Recommended Environmental Mitigation and Monitoring Plan Template for USAID/Malawi SEED activities
The following EMMP format is recommended and it takes into consideration proposed environmental and social management framework requirements by Malawi’s Environmental Affairs Department. The EMMP template satisfies requirements of USAID and Malawi’s EAD. It can be adapted, as necessary.
Environmental and Social Management Plan of the Malawi Secondary Education Expansion for Development
Construction of a Classroom Blocks or Community Day Secondary School
Located in XXX, XXX District
For the Environmental Affairs Department
Of the Government of Malawi
By ……………………………………………..(Name of Contractor/IP)
And the United States Agency for International Development
Written by:
…………………… ( Name of Contractor/IP)
Submitted by: ………(Name of contractor/IP)
Date
Table of contents
EXECUTIVE SUMMARY
Provide highlights of the activity including activity background. Provide purpose of ESMP and highlight major environmental and social issues presented in the ESMP report.
USAID APPROVALS
Provide an overview of USAID internal EIA processes, demonstrating that due diligence has been undertaken prior to construction works. Include highlights of SEED IEE and other construction works.
SECTION 1: ACTIVITY DESCRIPTION
Provide a brief description of the nature and location of the construction works with respect to name of the project proponent, nature of the project, duration, estimated costs for the construction works, design of the structures, land ownership and current use. The description should also include estimated number of workers to be engaged.
SECTION 2: DESCRIPTION OF EXISTING ENVIRONMENT
Provide Biophysical Characteristics (Soils, Topography, Vegetation, etc.) of the site. These should be site specific.
Include any climate risks/stressors observed in the region such as increased temperature, droughts, flooding, hailstorms, etc. Also provide socio-economic Conditions of the site including Water Supply, Health, Transportation, Sanitation, etc.)
SECTION 3: APPLICABLE LEGAL AND POLICIES INCLUDING LICENSES AND
PERMITS
Provide an account of all regulatory licenses and approvals required for the proposed activity to ensure that the activity will be in line with sound environmental management practices. Most of these requirements are already discussed in the IEE.
SECTION 4: IDENTIFICATION AND ASSESSMENT OF IMPACTS
Identify and assess Potential Environmental Impacts from Constructing School Buildings on sensitive or valuable ecosystems, material sourcing, water resources, air quality, waste management, workers, communities, aesthetics of the site, land acquisition, sanitation, SECTION 5: ENVIRONMENTAL MITIGATION AND MONITORING PLANS (TABLES)
2.1.1 EMMP TABLE FOR MALAWI SEED – XXX SITE – LAND ACQUISITION ACTIVITIES
Environmental Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs
Potential exclusion of project affected people
Invite all potential project affected people to take part in consultative processes
Invite all community leaders and related government officials to take part in consultative processes
Divide community leaders and government officials from project affected people to ensure all claims are heard
# of interviews with activity stakeholders conducted
Existence of a stakeholder participatory list with contact information
# of people identified during consultative process with legitimate tenure claims at proposed site
Review documentation from stakeholder process
Contact legitimate tenure claimants from stakeholder process to confirm participation
When submitted Construction Manager
Potential impact on undeveloped land through in-kind compensation
Follow up with the community is needed to resolve the community’s handling of in-kind compensations
Identify amount of legitimate tenure claims over the proposed site
Identify nearby suitable and equitable land NOT in a sensitive ecosystem to provide as compensation to claimants and NOT already claimed by others
# of legitimate tenure claimants that received equitable in-kind compensation
Area of land provided during in-kind compensation
Area of land requiring clearing of vegetation
Review stakeholder consultation documentation
Contact individuals from stakeholder process to confirm compensation received
Coordinator
2.1.1 EMMP TABLE FOR MALAWI SEED – XXX SITE – LAND ACQUISITION ACTIVITIES
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs
Lack of proof of ownership may inhibit construction or endanger long-term claims to the land
Signed agreements with community leaders/education authorities approving land for SEED school use
Signed agreements between community leaders and claimants releasing claim to school property
Signed agreements between community leaders and claimants ensuring claimants long-term use of in-kind land
# of community leaders\educational authorities signing an agreement for the approval of land for SEED school use
# of legitimate tenure claimants agreeing to release claims to school property
# of legitimate tenure claimants receiving long-term agreements with community leaders for use of in-kind land
Receipt of copies of agreements (match signed claimants to consultative process identified claimants)
One time – Prior to Commencement of Construction
Construction
2.1.2 EMMP FOR MALAWI SEED – XXX SITE – CDSS PRE-CONSTRUCTION ACTIVITIES
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs
Non-compliance with Malawian Government can lead to unintended environmental and legal consequences
Obtain permission from the Environmental Affairs Department (EAD) to undertake this construction activity prior to breaking ground
ESMP approval letter from
EAD
Approved document from EAD that the activity team has satisfied the Government of Malawi’s requirements for construction
When submitted (prior to construction activities)
Implementing Partner to have USAID review documentation before submittal.
A changing climate and district- specific natural disasters can negatively impact infrastructure if not planned for
Designs to bolster buildings against:
1) Stronger Winds - reinforced roof and windows;
2) Heavier Rains – gutters that overhang the walls to reduce erosion and other erosion control measures;
3) Hail Storms – reinforced roof and windows, and construction bricks that will not be damaged by hail;
4) Increasing Temperatures – improved ventilation to quickly remove heat; and,
5) Earthquakes – reinforced foundation and walls.
A completed and engineer approved construction design for ALL buildings that address the potential for severe weather and natural disasters
Receipt of draft design
Receipt of final design
When submitted
Poor site planning can lead to degradation of nearby natural resources
No building to be constructed within 30m of a slope greater than 5% to prevent erosion from runoff
Plan to include vegetation locations (i.e. trees) to avoid unnecessary destruction of vegetation
A completed and engineer approved site plan for ALL buildings
Receipt of draft design
Receipt of final
2.1.2 EMMP FOR MALAWI SEED – XXX SITE – CDSS PRE-CONSTRUCTION ACTIVITIES
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs
Lack of professional design can endanger the longevity of the infrastructure and the health of the construction workers
Engineering firm contracted to design the structures must be licensed in Malawi and experienced
Valid and non-expired Malawian engineering license
# of previous contracted and completed construction designs
Receive copy of engineering license
Contact relevant Malawian government entity to verify license validity
Receive list of completed contracts from engineering firm
Contact previous employers of engineering firm to confirm successful completion of work
(this is all in the technical proposal)
Construction Manager
Lack of appropriate fire prevention design for laboratory can lead to fires that harm the health of beneficiaries and destroy infrastructure
The laboratory must be designed to resist a fire outbreak due to poor handling of flammable chemicals
# of fire resistant material (defined generally as a material that has been enabled to be nonflammable) implemented in laboratory design
Review laboratory design with EIMU to identify fire resistant materials
2.1.3 EMMP FOR MALAWI SEED – XXX SITE – CDSS GENERAL-CONSTRUCTION ACTIVITIES
ENVIRONMENTAL RISKS
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
SUBSTANDARD
CONSTRUCTION
MATERIALS CAN LEAD
TO INFRASTRUCTURE
FAILURE, DAMAGE TO
THE ENVIRONMENT,
AND RISK THE HEALTH
OF WORKERS AND
BENEFICIARIES
OVERSIGHT MEASURES ARE TO CONFIRM CHOSEN BUILDING
MATERIALS AND THOSE USED ON SITE ARE APPROPRIATE FOR
CONSTRUCTION BASED ON APPROVED DESIGN
# OF INCIDENCES IN WHICH
CONSTRUCTION MATERIALS
WERE FOUND TO BE OF SUB-
STANDARD QUALITY
Spot checks of delivered materials to construction site
Spot checks of materials combined on site for construction purposes (i.e. testing concrete mixtures)
PLANNED SITE
INSPECTIONS
Fortnightly
FORTNIGHTLY
Coordinator with the Guidance from Construction Manager
POOR
IMPLEMENTATION OF
CONSTRUCTION
STANDARDS CAN LEAD
TO INFRASTRUCTURE
FAILURE, DAMAGE TO
THE ENVIRONMENT,
AND RISK THE HEALTH
OF WORKERS AND
BENEFICIARIES
OVERSIGHT MEASURES ARE TO CONFIRM CONSTRUCTION
ACTIVITIES ARE IMPLEMENTING APPROPRIATE
CONSTRUCTION STANDARDS BASED ON APPROVED DESIGN
# OF INCIDENCES IN WHICH
CONSTRUCTION STANDARDS
BASED ON THE APPROVED
ENGINEERING DESIGN WERE
NOT FOLLOWED
Spot checks of construction practices (i.e. all appropriate materials used in foundation, angle of roof trusses, thickness of walls, etc.)
PLANNED SITE
INSPECTIONS
DAILY
Construction Coordinator with Guidance from Construction Manager
NON-COMPLIANCE
WITH IEE DURING
CONSTRUCTION CAN
LEAD TO
INFRASTRUCTURE
OVERSIGHT MEASURES ARE TO CONFIRM APPROVED SITE
PLANS ARE IMPLEMENTED CORRECTLY
# OF INCIDENCES IN WHICH
APPROVED SITE PLANS WERE
NOT FOLLOWED
Planned site inspections
EACH TIME A
GROUNDBREAKING
WILL OCCUR FOR A
NEW BUILDING
Construction Coordinator with Guidance from
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
FAILURE, DAMAGE TO
THE ENVIRONMENT,
AND RISK THE HEALTH
OF WORKERS AND
BENEFICIARIES
NOISE DISTURBANCE
TO ADJACENT
DWELLINGS, PRIMARY
SCHOOL, AND
CULTURAL CENTER
Concentrate noisiest types of work and highest frequency vibrations activities into as short a period as possible, and during least disruptive times of day.
Avoid, to the extent possible, noisy and high vibration work during XXX primary school hours in which instruction may be disturbed
Avoid, to the extent possible, noisy and high vibration operations during cultural ceremonies at the cultural center and graveyard 100m from construction site
# of noise / vibration complaints from community members or primary school teachers
Schedule on-site indicating hours in which noisy and high vibration operations may occur
Discussions with community leaders, community members, and primary school headmaster
Spot check for noise / high vibration schedule on site
Monthly
BI WEEKLY
Coordinator and Construction Oversight Committee
USE OF BURNT BRICKS
AS CONSTRUCTION
MATERIALS CAN LEAD
TO DEGRADATION OF
NATURAL RESOURCES
Avoid the use of burnt bricks as construction materials due to waste of forest resources needed to heat them. Use soil stabilized blocks (SSBs), to the extent possible, to reduce both the need for wood to burn and sand to hold the block together. Concrete blocks are to be used when SSBs are not appropriate structurally to reduce the wastage of wood, even
% of blocks used in construction that are SSBs
% of blocks used in construction that are concrete blocks
Review construction reports
Site visits
Monthly Construction
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
though more sand is used.
ADVERSE IMPACTS ON
VEGETATION
Minimize destruction of vegetation during construction activities
When a tree is removed, if feasible, relocate the tree on site. Where relocation is not feasible, replant two native tree saplings of an anthropogenically useful tree (i.e. fruit, shade, etc.) on site or nearby with the consent of the Village Natural Resources Management Committee or School Management Committee
Revegetate shrubs or grasslands immediately following land disturbance to prevent erosion that would remove topsoil and cause sedimentation
Ensure care for replanted / revegetated areas until the vegetation is robust and growing
# of trees removed
# of tree saplings replanted
Area of disturbed vegetation due to construction activities
Area of denuded lands revegetated
Site visits
Taking pictures for documentation
Measuring areas of denuded and revegetated lands
Request information on the care of revegetated lands
Monthly Construction Coordinator and Construction Oversight Committee
POTENTIAL FOR
EROSION AROUND
INFRASTRUCTURE
If there is a risk of soil instability, it is necessary to choose another location or install a stabilization/recovery structure
Implement a soil protection system around infrastructure, stockpiles of materials, and stockpiles of construction waste to protect against wind and water erosion.
Use erosion control measures such as bales (pesticide free bales of agricultural waste) before storm events.
Infrastructure foundations must reach stable subsurface, establishing a hard foundation (and with
# of building sites relocated due to unstable ground
# of anti-erosion techniques applied
% of foundations that do NOT reach stable ground and have spread footing
Compaction level records
Check records or ask field teams if and when they had to relocate sites due to unstable ground
Visually inspect construction sites for erosion
Construction workers are to report when foundations do NOT
Quarterly check on records for when sites were relocated due to unstable ground
Monthly visual inspections for erosion and immediately after storm events
Request of workers to notify
Construction Manager and
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
spread footings if needed) in m-kg/m3 reach stable soil layers or when a spread footing was not put in place
Implementing Partner whenever foundations have been placed on unstable ground and without spread footing
USE OF HEAVY
EQUIPMENT CAN CAUSE
EROSION, DAMAGE
ROADS, COMPACT SOIL,
CONTAMINATE SOILS,
AND PRODUCE GHG
EMISSIONS
Minimize use of heavy machinery
Set protocols for vehicle maintenance such as requiring that repairs and fueling occur elsewhere or over impervious surface such as plastic sheeting
Prevent dumping of hazardous materials (i.e. oil, gasoline, lubricants, coolants, etc.)
Vehicle maintenance must not be conducted within 50m of surface water sources
Have a soil remediation or removal plan in place in case of spillage
Existence of vehicle maintenance protocols
# of incidences of vehicle maintenance protocols NOT being followed
# of heavy machinery in use
# of hours per week heavy machinery used
Site visit
Review vehicle maintenance logbook
Review any reports of machinery use and/or speak with construction manager and crew about heavy machinery use
Daily reporting in site diaries
Fortnightly checks on adherence to vehicle maintenance protocols and heavy machinery use
Construction Coordinator and Construction Oversight Committee
EXCAVATION/
EXTRACTION DANGERS
TO THE ENVIRONMENT
AND PERSONAL SAFETY
Fill, sand, and gravel extraction or the purchase of these materials from a vendor who extracts them from waterways or ecologically sensitive areas MUST be limited and avoided as much as possible. Where fill, sand, or gravel can be extracted from sources NEITHER in NOR near water bodies or ecologically sensitive areas, then this is an optimal scenario whereby, as much as possible, all extraction should occur to the extent that NEITHER significant vegetation (e.g. trees) is removed NOR are extraction techniques used that would contaminate
Verification from contractor that fill, sand, and gravel to be used for construction are being extracted from sources NEITHER in NOR near water bodies from waterways or ecologically sensitive areas, OR, verification from contractor that fill, sand, or gravel to be used for construction
Monitor adherence to fill/sand/gravel extraction restrictions.
Review of maps, photos, extraction rate, and cost per material extraction site.
Fortnightly checks on adherence to quarrying plans
Fortnightly site visits to quarried areas
Monthly checks on repurposing of materials
Construction Coordinator and Construction Oversight Committee
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
ground water.
WHERE IT IS UNAVOIDABLE that fill, sand, or gravel extraction should occur from waterways or ecologically sensitive areas, the risk of significant environmental impact MUST be minimized by 1) utilizing several points of extraction, 2) employing silt curtains, 3) keeping heavy equipment use within 50m of a sensitive area to a minimum, 4) striking a balance between the negative environmental impact of extracting all material from a site all at once to the cost of extracting small portions of the total numerous times to lessen the environmental shock to an ecological system, and 5) enacting as many material conservation techniques as possible to limit the amount of material needing to be extracted.
Recycle unused construction materials or demolition debris to reduce excavation activities
Cover piles of backfill with plastic sheeting to prevent runoff and use agricultural waste bales or other similar measures around the piles to prevent erosion and sedimentation
Place fencing around on-site excavation areas
Investigate shallower methods for excavation or no excavation at all are being extracted from water bodies or ecologically sensitive areas plus 1) maps of each site where material will be extracted, 2) the expected quantity of material to be extracted per site, 3) the frequency at which material will be extracted per site,
4) multiple photos per site showing the ecological health of the site before, during, and after each extraction, and 5) the monetary cost estimate of extracting material per site as opposed to purchasing and hauling it in from an on-land quarry.
Approximate weight of construction materials or demolition debris repurposed / reused
% of backfill piles NOT covered with plastic sheeting
% of backfill piles WITHOUT erosion control measures in place
Planned and unscheduled site visits
Report from contractor as to use of repurposed materials
Evidence that timber originated from a licensed supplier (picture / photocopy of license, check with relevant Ministry as to license validity)
One-time confirmation of timber supplier license
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
Fill in clay quarries before abandoning, unless community officials plan to repurpose the clay pit and the pit does not create a health and safety risk while awaiting its new purpose
Control runoff into pits to reduce standing water where mosquitos can breed
Avoid, to the extent possible, sourcing timber from unsustainable or unlicensed sources (purchasing timber from a middleman who verifiably sources timber from a licensed business is satisfactory)
% of excavation areas with fencing around them
% of clay removed from previously quarried location
# of clay quarries NOT filled in
# of pits / excavated areas with standing water
% of timber purchased from a proven licensed and sustainable supplier
FIRE CAN DAMAGE OR
DESTROY
INFRASTRUCTURE,
MACHINERY, OR
EQUIPMENT AND CAN
INJURE OR KILL
PERSONNEL
Set fire prevention and management protocols to include training on how to reduce chances of accidental fires and what to do when a fire appears
Keep at least two full buckets of sand within 10m of any potential fire hazard
Keep at least one fire extinguisher on-site at all times with at least one person on site trained in its use
Keep flammable liquids / chemicals locked in a storage unit at all times unless in use
Use fire resistant or fire-retardant materials where fire is a risk instead of normal materials
# of cubic meters (or buckets) of sand to smother fires per laboratory
# of fire extinguishers
# of chemical storage units with fire retardant materials
# of chemical storage units with locking mechanisms
# of staff trained in fire
Site visits
Count fire prevention measures
Review site reports and speak with workers about the number of incidences of fire on site
Monthly Construction Coordinator and Construction
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
prevention techniques
# of incidences of unplanned fires
POTENTIAL WORKER
INJURIES OR ILLNESS
FROM FALLS AND
FALLING OBJECTS,
COLLAPSES AND HEAVY
EQUIPMENT, FLYING
DEBRIS, EXPOSURE TO
TOXICS SUCH AS LEAD,
ASBESTOS, SOLVENTS,
AND CEMENT DUST;
POOR SANITATION;
HEAT STRESS
A written policy regarding worker health and safety and commitment to compliance with host country requirements
All workers receive a safety and health induction that explains safe work practices, the proper use of personal protective equipment (PPE), and their safety and health protections under law
Internal monitoring system to: 1) conduct regular self-inspections of sites against standards, and 2) tracking violations and accidents
Vehicles traveling in communities must adhere to a STC approved speed limit to slow potentially dangerous traffic and install speed humps adjacent to the construction site
Materials hauled in open vehicles must be covered to prevent any material from falling out
Existence of written health and safety policy
# of worker safety trainings conducted
Ratio of personal protection equipment to employed workers
# of postings in local languages around perimeter
# of speed humps installed adjacent to the construction site
# of incidences where open hauling construction vehicles DO NOT cover the materials while in transit
Scheduled site visits
Spot site visits
Interviews with construction manager
Interviews with workers
Review of site meting minutes
Inventory review of personal protection equipment
Fortnightly visits and interviews
Monthly review of personal protection equipment inventory
Quarterly review of training materials and attendance log
Construction Manager and
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
POOR SITE
MANAGEMENT CAN
LEAD TO HEALTH RISKS
FOR WORKERS AND
COMMUNITY MEMBERS
Site boundaries are well-marked and access is actively controlled
Prevent community members from accessing the construction and excavation sites where hazardous obstacles are present (e.g. use of tall opaque plastic fencing, day and/or night guard, etc.)
Ensure privacy, to the extent possible, of neighbors adjacent to construction sites (e.g. use of tall opaque plastic fencing, non-removal of tall vegetation between construction site and compounds, etc.)
Good housekeeping practices are in place to maintain a clean site
Safety signs and posters (at a minimum to mark site boundary, hardhat areas, explosion toxic hazards, etc.)
Smoking is banned altogether or restricted to designated smoking area well away from flammable materials
% of construction perimeter with opaque fencing
# of entrances to construction site
Ratio of entrances controlled with a worker or guard to total number of entrances
On a scale of 1 (extremely dirty) to 10 (extremely clean), rating of site cleanliness
# of warning signs and posters on site
% of total construction workers agreeing not to smoke on-site or near the school
Regular site visit
Walk the perimeter of the construction site
Walk the total area of the construction site to make observations
Monthly Construction Coordinator and Construction Oversight Committee
LACK OF HYGIENE AND
FIRST AID CAN BE
DETRIMENTAL TO
INJURED OR SICK
WORKERS
A first aid kit is on-site and accessible with at least one person always on site that is trained in its use and basic first aid
Drinking water and sanitary facilities are provided (or are easily accessible from the site), including hand-washing stations
Ensure availability of treatment for construction
# of FULL (not empty or lacking) first aid kits on site
# of personnel trained in first aid and first aid kit use
Yes or No access to drinking water and sanitary facilities with handwashing
Site visit
Review any incidences of workers needing to be vaccinated against tetanus
Monthly check up of first aid kit
Quarterly check on first aid training, accessibility of hygienic facilities, and vaccination
Construction Coordinator and Construction
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
workers that receive puncture wounds on site regarding access to a tetanus vaccination. Treatment should be given within 24hrs after exposure stations
% of workers with receiving tetanus vaccinations record (whenever new workers are hired)
INHALATION OF
PARTICULATE MATTER
CAN CAUSE UPPER
RESPIRATORY
INFECTIONS AND
BREATHING PROBLEMS
Limit total hours spent running heavy machinery and diesel engines that create soot
Provide masks capable of filtering out particulate matter of 10 microns to any operator of machinery producing soot or workers debagging cement or workers burning waste
Debag cement at the farthest point from community members and at the warmest time of day (warmer air carries air contaminants higher into the air dispersing the concentration)
Do NOT debag cement or run soot producing machinery when children are nearby
Confined areas where cement debagging, diesel emissions, or emissions from burned waste occur should NOT exceed 150 microns per square meter of 10-micron particulate matter when personnel is in this area WITHOUT appropriate ventilated masks
Burn waste at the warmest part of the day when NO children are nearby at the warmest time of day (warmer air carries air contaminants higher into the air dispersing the concentration)
Existence of protocol for limiting heavy machinery or soot producing equipment
# of hours per week heavy machinery used
# of ventilation masks on site capable of filtering 10 microns of particulate matter
Distance from debagging site to site perimeter
# of incidences of personnel debagging cement WITHOUT appropriate ventilated masks
Average time of day in which cement debagging and waste burning occurs
Review heavy machinery protocols
Review inventory for ventilated masks capable of filtering 10-micron thickness of particulate matter
Scheduled site visits
Interview workers as to use of masks and times of day for operations
Monthly Construction Coordinator and Construction Oversight Committee
INADEQUATE
Hardhats are required whenever flying debris may be generated (as in demolition) or there is a risk of tools
Ratio of hardhats available to employed workers
Review personal protection
Monthly review of inventory
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
PERSONAL
PROTECTION
EQUIPMENT (PPE) CAN
LEAD TO SERIOUS
INJURIES AMONG
WORKERS
or objects falling from heat height or higher
Protective / enclosed footwear (not footwear where toes or parts of the foot are visible AND must have thick soles) are to be worn at all times
Hard-toe boots are to be used by all workers engaged in excavation, demolition, or working around heavy equipment
Respiratory protection must be used when: 1) mixing cement or polishing or cutting concrete or stone (2-strap N95 dust mask or better), 2) a worker desires the use of them (2-strap N95 dust mask or better), and 3) activated-carbon half-mask respirator when using solvents
Hearing protection is mandatory for all workers using powered tools or working in close proximity to these operations
Safety glasses are to be used by all workers engaged in demolition, grinding, cutting, or using power tools, or working in close proximity to these operations
Reflective vests are mandatory for all individuals working in proximity to heavy equipment and during demolition
# of incidences of workers NOT using protective / enclosed footwear on site
Ratio of hard-toe boots to workers involved in excavation, demolition, or working with heavy equipment
Ratio of respiratory protection masks to workers involved in cement debagging, heavy machinery use, solvent use, waste burning, or other activities with chemical emissions
Ratio of hearing protection available to workers involved in using powered tools or in close proximity to such operations
Ratio of safety glass to workers involved in demolition, grinding, cutting, or using power tools or in close proximity equipment inventory
Spot check site visits
Interviews with workers and construction manager
Fortnightly site visits and interviews
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
to these operations
Ratio of reflective vests to workers in proximity to heavy equipment or involved in demolition
LACK OF PROPER
SCAFFOLDING AND
FALL PROTECTION CAN
LEAD TO SERIOUS
INJURY AMONG
WORKERS
Scaffolding must be able to carry at LEAST 4 times its maximum intended load without settling or displacement
Scaffolding must be on solid footing (footing may NOT be boxes, loose bricks or stones, etc.)
Scaffolding has guardrails, midrails, and toeboards Scaffolding inspected EACH DAY by a site manager
Guardrails or at least ropes near the edge of floors and roofs where a drop is greater than 2m (if not possible, workers must wear a body harness and rope) – manager MUST document results of inspection
Trenches are to: 1) have backfill maintained at least 1m back from the trench edge, 2) shore or slope back the trench wall for ANY trench 1.75m or deeper, and
3) provide a means of exit (ladder, stair, ramp) at least every 10m
% of structurally stable scaffolding
% of scaffolding with guardrails, midrails, and toeboards
% of total days of workers on site where a manager inspected scaffolding
# of trenches NOT in compliance with trench safety measures
Scheduled site visits
Review of manager scaffolding documentation inspection of scaffolding and scaffolding documentation
Construction Manager together with Coordinator
POORLY MANAGED
TRENCHES, PITS, AND
QUARRIES CAN LEAD TO
SERIOUS INJURY OF
All backfill maintained at least 1m back from the trench edge
Shore or slope back the trench or pit wall for ANY excavated area 1.75m or deeper
# of incidences where backfill is NOT at least 1m back from the edge of a trench or pit, where trench or pit walls are NOT
Spot checks
Fortnightly visits and checks
Construction Manager together with
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
WORKERS
Provide a means of exit (ladder, stair, ramp) at least every 10m for any excavated area shored up or sloped back, or where a means of escape is not available for deep excavated areas
THE USE OF LEAD PAINT
OR ASBESTOS CAN LEAD
TO SERIOUS HEALTH
RISKS
Neither leaded paint nor asbestos in any form is to be used in new construction
# of incidences of leaded paint or asbestos observed on site
Scheduled site visits
Spot check cans of paint purchased by contractor for containing lead
Interviews with
Spot check paint cans whenever possible on site
Quarterly
Construction Manager
Damage to local habitat, compact soil, and create erosion via building and occupation of construction camps
Appropriate housing SHOULD be available in the community for workers to avoid construction worker camps
IF a construction worker camp is required:
Set a site management plan to reduce negative impacts on the host community entailing security concerns, public health issues, speeding vehicles, waste disposal, energy sourcing, and illegal extraction of natural resources
Keep camp size to a minimum. Require that crew preserve as much vegetation as possible, e.g., by creating defined footpaths
Provide temporary sanitation on site, e.g., pit latrine
Existence of a site management plan
# of incidences of complaints made to or by the Construction Oversight Committee (a group of community members plus the contractor and the IP)
Area of camp
Area of denuded vegetation
Walking the site
Review complaints made to or by the Construction Oversight Committee
Review documentation showing that camp workers have been sensitized on HIV/AIDS and
Fortnightly review of complaints
Monthly inspections
Construction Manager
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
(assuming the water table is low enough, with soil and geology of appropriate composition)
Use local or regional labor, if possible. Request a government health office, a USAID health partner, or other partner organization to sensitize workers as to the symptoms and transmission paths of HIV/AIDS and tuberculosis
Set guidelines prohibiting poaching and collection of plants/wood with meaningful consequences for violation such as termination of employment. Provide adequate quantities of food and cooking fuel; both should be of good quality
All temporary structures MUST be demolished and completely removed once construction activities have ceased
# of latrines constructed
% of latrines constructed and managed as in Section
3.1.2 of this EMMP
Ratio of local labor to total workers employed
% of workers sensitized about HIV/AIDS and tuberculosis
# of incidences of construction workers found to be poaching or illegally collecting plants/wood
% of days in which food and cooking fuel is provided to camp residents (if the contractor provides these items)
% of camp structures remaining when construction is complete tuberculosis symptoms and transmission paths
Improper waste management can be a health hazard to
Receive either a waste handling license from the EAD Director or the District Council to destroy or transport construction waste or a waiver from the
Existence of waste handling license or waiver from the EAD Director or the
Scheduled site visits
Spot checks
Fortnightly inspections and interviews
Construction Manager and
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
workers, the community, and to the environment
EAD Director or the District Council
Set waste management protocols consistent with community and government approved methods
All personnel must be trained in waste management protocol
Minimize number and size of open burn pits
Encircle waste pits with visible warning tape
Separate hazardous waste, reusable waste, and waste designated to be burned from one-another in separate bins or designated waste areas
All personnel handling waste must wear appropriate personal protection equipment (i.e. enclosed footwear, gloves, etc.)
Do NOT leave waste in an open pit overnight, it must be disposed of each day
Do NOT use supplemental fuel to burn waste
Organize collecting bins that separate reusable waste from non-reusable waste
Facilitate separation at the disposal site to improve probability of reuse existence of a letter of approval from the District Council
Existence of waste management protocols
# of incidences where waste management protocols were NOT followed
% of personnel trained in waste management
% of waste pits encircled with warning tape
# of bins / locations designated to separate types of waste
# of incidences of personnel NOT wearing appropriate personal protection equipment when handling waste
# of incidences where waste is found in an open
Review of waste management protocols, training materials, and attendance logs
Inspection of designated waste areas
Interviews with construction manager and workers
Quarterly review of documentation
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
pit at the beginning of work
# of incidences where fuel was used to burn waste
# of bins designated for reusable waste
Improper management of hazardous waste (oils, petrol/gasoline, kerosene, solvents, chemicals, lead acid, etc.) can lead to environmental degradation and be a health risk to workers and beneficiaries
Set protocols for managing / handling hazardous waste
Train workers involved in hazardous waste management in site-specific protocols
Manage hazardous wastes from creation to segregation to safe handling to disposal and to reduction
Designate a safe and lockable location on site to store hazardous materials away from flammable materials or equipment
Safely remove hazardous material and dispose of it at government approved locations
As stockpiles can spontaneously combust, reuse or retread or sell tire waste to remove from site
Existence of protocols for managing / handling hazardous waste
% of workers trained in hazardous waste protocols
# of methods used to safely store hazardous waste
# of times hazardous materials disposed of in government approved locations
Site visit
Review of documentation
Interviews with construction manager and workers
Monthly Construction Coordinator
Improper management of construction waste (old construction materials, logs, Construction waste must NOT be stored or allowed to migrate off site
Construction waste must be separated from other
Approximate weight of construction waste found off-site
Site visit
Estimation of amounts of
Monthly
At end of construction
Construction Coordinator and oversight
OR POTENTIAL
ADVERSE IMPACTS
ENVIRONMENT AND CLIMATE MITIGATION
MEASURE(S) [ADAPTED FROM SEED IEE
CONDITIONS]
MONITORING
INDICATOR(S)
MONITORING
METHOD
MONITORING
AND REPORTING
FREQUENCY
RESPONSIBLE
PARTIES &
ESTIMATED
COSTS
debris, etc.) can lead to environmental degradation and be a health risk to workers and beneficiaries wastes in a designated and secure location on site
De-construct instead of demolishing / destroying construction waste to more easily separate materials for disposal or reuse
Do NOT mix construction waste with soils
No construction waste can be left on site when construction is completed
% of non-construction waste mixed in with construction waste
Approximate weight of construction waste de-constructed
Approximate weight of construction waste left on site once construction is completed construction waste on and off site committee
Improperly designed laboratories that contain hazardous liquids and materials may allow for the degradation of the environment and present a health risk to beneficiaries
Security measures must be taken in establishing a storage unit to safeguard chemicals and combustibles
Protocols for handling hazardous liquids and materials and for emergency situations must be securely affixed in the laboratory
Fire prevention techniques must be incorporated into the design and operation of the laboratory
Existence of protocols affixed in the laboratory for handling hazardous liquids and materials and preventing and resolving emergency situations
# of chemical storage units in laboratories WITHOUT a locking mechanism
# of fire prevention techniques implemented in the laboratory
Site visit
Review of protocols
Inspection of laboratory storage unit
Quarterly Construction
2.1.4 EMMP TABLE FOR MALAWI SEED – XXX SITE – WATER SANITATION AND HEALTH ACTIVITIES
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs
Poor latrine construction / management can lead to increased vectors for diseases
Ensure latrines, wastewater collection, and sewage systems are designed and constructed to WHO and national standards
Use the ventilated improved pit latrine design that traps insect vectors or convert pit latrines to this design when in use on site
Gather data on soil type, slope and topography to determine the potential for significant erosion
Train designated workers and community members on proper use and maintenance of latrines to avoid spills, leaks, and exposure
Devote adequate attention to identifying and addressing social barriers to using latrine
Raise awareness among community members on proper maintenance and cleaning of latrines and on hand washing with soap after using a latrine in line with WHO guidelines
# of latrines, that do NOT meet WHO and national standards
% of latrines that are ventilated improved pit latrines
# of pit latrines constructed on construction sites
# of workers and community members trained in latrine maintenance
# of reports of waste being applied to agricultural fields
# of incidences of reported open defecation near latrines and sanitation facilities
# of community members sensitized as to proper maintenance and cleaning of latrines and handwashing techniques
Inspections of latrines and the site around the latrines
Assessment of the management of latrines
Interviews with workers as to latrine use practices and trainings received
Review documentation of training records inspections
Monthly assessments
Quarterly document review and monitoring for FOUR quarters post-construction (either by government counterparts, coordinated efforts with other USAID partners, or IP contracted monitors) manager and Coordinator
School Management Committee (I[P to work with them)
Changing climate, extreme weather events, and natural disasters can degrade or destroy
Latrine design MUST account for a changing climate, chances of severe weather, and natural disasters
Water supply design MUST account for a changing climate, chances of severe weather, and natural disasters
A completed and engineer approved construction design for latrines and water supply points that address the potential for severe weather and natural
Receipt of draft design
Receipt of final
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs improperly constructed latrines and water sources that would lead to increased health risks disasters
Poor latrine accessibility/ availability can lead pupils to defecate outdoors, to not practice good hygiene, or to not attend school
WHO recommends no more than 25 pupils per latrine
The Government of Malawi allows for a maximum of 60 pupils per latrine IF separate urinals are accessible
As the activity is targets improving education accessibility for adolescent girls and Malawian schools are often overcrowded beyond the planned pupil population, it is recommended a ratio of 20 and 10 female pupils per latrine WITH and WITHOUT urinals, respectively.
# of male and female latrines, separated
# of male and female urinals, separated
Latrine construction documentation review
Count latrines on site
Quarterly
Poor water supply construction/ management can lead to drinking water contamination and health risks to beneficiaries
Obtain a water abstraction Community Activity license from the National Water Resources Authority before water point construction
Set use and maintenance protocols for constructed water points
Provide community awareness to instruct on proper usage and maintenance in collaboration with the School Management Committee
Do NOT allow domesticated animals within 10 meters of drinking water sources
Do NOT allow stagnant water puddles (> 1 liter) within near the water source
Existence of valid license for water abstraction
Existence of use and maintenance protocols
# of community members trained in use and maintenance of the constructed water source
Area around water source secured from animals
# of stagnant water puddles (> than a liter) due to animals within 10 meters of
Receive copy of valid water abstraction license
Review documentation on protocols and trainings
Site visits to inspect water source
When license is submitted
Fortnightly inspection of water source
Quarterly review of documentation and monitoring for FOUR quarters post-construction (government counterparts, coordinated efforts with other USAID partners, or IP contracted
Construction manager together with Coordinator
School Management Committee (with IP guidance)
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs a activity structure
Poor water supply accessibility/ availability can lead to pupils and staff drinking contaminated waters
Ensure WHO recommendations for any water supply built by Implementing Partner are followed: 5 liters of drinking water available per day for each pupil and school staff member1
Determine sustainable withdrawal rates of water resources
Monitor water levels in well boreholes, catchments, or impoundment structures to detect overdrawing
Develop a Water Quality Assurance Plan (WQAP)2 per USAID guidance
Ensure appropriate WQAP monitoring, as this is the responsibility of the IP, occurs throughout the life of the activity either via government counterparts, coordinated efforts with other USAID partners, or IP contracted monitors
Ensure safe levels of arsenic, fluoride, nitrate, and other contaminants as well as the absence of fecal coliform, all per WHO and Malawian government standards
Pump rate (liters per minute)
Water supply regeneration rate (liters per day)
Existence of a WQAP
Select a government approved water testing laboratory to send water samples to
# of incidences where the WQAP was NOT adhered to
# of water quality tests (for each chemical or biological category listed in the WQAP) that VIOLATE WHO’s or the Government of Malawi’s standards
# of water quality tests (for each chemical or biological category listed in the WQAP) that are worse than the initial baseline water quality test
Scheduled pump rate testing
Scheduled multi-day water supply regeneration rate testing
Review WQAP
Review monitoring documentation
Verify the selected water laboratory’s certification
Inspect each water quality testing procedures over the course of the activity
Quarterly checks of the adherence to the WQAP and site inspections and monitoring for FOUR quarters post-construction (government counterparts, coordinated efforts with other USAID partners, or IP contracted monitors)
1 http://www.who.int/water_sanitation_health/publications/wash_standards_school.pdf 2 http://www.usaidgems.org/wqap.htm http://www.usaidgems.org/wqap.htm http://www.who.int/water_sanitation_health/publications/wash_standards_school.pdf http://www.usaidgems.org/wqap.htm
Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from SEED IEE Conditions]
Monitoring Indicator(s) Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties & Estimated Costs
Poor hand-washing accessibility/ availability can lead to unhygienic practices and to the spread of fecal-oral diseases
Hand-washing station must be within 1.5m of latrine exit
Cleansing material (soap, ash, etc.) must be readily accessible and securely connected to hand-washing station to allow for use but prevent thievery
# of incidences where the hand-washing station is NOT within 1.5m of latrine exit
% of handwashing stations WITHOUT secure cleansing material available
Site visit Monthly
Quarterly maintenance checks for FOUR quarters post-construction
Implementing Partner and the School Management Committee
Poor maintenance of soakaway pits can lead to more standing water, contamination of topsoils, and health risk to beneficiaries
Monitor and keep drains and soakaways clear of debris
In areas that continuously have drainage issues, create soakaways or cover with gravel to reduce stagnant water surface area available for disease vectors
Use riprap (cobbled stone), gravel or concrete as needed to prevent erosion of drainage structures
% of soakaways NOT clear of debris or NOT properly maintained
Site visits Monthly
Quarterly maintenance checks for FOUR quarters post-construction (government counterparts, coordinated efforts with other USAID partners, or IP contracted monitors)
Implementing Partner and the School Management Committee
Lack of erosion controls around
WASH
Infrastructure may lead to soil, vegetation, and infrastructure degradation
Implem…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.