for the corresponding characteristics. (i.e., VCI-4.2 The organization has implemented portfolio optimization models that encompass available resources and real-time markets)
For level 5, A is predominantly the most selected answers which indicates that no effort was initiated for the corresponding characteristics. (i.e., SMR-5.1 Smart grid strategy capitalizes on smart grid as a foundation for the introduction of new services and product offerings)
The responses profile indicates that the Maturity level fluctuates between Level 1 and
Level 2 for most domains.
78%
19% 3% 0% 0%
0%
20%
40%
60%
80%
100%
A B C D E
Level 4 - Optimizing
83%
13% 4% 0% 0%
0%
20%
40%
60%
80%
100%
A B C D E
Level 5 - Pioneering
5.3 MATURITY DASHBOARD
The Maturity Dashboard provides an overview of maturity level and corresponding scoring for the eight (8) domains; to reach the level of maturity, 70% of the characteristics in that level must be satisfied (green color).
The STEG Maturity Dashboard indicates that SMR and GO domains are at Level 1 and remaining domains (OS/WAM/TECH/CUST/VCI/SE) are still at Level 0.
Overall, Maturity is below average compared to results from SGMM community and the same segment, Nevertheless, initiatives to move to a higher maturity levels are being put in place for several domains indicating a significant commitment from STEG.
Note: Details of scoring by level and by domain are listed in Appendices 3 and 4.
Satisfied level = required characteristics met
Significant progress is measured
Initial efforts initiated
No effort is initiated
5.4 MATURITY PROFILE
STEG maturity is considered below the average maturity compared to SGMM community and the same segment.
It is strongly recommended to maintain a certain consistency between maturity levels for the eight (8) domains.
Results presented below are a comparison between STEG maturity (in green) and community (in blue) / segment (in orange) maturity respectively.
5.5 CONCLUSION
“SGMM” provides a comprehensive set of tools, insights, and a clear process to build a well-rounded analysis of domains directly correlated with Smart Grid transformation, these domains span technical, functional and domains related to workforce development and stakeholder engagement.
Smart Grid Tunisia developed a simple 5-steps methodology to streamline the understanding and use of SGMM to build the baseline assessment for Smart Grid Maturity for the corresponding domains.
The Maturity profile presents a comprehensive analysis of changes required to streamline the adoption and deployment of Smart Grid technologies and the expectations set forth to put in place the resources, teams and coordination tools to achieve the objectives and results expected.
Finally, the Maturity baseline assessment consists a building block to determine the aspirations and ambitions for Smart Grid. This process concludes the capacity reinforcement stream to present
“SGMM” as a viable tool to support STEG achieve their Smart Grid roadmap efficiently and optimally.
APPENDIX 1 OVERVIEW OF METHODOLOGY
APPENDIX 2 SUMMARY OF KEY INFORMATION
Summary of key information (*)
Generation capacity (installed capacity) 5 653 MW
Peak Load 4 247 MW
Total energy supplied (energy flow on HV network) 20 352 000 MWh
Energy supplied to customers (Energy billed) 16 810 000 MWh
Total length of transmission lines 6 985 Km
Number of sub-stations or transformers 78 507
(*) Source: Annual Report 2019
Number of Clients (*)
Low voltage 4 122 600
Medium Voltage 19 748
High voltage 21
Total 4 142 369
Residential 3 106 244
Commercial 459 185
Industrial 50 214
Other 526 726
Total 4 142 369
(*) Source: STEG Annual Report 2019
Peak load constitutes
75% of the maximum generation capacity
The energy supplied to customers constitutes
83% of the total energy supplied (Distribution +
Transmission)
99.5% are Low
Voltage customers
73%
11%
1% 12%
Commercial Résidentiel Industriel Autres
Distribution
Investment costs (*)
Investments allocated to increase generation capacity and to improve the distribution network consist the largest part if the investment portfolio (71% of total investments)allocated.
Generation (Electricity) 185 MDT
Transmission (Electricity) 28 MDT
Distribution (Electricity) 128 MDT
Other (Electricity + Gas) 100 MDT
Total 441
(*) Year 2019 (Activity Report)
It should be noted that no investment or profit is recovered through Smart Grid programs (example of profit:
Investment costs recovery, reduction of OPEX, etc.)
Losses
Transmission Network losses 13,9%
Distribution Network losses
(Technical + Non-technical) 86,1%
Total 100% (= 3 542 GWh)
Percentage of Losses
Transmission Network losses (*) 2,4%
Distribution Network losses
(Technical + Non-technical) (**) 16,2%
Overall Loss Rate (Transmission
+ Distribution) 18,6% (= 3 542 GWh)
(*) Source: STEG Annual Report 2019
(**) Source: STEG data
42%
6%
29%
23%
Production (Electricité) Transport (Electricité)
Distribution (Electricité) Autres (Electricité + Gaz)
13,9%
86,1%
Pertes de Transport Pertes de distribution (Technique + Non-technique)
2,4%
16,2%
Pertes de Transport
Pertes de distribution (Technique + Non-technique
Quality of Service Indicators - Distribution Network
SAIDI 234 min
SAIFI 2,47
MAIFI Not used
Number of scheduled outages 2 726
Average duration of scheduled interruptions 190 min
Total annual number of operations team interventions on the network Not available
Annual greenhouse gas emission Not available
Source: STEG data
END - Distribution 14 147 MWh
END - Transport 555 MWh
TCE 17,13 min
- NDE= Non-Distributed Energy
- TCE=Equivalent interruption Time
Source: STEG Annual Report 2019
APPENDIX 3 SCORES PER LEVEL
LEVEL 1 INITIATION
SMR-1 0,80
OS-1 0,47
GO-1 0,76
WAM-1 0,37
TECH-1 0,62
CUST-1 0,50
VCI-1 0,34
SE-1 0,55
LEVEL 2 ENABLING
SMR-2 0,45
OS-2 0,48
GO-2 0,58
WAM-2 0,37
TECH-2 0,59
CUST-2 0,57
VCI-2 0,08
SE-2 0,56
LEVEL 3 INTEGRATION
SMR-3 0,28
OS-3 0,22
GO-3 0,03
WAM-3 0,17
TECH-3 0,18
CUST-3 0,27
VCI-3 0,08
SE-3 0,18
LEVEL 4 OPITIMIZING
SMR-4 0,10
OS-4 0,00
GO-4 0,00
WAM-4 0,00
TECH-4 0,00
CUST-4 0,17
VCI-4 0,00
SE-4 0,26
LEVEL 5 PIONEERING
SMR-5 0,00
OS-5 0,13
GO-5 0,00
WAM-5 0,00
TECH-5 0,15
CUST-5 0,00
VCI-5 0,00
SE-5 0,30
APPENDIX 4 SCOREBOARD BY DOMAIN
Domain 1 Strategy, Management and Regulatory
Domain 2 Organization and Structure
Domain 3 Grid Operations
Domain 4 Workforce and Asset Management
Domain 5 Technology
Domain 6 Customer
Domain 7 Value chain integration
Domain 8 Society and Environment
Page | 1
WORKSHOP EVALUATION REPORT
INTRODUCTION TO SMART GRID MATURITY MODEL « SGMM »
Date (MM/DD/YYYY) June 15th, 2021 Time From 14h30 to 16h30
Moderator Arwa Guesmi Location Virtual
Abbreviations List
Act
SGMM
STEG
Activity Smart Grid Maturity Model Tunisian Electric and Gas Utility (Société Tunisienne de l’Electricité et du Gaz)
1. Background
With reference to work-package 6 – Capacity Building and Knowledge Transfer – Act 3.2, The project team is organizing a series of workshops on the Smart Grid Maturity Model, a Management tool that was developed by Carnegie Mellon University – Software Engineering Institute in 2007 and published in 2018.
The Smart Grid Maturity Model was used and tested by 384 utilities in 47 countries and most utilities have witnessed an improvement in Maturity for Smart Grids after utilizing the Smart Grid Maturity Model.
This tool supports the planning process for Smart grids roll-out and informs decision making to establish a common framework to improve performance and optimize investments using Smart Grid technologies.
This workshop is the 1st workshop in a series of sessions organized to build the capabilities of STEG team to understand and utilize the Smart Grid Maturity Model as a management and decision making tool that would accelerate their Smart Grid strategy.
2. Workshop Objectives
This workshop aims to achieve 3 objectives:
- Present the general framework of The Smart Grid Maturity Model (Fundamentals)
- Highlight the relevance and importance of the Smart Grid Maturity Model as a management and decision making tool for Smart Grids
- Explain the Methodology : how the Smart Grid Maturity Model can be utilized?
3. Workshop Outcomes
The expected outcomes from the workshop are:
- Build a preliminary understanding of the Smart Grid Maturity Model framework, fundamentals, methodology and application process
- Understand the relevance and importance of the Smart Grdi Maturity Model in supporting utilities to plan for their Smart Grid transformations
Page | 2
4. Attendees
Name Organization E-mail
Nejib Sayyari STEG nsayari@steg.com.tn / sayarinejib02@gmail.com
Taoufik Tissaoui STEG ttissaoui@steg.com.tn / taoufik.tissaoui@gmail.com
Radhouane Dakhli STEG rdakhli@steg.com.tn / dakhli.dmt@gmail.com
Abir Ayachi STEG abirzaghdaneayachi@gmail.com / aayachi@steg.com.tn
Mohamed Amouri STEG
Hend Ennaifer STEG
Jihène Mlika STEG
Karim Trad STEG karim.trad70@gmail.com
Khaled Zaibi STEG kzaibi@steg.com.tn
Lobna Jouirou STEG
Mahbouba Amairi STEG
Mahrane Khalfour STEG
Mohamed Barboura STEG mbarboura@steg.com.tn / medbarboura@yahoo.fr
Mounira Houidhek STEG
Mounira Msaddek STEG mmsaddek@steg.com.tn
Nabil Mrad STEG
Nesrine Mekki STEG
N Mrabet STEG
Wiem Ben Hadj Yahia STEG wbenhadjyahia@steg.com.tn
DCRTE STEG
Aziza Laouini STEG
Arwa Guesmi Deloitte AGuesmi@deloitte.tn
Chiheb Rebai Deloitte chiheb.rebai@supcom.tn
Ezzeddine Khalfallah Deloitte k.ezzedine@gmail.com
Asma Jaziri Deloitte ajaziri@Deloitte.tn
Khaoula Sghaier Deloitte ksghaier@deloitte.tn
Rob Russo E3I rvrusso@eeeinternational.com
Bonnie Norman E3I bnorman@eeeinternational.com
Marc Boillot E3I mboillot@eeeinternational.com
Michael Grossman E3I mgrossmann@eeeinternational.com
Diakite Aboubacar E3I aboubacar.diakite@eleves.enpc.fr
Alain Doulet E3I adoulet@eeeinternational.com mailto:nsayari@steg.com.tn mailto:ttissaoui@steg.com.tn mailto:rdakhli@steg.com.tn mailto:abirzaghdaneayachi@gmail.com mailto:karim.trad70@gmail.com mailto:kzaibi@steg.com.tn mailto:mbarboura@steg.com.tn%20/%20medbarboura@yahoo.fr mailto:mmsaddek@steg.com.tn mailto:wbenhadjyahia@steg.com.tn mailto:AGuesmi@deloitte.tn mailto:chiheb.rebai@supcom.tn mailto:k.ezzedine@gmail.com mailto:ajaziri@Deloitte.tn mailto:ksghaier@deloitte.tn mailto:rvrusso@eeeinternational.com mailto:bnorman@eeeinternational.com mailto:mboillot@eeeinternational.com mailto:aboubacar.diakite@eleves.enpc.fr mailto:adoulet@eeeinternational.com
Page | 3
5. Key Indicators
6. Screenshots
32 Participants in total
48% Of participants from STEG are Women 100%
Of Respondents to survey said they will participate in future workshops
21 Participants from STEG
Page | 4
7. Analysis of responses on Evaluation survey
52% of participants have completed the workshop evaluation survey which totals 11 responses. The respondents shared very positive feedback about the workshop from an organization, presentation and facilitation, content standpoint.
We also received recommendations and remakrs which will allow for an improved organization and presentation for future workshops.
91% of the respondants think that the objectives of the workshop were communicated clearly before the session.
52% of participants responded to the evaluation survey = 11 responses in total.
73% of respondents think that the objectives communicated before the workshop were achieved; 27% think the obbjectives were partially achieved.
91%
9%
Yes
No
52% 48%
Responded Did not respond
73%
27%
Yes
Partially
Page | 5
91% of respondents evaluated the session organization, presentation and facilitation quality as very good; 9% thought that the session was excellent.
73% of respondents evaluated the depth and relevance of technical content as very good; 27% thought it was good.
91% of respondents said that the workshop was very good.
73% of respondents said they never used the Smart Grid Maturity Model before; 18% have used it once.
55% of respondents think that the Smart
Grid Maturity Model is useful in general;
45% think that it is ueful but other models should be studied too.
64% of respondents think that the Smart
Grid Maturity Model is very relevant to
STEG Smart Grid Program.
91%
9%
Very good
Excellent
27%
73%
Good
Very good
18%
9%
73%
Yes, once
No, but I'm familiar with it
Never
9%
91% Good
Very good
45%
55%
Yes, but other models should be explored
Yes, definitely
18%
64%
18%
Somehow relevant
Relevant very relevant
Page | 6
8. Questions received from Participants
During Q&A, we received 17 questions which we addressed during the workshop.
Note: The questions are listed in their original language (French)
QUESTION ANSWER
Est-ce que vous pouvez donner une idée sur l'apport et les bénéfices des mesures de SGMM ?
1/ La partie mesure de la maturité sert à se situer, à identifier où on est et vers où on souhaite aller. Ainsi, définir le gap entre l’état actuel et l’état futur et tracer l'ensemble des caractéristiques et fonctionnalités pour évoluer dans la trajectoire de déploiement de Smart Grid.
2/ La matrice SGMM donne la garantie et le retour d'expérience des autres utilities (USA) qui ont déjà utilisé l’outil.
Comment exploiter le retour d'expérience des utilities.
Est-ce que pour chaque questionnaire il y a des actions à faire ?
1/ En analysant le scoring et le niveau de maturité de la STEG, on va se situer par rapport à l'ensemble des utilities qui ont utilisé l’outil SGMM et on va avoir une cartographie. Aux USA, il y a des DSOs de tailles semblables à un BCC, D’où l’intéret de voir sur quel axe ils ont travaillé.
Est-ce que l’outil SGMM prend en compte l'évolution technologique ?
1/ Oui, l'institut SEI est en train d'assurer la maintenance de SGMM et son évolution (on a passé de la version v1.1 vers v1.2), d'où l'intérêt de son utilisation, c'est un outil vivant.
Est-ce que l’opération du scoring est binaire?
1/ Non, l’outil scoring n’est pas binaire. On peut avoir 5 possibilités de réponses avec des pourcentages différents. Chaque question a sa spécificité.
Est ce qu'il y a des poids sur critères d’évaluation ?
1/ Pour attribué un niveau il faut avoir 70°% des caractéristiques requises. Il y a des caractéristiques optionnelles, quand on a les résultats, il y a un autre niveau de granularité, le niveau de la matrice est très précis.
Le modèle a un aspect stratégique, comment ça se manifeste ?
1/ L’aspect stratégie est un domaine couvert par SGMM. La stratégie est traitée comme une dimension impactée par la transformation technologique des réseaux intelligents.
Page | 7
Comment est-ce que l’outil SGMM aide à la prise de décision ?
Est-ce qu’il y a des exemples ?
1/ Exemple : la STEG veut mettre en place un programme de demande/réponse dans 3 ans dans un site pilote. A travers SGMM, la STEG peut définir les prérequis qu'elle doit mettre en place pour implémenter le programme demande/réponse. Si la STEG doit mettre en place 3 actions principales qui durent 5 ans et qui nécessitent un grand investissement, à travers cet outil, la STEG peut prendre la décision si c'est dans leur avantage de dépenser cet argent pour mettre en place le programme ou pas.
Est-ce que SGMM est un standard ? Est-ce qu’il y a d'autre modèles ?
1/ Le SGMM est bâti par un consortium des sociétés d'électricité américaines avec le support APQC, qui donne les approches les plus utilisés au monde.
2/ SEI définit des standards comme SMMI qui est orienté process, qualifie une entreprise pour avoir un niveau permettant de participer à des appels d'offres (qualification des processus de développement). SGMM n'est pas dédié pour des entreprises privés, le processus de certif existe mais la vocation de SGMM est d'être utilisé par les utilities pour avoir un tableau de bord, pour le déploiement. SGMM est un outil d'aide au déploiement Smart Grid (CMMI process).
3/ SGMM est utilisé pour que les utilities soient accompagnés dans la technologie smart grid sur les 8 domaines.
Est-ce que les questionnaires qu’on a déjà rempli vont nous aider dans ce sens?
1/ L’outil SGMM correspond à une analyse transverse (analyse des caractéristiques déjà établies dans les méta modèles), on ne peut pas modifier des caractéristiques, on l'utilise tel qu'il pour avoir la richesse du retour d'expérience) 2/ Les 3 questionnaires élaborés par Marc et Alain sont verticaux, on s'est focalisé sur 3 problématiques, clientèle, BCC et ENR.
3/ Les 2 approches sont complémentaires mais ne chevauchent pas.
Afin de mesurer la maturité, il faut reprendre l'exercice après chaque période ?
1/ Oui, c'est un outil de suivi et de tracking. Ce qui est recommandé est de faire l'analyse de l'existant pour avoir l'impact et la réalisation.
2/ Une cyclicité de 30 mois est recommandé. Il faut au moins 2 ans pour le refaire.
3/ Il nous donne 2 types d'analyse, AS IS et TO BE pour définir un roadmap
Afin de se comparer aux autres, est ce qu’il y a un standard à chaque utility ?
1/ Ça dépend de la volatilité de déploiement des utilites, quelques-uns sont rapides, d'autres publiques donc la mise en marche nécessite plus de temps.
Page | 8
Est-ce que la fréquence temporelle influe sur le score ?
1/ La fréquence de répétition dépend des contraintes.
2/ Non, ça n'intervient pas.
Sur le slide 10, Est-ce que vous pouvez clarifier plus le graphique ?
1/ Le graphique présente le pourcentage des différents types d'opérateurs qui utilisent SGMM. Il y a ceux qui se focalisent sur transport seulement, d’autres opérateurs qui interviennent dans le secteur sans être utility (agence gouvernementale de régulation, les ISOs, RTOs, opérateurs régionaux).
2/ L’impact de Smart Grid sur le métier distribution et commercialisation est grand, l’impact est moins fort sur transport et production.
Comment vous expliquez l'absence de SGMM en Europe ?
EMEA = Europe, Middle East and Africa La France utilise SGMM déjà
1/ UK, Denmark, La Belgique et autre pays Européens ont déjà utilisé cet outil, en UK, 7 utilities ont déjà déployé le SGMM.
Le modèle utilisé est majoritairement utilisé par pays Anglophones, est ce qu'il y aura des adaptations ?
1/ La correction entre les versions 1.1 et 1.2, c'est des caractéristiques qui répondent à des besoins des utilities, il y a une similitude entre réseau tunisien et nord-américain, avec des problématiques liés aux déploiement de technologie, de modernisation du réseau contemporain.
Est-ce qu’il y a des critères de sélection sur les caractéristiques optionnelles ?
1/ Les paramètres optionnels sont importants pour contextualiser le scoring derrière. Il y a des caractéristiques qui seront validées avec un score de 100%.
Pour l’engin de calcul, est ce qu’il y a derrière ce modèle un processus automatique de suivi pour faciliter les calculs.
1/ L’engin de calcul est développé par SEI, sans licence à acheter, il faut remplir le Compass Survey, puis SEI renvoi le calcul. C’est un atout très important.
PRESENTATION - SMART GRID MATURITY MODEL « SGMM » QUESTIONNAIRES
Date (MM/DD/YYYY) July 13th, 2021 Time From 8h00 to 12h00
Moderator and Organizer
Arwa Guesmi Location Virtual team is organizing a series of workshops on the Smart Grid Maturity Model, a Management tool that was developed by Carnegie Mellon University – Software Engineering Institute in 2007 and published in 2018.
The Smart Grid Maturity Model was used and tested by 384 utilities in 47 countries and most utilities have witnessed an improvement in Maturity for Smart Grids after utilizing the Smart Grid Maturity Model.
This tool supports the planning process for Smart grids roll-out and informs decision making to establish a common framework to improve performance and optimize investments using Smart Grid technologies.
This workshop is the 2nd workshop in a series of sessions organized to build the capabilities of STEG
This workshop aims to achieve the following objectives:
- Present questionnairs : expected and informative characteristics, domain specific questions and general questions
- Give an overview of questionnaires completion exercice guidelines and best practices
- Enable STEG teams to have a simplified understanding on SGMM questions and characteristics and conduct the exercice efficiently
- STEG teams understand domain specific questions, expected and informative characteristics
- STEG teams are enabled to conduct the exercice with respect to SGMM guidelines and best practices
Nejib Sayyari STEG nsayari@steg.com.tn / sayarinejib02@gmail.com
Taoufik Tissaoui STEG ttissaoui@steg.com.tn / taoufik.tissaoui@gmail.com
Radhouane Dakhli STEG rdakhli@steg.com.tn / dakhli.dmt@gmail.com
Abir Ayachi STEG abirzaghdaneayachi@gmail.com / aayachi@steg.com.tn
Mohamed Amouri STEG mamouri@steg.com.tn
Hend Ennaifer STEG hennaifer@steg.com.tn
Karim Trad STEG karim.trad70@gmail.com
Khaled Zaibi STEG kzaibi@steg.com.tn
Lobna Jouirou STEG jouiroulobna123@gmail.com
Mahrane Khalfoun STEG mkhalfoun@steg.com.tn
Mounir Houidhek STEG mhouidhek@steg.com.tn
Mounira Msaddek STEG mmsaddek@steg.com.tn
Nabil Mrad STEG nmrad@steg.com.tn
Nesrine Mekki STEG nmakki@steg.com.tn
Naoufel Mrabet STEG nmrabet@steg.com.tn
Wiem Ben Hadj Yahia STEG wbenhadjyahia@steg.com.tn
Haifa Gmati STEG hgmati@steg.com.tn
Mohamed Rafraf STEG mhrafraf@steg.com.tn
Afef Bannour STEG abennour@steg.com.tn / afefidani@gmail.com
Ines Taieb STEG itaieb@steg.com.tn
Ahmed El Beji STEG aelbeji@steg.com.tn
Rafik Bezzaouia STEG rbezzaouia@steg.com.tn
Meriem Bessibes STEG mbessibes@steg.com.tn
Radhouane Damergi STEG rdamergi@steg.com.tn
Med Amine Aguir STEG
Aidoudi STEG
Malek STEG
Oussama STEG
Arwa Guesmi Deloitte AGuesmi@deloitte.tn
Chiheb Rebai Deloitte chiheb.rebai@supcom.tn
Ezzeddine Khalfallah Deloitte k.ezzedine@gmail.com
Asma Jaziri Deloitte ajaziri@Deloitte.tn
Khaoula Sghaier Deloitte ksghaier@deloitte.tn
Rob Russo E3I rvrusso@eeeinternational.com
Aaron Snyder EnerNex aaron@enernex.com mailto:nsayari@steg.com.tn mailto:ttissaoui@steg.com.tn mailto:rdakhli@steg.com.tn mailto:abirzaghdaneayachi@gmail.com mailto:mamouri@steg.com.tn mailto:hennaifer@steg.com.tn mailto:karim.trad70@gmail.com mailto:kzaibi@steg.com.tn mailto:jouiroulobna123@gmail.com mailto:mkhalfoun@steg.com.tn mailto:mhouidhek@steg.com.tn mailto:mmsaddek@steg.com.tn mailto:nmrad@steg.com.tn mailto:nmakki@steg.com.tn mailto:nmrabet@steg.com.tn mailto:wbenhadjyahia@steg.com.tn mailto:hgmati@steg.com.tn mailto:mhrafraf@steg.com.tn mailto:abennour@steg.com.tn mailto:afefidani@gmail.com mailto:itaieb@steg.com.tn mailto:aelbeji@steg.com.tn mailto:rbezzaouia@steg.com.tn mailto:mbessibes@steg.com.tn mailto:rdamergi@steg.com.tn mailto:AGuesmi@deloitte.tn mailto:chiheb.rebai@supcom.tn mailto:k.ezzedine@gmail.com mailto:ajaziri@Deloitte.tn mailto:ksghaier@deloitte.tn mailto:rvrusso@eeeinternational.com mailto:aaron@enernex.com
LINK TO SURVEY CLICK HERE
35 Participants in total
35% Of participants from STEG are Women 100%
Of Respondents to survey said they will participate in future workshops
28 Participants from STEG https://dsurvey.deloitte.fr/#/survey/60e314dfb0cf090018c35c67
6. Analysis of responses on Evaluation survey
40% of participants have completed the workshop evaluation survey which totals 14 responses. The respondents shared very positive feedback about the workshop from an organization, presentation and facilitation, content standpoint.
We also received recommendations and remarks which will allow for an improved organization and presentation of future workshops.
100% of the respondants think that the objectives of the workshop were clearly communicated before the session.
40% of participants responded to the evaluation survey = 14 responses in total.
64% of respondents think that the objectives communicated before the workshop were achieved; 36% think the obbjectives were partially achieved.
40%
60%
Responded Did not respond
100%
Yes No
64%
36%
Yes Partially
79% of respondents evaluated the session organization, presentation and facilitation quality as very good; 21% thought that the session was excellent.
79% of respondents evaluated the depth and relevance of technical content as very good; 21% thought it was excellent.
57% of respondents think that the duration of the workshop was short with comparaison to content presented and they wish it was extended to explain more topics, 43% think that the duration is good and aligned with proposed content.
The respondants had very positive feedback about the presenters and their capacity to engage with participants and facilitate the session.
71% think that the interaction with participants was very good.
86% of respondents said that the workshop was very good overall.
100% of respondents confirmed their interest to participate in future workshops.
79%
21%
Very good Excellent
79%
21%
Very good Excellent
43%
57%
Duration is aligned with proposed content
Duration should be extended to explain more topics
7%
86%
7%
Good Very good Excellent
71% 64%
50% 57%
0%
20%
40%
60%
80%
100%
Good interaction with participants
Structured speech and ideas
Clear presentation
Full command of workshop topic
100%
Yes No
Before the workshop, did you know that the Smart Grid vision impacts diferent business functions within the organisation?
64% of respondents said that STEG Smart Grid vision covers some business functions.
Before the workshop, were you aware of the required functional characteristics and domains for Smart Grids across different business functions?
50% were partially aware, 36% were not aware.
50% of respondents think that the SGMM framework covers all aspects to develop Smart Grid strategies, 36% think it offers a comprehensive understanding and 14% think that it important but not a requirement.
Do you think you need hands-on support to complete the SGMM questionnaires?
29% think that hands-on support is necessary, 64% think that hands-on support is necessary for some domains.
After the workshop, do you think STEG Smart Grid vision needs to be reviewed?
57% said some objectives need to be reviewed, 36% think that the vision should be reviewed and further developed.
Will you use SGMM questionnaires in the future?
57% said yes they will use it again, 43% said maybe.
36%
50%
14%
No
Partially, domains and functions
Completely, all domains and functions
64%
36%
STEG Smart Grid vision covers some business functions
STEG Smart Grid vision is scross-cutting and covers all business functions
50% 36%
14%
Definitely, the SGMM framework covers all aspects to develop Smart Grid strategies
The SGMM framework offers a comprehensive view and understanding to develop Smart Grid strategies
Partially, the SGMM framework is important but not required to develop Smart Grid strategies
43%
57%
Maybe Yes
7%
57%
36%
No
Partially, the objectives need to be reviewed against Smart Grids functional requirements
Yes, the vision should be reviewed and further developed
64%
29%
7%
Partially, hands-on support needed for few domains and functions
Yes, hands-on support for all domains and functions is necessary
No, The process is very clear, hands-on support is not needed
Participants also shared some comments and feedback.
Do you have any recommendations to improve future workshops and online sessions ?
Any other feedback or recommendations ?
We propose to organize another workshop
1- There seems to be some ambiguities and discrepancies in understanding the questions by participants, we hope that the summary guide will provide more context and clarifications, otherwise, hands-on support is necessary.
2- There needs to be a list of directives for each domain in order to have more accurate and precise responses to the SGMM questions and organize hands-on session to support the process.
The duration of the workshop needs to be aligned with proposed content
There should be a deadline to finalize the AS IS assessment using
SGMM framework.
We wish to see more business cases and ractical examples during the workshops (benchmark results, etc.)
More practical examples
More time for questions and shorter answers There should be an internal coordination at the level of STEG for this process
Very informative and well organized session
Nothing to report, thank you to participants and presenters
7. Questions received from Participants
During Q&A, we received 17 questions and comments which we addressed during the workshop.
QUESTIONS/ COMMENTS ANSWERS
Est-ce qu'on est capable de préparer des exigences convenables pour le Smart Grid puisqu'on planifie à faire une rénovation des BCCs ?
Les concepts sont déjà là pour pouvoir déployer une technologie pour la gestion du réseau.
À une étape ultérieure, on va appuyer les collègues STEG pour écrire le cahier de charges.
Pour situer cette activité dans le cadre du projet, nous sommes en phase SGMM-1. Actuellement, on mesure le degré de maturité de l'état des lieux de la STEG, après il y aura une autre évaluation SGMM-2 en termes d'ambitions (la cible). Le Gap analysis va identifier l'écart entre le niveau de maturité entre SGMM-1 et SGMM-2 et les gaps à remplir à travers le projets (use cases).
Est ce que dans le pilote on arrivera à un niveau de maturité cible?
Par exemple, pour le domaine GO, avec les 5 niveaux de maturité définis, est ce qu'on peut arriver à un niveau de maturité avancé pendant la phase projet pilote?
1/ Il faut que le questionnaire traduit la réalité des choses (état des lieux) 2/ Si on identifie un domaine spécifique, on pourra tester deux ou trois use cases pour démontrer la valeur et les bénéfices amenés par la technologie et définir les KPI pour faire les mesures et les évaluations nécessaires 3/ On peut toujours accélérer la reflexion et anticiper le degré de maturité dans le site pilote.
Pour passer d'un degré de maturité à un autre, il faut définir les exigences nécessaires et répondre aux caractéristiques requises qui défnit le ou les domaines 4/Si les use cases déployés permettent de définir des KPIs qui répondrent aux charactéristiques requises pour un domaine, on peut dans ce cas passer au niveau de maturité adéquat. La définition des KPIs et exigences ainsi que l'achèvement des caractéristiques requises permettent l'évolution en maturité pour un domaine ou plusieurs domaines fonctionnels.
Est-ce qu'il y a des bonnes pratiques pour le passage d'un niveau à un niveau plus élevé?
SGMM est un mirroir qui nous permet de de s'identifier par rapport aux autres (reste du monde = communauté des utilities). certes, il ya des recommendations (la moyenne mondiale est entre le niveau 2 et le niveau 3). La maturité nécessite des investissements et dispositions à tous les niveaux pour génèrer de la valeur. On peut connaitre les aspirations (TO BE) mais le plan d'action doit répondre aux objectifs de la stratégie de la STEG et au timeline des investissements.
Le bechmarking est recommandé afin de se positionner par rapport aux autres entreprises similaires.
1/Le Benchmarking va couvrir les tendences en termes d'innovation technologique et aussi présenter les résultats de la communauté "utilities" en terme de Maturité après l'utilisation du
SGMM.
2/ Pour passer d'un niveau à un autre il faut tout d'abord répondre à toutes les caractéristiques requises du niveau précédent. exemple (pour passer du Niv 1 au Niv 2, il faut que les caractéristiques requises du Niveau 1 et le Niv 2 seront toutes atteintes sans faute).
3/ Le benchmark couvre l'aspect technologique, le retour d'expérience au niveau du déploiement, etc.
Les nouveaux BCC doivent étre outillés de caractéristiques techniques et fonctionnelles permettant l'atteinte d'un niveau de maturité cible (plus élevé que le niveau de l'état des lieux).
Une fois le questionnaire est rempli, est ce que les domaines d'ordre stratégique avec un degré de maturité initiation (niveau 1) vont impacter les domaines techniques qui ont un niveau de maturité plus élevé?
1/ Le SGMM est un outil pour caractériser la vision Smart Grid de la société d'électricité. Le SGMM définit 8 domaines qui caractérisent la maturité au sein de l'organisation à travers tous les métiers et fonctions.
2/ La cartographie est parlante, la liaison entre les domaines va apparaître eventuellement
Page | 9 lors de l'exercise de remplissage des questionnaires.
3/ Les choix des réponses SGMM doivent être harmonisés.
Est ce qu'il y a des bonnes pratiques pour booster les niveaux de maturité des domaines SMR et OS pour ne pas impacter le process d'évaluation ?
1/ Les réponses seront révélatrices et vont permettre d'avoir des idées sur les corrections et les objectifs à prioriser.
2/ La façon dont les questions sont posées donne une idée sur l'orientation et les axes de reflexion.
3/ La recommendation est de faire participer tout le monde.
4/ Le Niveau 5 ne veut pas dire l'état optimal dans l'absolu. Le SGMM recommande que la utility qui fait cet exercise contextualise par rapport ce qui est permissible et réglementé dans le pays et la région. Dans certains cas, le Niv 4 ou 5 induit plus d'effet négatifs que positifs.
Par rapport à la réponse aux questionnaires, est ce qu'il y a possibilité d'inclure plusieurs noms?
Dans la deuxième feuille du fichier Excel (Questionnaires), Il y a un champ ou toute personne qui ont répondu aux questionnaires peut entrer ses informations.
Est-ce que vous recommendez que la personne soit sûre de connaître la bonne réponse?
Il est recommandé que celui qui répond à la question soit sûr à 85%.
Est-ce que chacun doit répondre tout seul, ou on nécessite une réponse collective?
L'objectif est d'avoir une version finale la plus proche de la réalité. On n'est pas dans un exercice statistique. Il faut trouver le mécanisme interne pour fiabiliser l'information.
A mon avis il faut constituer une équipe STEG pour répondre au questionnaire et remplir tous les domaines
Tout a fait, c'est l'objectif de l'exercise.
Je n'ai pas trouvé le moteur d'évaluation. Est-ce que ça va être présenter/expliquer à une étape ultérieure?
Nous sommes dans la phase d'initiation, puis on entamera la phase d'accompagnement pour le remplissage des questionnaires.
Ou sont introduites les caratéristiques optionnelles?
Les caractéristiques optionnelles sont cachées dans les réponses.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .