72051420R00024 Female Empowerment Activity-FEMPOW_RFP.pdf

PDF 1 MB Posted

Attached to
Female Empowerment Activity - FEMPOW
Solicitation number
72051420R00024
Issued by

About this file

This is a request for proposals from the United States Agency for International Development Colombia seeking proposals from organizations to provide services supporting the Government of Colombia's commitments to gender equality and related policies. USAID anticipates awarding a single hybrid cost-plus-fixed-fee completion indefinite delivery/indefinite quantity contract estimated between $30-40 million to provide services described in the attached performance work statement, with 91% under the cost-plus-fixed-fee portion and 9% for supplemental technical assistance ordered under indefinite delivery task orders. Proposals are due by December 15, 2020, with the period of performance expected to be five years from date of award. Offerors should review submission instructions and requirements in Sections B through M, including performance standards, reporting requirements, and evaluation criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Issuance Date: November 4, 2020 Questions Due Date: November 18, 2020 Questions Due Time: 17:00 Bogota local time Closing Date: December 15, 2020 Closing Time: 17:00 Bogota local time

Subject: Request for Proposals (RFP) No. 72051420R00024, “USAID Female Empowerment (FEMPOW)” Activity

The United States Government, represented by the United States Agency for International Development (USAID)/Colombia, is seeking proposals from U.S. or non-U.S., non-profit or for-profit organizations, to provide services to support the Government of Colombia (GOC) in its commitments to promote gender equality, and improve the implementation of gender-related polices and services as described in the attached Request for Proposals (RFP).

Authorized Principal Geographic Code for this solicitation is 937 – Default. NAICS Code for this solicitation is 541990 – All Other Professional, Scientific and Technical Services.

USAID anticipates awarding a single Hybrid - Cost plus Fixed Fee (CPFF) Completion - Indefinite Delivery, Indefinite Quantity Contract (IDIQ) contract. The Total Estimated Cost-Plus Fixed Fee for services under this contract (CLIN 001 & CLIN 002) is estimated to fall within the range of $30 million to $40 million. This procurement will be conducted under Full and Open Competition procedures, pursuant to Part 15 of the Federal Acquisition Regulation (FAR) (48 CFR Chapter 1). Please refer to Section L for information regarding proposal requirements.

Offerors should take into account the expected delivery time required by the proposal transmission method they choose, and they are responsible for ensuring proposals are received at USAID by the due date and time as specified in Section L. Failure to comply with the submission date and time will deem any submission unacceptable and it will not be reviewed or evaluated. Faxed proposals are not acceptable, nor will they be reviewed or evaluated.

Section L of the RFP sets forth all instructions for the preparation and submission of required proposal contents, including critical dates/times for the submission of questions, and the proposal submission closing date and time. Section M states the criteria by which proposals will be evaluated.

This RFP in no way obligates USAID to award a contract or the task order portion nor does it commit USAID to pay any cost incurred in the preparation and submission of a proposal. Award of a Contract under this RFP is subject to availability of funds and other internal USAID approvals.

USAID expects that offerors will have equal access to all local organizations needed to implement this contract and strongly discourages exclusivity agreements with local organizations.

This RFP can be viewed and downloaded from beta.sam.gov USAID bears no responsibility for data errors resulting from transmission or conversion processes. Further, be aware that amendments to solicitations are occasionally issued and will be posted on the same website from which you downloaded the solicitation. USAID advises to regularly check the above website for amendments.

Interested firms can register and use the Interested Vendor List (IVL) accessible through this solicitation on beta.sam.gov., so that firms can contact one another for consideration of teaming arrangements and/or small business subcontracting opportunities in response to this solicitation.

Sincerely, Heather Wirick Contracting Officer USAID/Colombia http://www.fbo.gov/

72051420R00024

SOLICITATION, OFFER AND AWARD

4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

ORDER UNDER DPAS (15 CFR 700)

6. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

NEGOTIATED (RFP)

SEALED BID (IFB)

5. DATE ISSUED

1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES

1 148

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

10. FOR

INFORMATION

CALL:

CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the

SOLICITATION

9. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

11. TABLE OF CONTENTS

18. OFFER DATE17. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

15C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

15B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

14. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)

(See Section I, Clause No. 52.232.8)

13. DISCOUNT FOR PROMPT PAYMENT

designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

28. AWARD DATE

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print)

CODE 24. ADMINISTERED BY (If other than Item 7)

ITEM

(4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by government)

CODE

11/04/2020 X

720514

USAID/Colombia Office of Acquisition & Assistance Unit 3030, Box 5101

DPO, AA 34004

34004

1700 R 12/15/2020

Angela Garcia +57 6 anggarcia@usaid.gov or hwirick@usaid.gov127-5413

X

X

X

X

X

X

X

X

X

X

X

X

X

PAGE(S)

Heather Wirick

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (Rev. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____0_________ calendar days (60 calendar days unless a different period is inserted

Table of Contents

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. PURPOSE

B.2. CONTRACT TYPE AND SERVICES

B.3. ESTIMATED COST, FIXED FEE AND OBLIGATED AMOUNT

B.4. CONTRACT BUDGET AND CEILINGS

B.5. OTHER DIRECT COST LIMITATIONS UNDER CLIN 002

B.6. LEVEL OF EFFORT

B.7. INDIRECT COST

B.8. CEILING ON INDIRECT COST RATES

B.9. COST REIMBURSABLE

B.10. MULTI-YEAR CONTRACT

SECTION C – PERFORMANCE WORK STATEMENT

C.1. TITLE OF ACTIVITY

C.2. SPECIAL CONSIDERATIONS

C.2.1. Grants under Contracts

SECTION D – PACKAGING AND MARKING

D.1. AIDAR 752.7009 MARKING (JAN 1993)

D.2. BRANDING IMPLEMENTATION PLAN AND MARKING PLAN

SECTION E – INSPECTION AND ACCEPTANCE

E.1. NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

E.2. INSPECTION AND ACCEPTANCE

E.3. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

SECTION F – DELIVERIES OR PERFORMANCE

F.1. NOTICE LISTING CLAUSES INCORPORATED BY REFERENCE

F.2. PERIOD OF PERFORMANCE

F.3. PLACE OF PERFORMANCE

F.4. PERFORMANCE STANDARDS

F.5. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

F.6. AUTHORIZED WORKDAY/WEEK

F.7. REPORTS AND DELIVERABLES

F.7.1. Rapid Mobilization Plan (RMP) F.7.2. Annual Work Plan (AWP) F.7.3. Activity Monitoring, Evaluation and Learning Plan (AMELP) F.7.4. Quarterly Performance Reports F.7.5. Quarterly Financial Reports F.7.6. Accruals Report F.7.7. Monthly bullets F.7.8. Quarterly newsletter F.7.9. Schedule of Events F.7.10. Annual Performance Report F.7.11. Final Report F.7.12. Special Reports and Memoranda F.7.13. Other Materials F.7.14. Meetings and Meeting Notes F.7.15. Grants Manual F.7.16. Emergency Contact Plan F.7.17. Security Plan F.7.18. Environmental Management Approach (EMA)

F.7.19. Annual Inventory F.7.20. Data Management Plan (DMP) F.7.21. Close-Out Plan

F.8. REPORTING AND DELIVERABLES MATRIX

F.9. FIXED FEE PAYMENT SCHEDULE [CLIN 001]

F.10. KEY PERSONNEL

SECTION G– CONTRACT ADMINISTRATION DATA

G.1. AIDAR 752.7003 DOCUMENTATION FOR PAYMENT (NOV 1998)

G.2. CONTRACTING OFFICER – CONTRACTING OFFICER’S REPRESENTATIVE

G.3. CONTRACTOR’S PRIMARY POINT OF CONTACT

G.4. PAYING OFFICE

G.5. ACCOUNTING AND APPROPRIATION DATA

G.6. CONTRACTOR’S PAYMENT ADDRESS

G.7. ACCEPTANCE AND APPROVAL

G.8. CONTRACTING OFFICER'S AUTHORITY

G.9. TECHNICAL DIRECTION/RELATIONSHIP WITH USAID

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

H.2 AIDAR 752.7007 PERSONNEL COMPENSATION (JUL 2007)

H.3 ADDITIONAL REQUIREMENTS FOR PERSONNEL COMPENSATION

H.4 AUTHORIZED GEOGRAPHIC CODE

H.5 DEFENSE BASE ACT INSURANCE

H.6 EXECUTIVE ORDER ON TERRORISM FINANCING

H.7 ELECTRONIC PAYMENTS SYSTEM

H.8 SUBMISSION OF DATASETS TO THE DEVELOPMENT DATA LIBRARY (DDL) (OCTOBER 2014)

H.9 GRANTS UNDER CONTRACTS (GUC)

H.10 USAID-FINANCED THIRD-PARTY WEB SITES (NOVEMBER 2017)

H.11 TRANSITION OF KNOWLEDGE, SKILLS AND ABILITIES

H.12 FOREIGN GOVERNMENT DELEGATIONS TO INTERNATIONAL CONFERENCES

H.13 PROHIBITION OF ASSISTANCE TO DRUG TRAFFICKERS

H.14 NONEXPENDABLE PROPERTY PURCHASES AND INFORMATION TECHNOLOGY RESOURCES

H.15 CONFIDENTIALITY AND OWNERSHIP OF INTELLECTUAL PROPERTY

H.16 ENVIRONMENTAL COMPLIANCE

H.17 EXCHANGE VISITORS AND TRAINING

H.18 GOVERNMENT FURNISHED FACILITIES OR PROPERTY

H.19 INHERENTLY GOVERNMENTAL AND CLOSELY ASSOCIATED FUNCTIONS

H.20 PERFORMANCE MANAGEMENT INFORMATION SYSTEM

H.21 PRESS RELATIONS

H.22 SECURITY CONDITIONS

H.23 LIFE SUPPORT AND SECURITY SERVICES

H.24 TITLE TO AND CARE OF PROPERTY

H.25 USAID/COLOMBIA COMMUNICATIONS AND OUTREACH REQUIREMENTS

H.26 ORDERING SUPPLEMENTAL TECHNICAL ASSISTANCE (CLIN 002)

PART II - CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.2 752.252-2 AIDAR SOLICITATION PROVISIONS INCORPORATED BY REFERENCE MAR 2015)

I.3 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (JUN 2020)

I.4 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

I.5 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

I.6 52.216-18 ORDERING (AUG 2020) (APPLICABLE TO CLIN 002 ONLY)

I.7 52.216-19 ORDER LIMITATIONS (OCT 1995)

I.8 52.216-22 INDEFINITE QUANTITY (OCT 1995) (APPLICABLE TO CLIN 002 ONLY)

I.9 52.216-24 LIMITATION OF GOVERNMENT LIABILITY (APR 1984)

I.10 52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)

I.11 52.229-8 TAXES – FOREIGN COST-REIMBURSEMENT CONTRACTS

I.12 52.244-2 SUBCONTRACTS (JUNE 2020)

I.13 52.247-1 COMMERCIAL BILL OF LADING NOTATIONS. (FEB 2006)

I.14 52.247-67 SUBMISSION OF TRANSPORTATION DOCUMENTS FOR AUDIT. (FEB 2006)

PART III – DOCUMENTS AND OTHER ATTACHMENTS

J.1. STATEMENT OF OBJECTIVES (SOO)

J.2. SECTION 889 RULE GUIDANCE

J.3. DIGITAL ECOSYSTEM COUNTRY ASSESSMENT (2020)

J.4. WOMEN’S ECONOMIC EMPOWERMENT INFOGRAPHIC

J.5. USAID/COLOMBIA GENDER ANALYSIS AND ASSESSMENT (2019)

J.6. MASATUGO REPORTS

J.7. PRIVATE SECTOR ENGAGEMENT GUIDANCE

J.8. BRANDING AND MARKING TEMPLATE

J.9. CONTRACTOR PERFORMANCE REPORT - SHORT FORM

J.10. BIOGRAPHICAL DATA SHEETS

J.11. SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE

J.12. AMELP TEMPLATE

J.13. AMELP GUIDANCE

J.14. BUDGET GUIDANCE AND TEMPLATE

J.15. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) TEMPLATE

J.16. NON-U.S. ORGANIZATION PRE-AWARD SURVEY GUIDELINES AND SUPPORT

J.17. ACRONYMS LIST

J.18. BASELINE STUDY SUMMARY OF THE SOCIAL AND INSTITUTIONAL TOLERANCE TOWARDS

VIOLENCE AGAINST WOMEN IN COLOMBIA

J.19. BASELINE STUDY SUMMARY OF THE LEGAL ENABLING ENVIRONENT FOR WOMEN’S

EMPOWERMENT IN COLOMBIA

J.20. INITIAL ENVIRONMENTAL EXAMINATION (IEE)

PART IV – REPRESENTATION AND INSTRUCTIONS

SECTION K– REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1. NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

K.2. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)

K.3. 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

K.4. 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-REPRESENTATION.

(DEC 2019)

K.5. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

K.6. 52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2020)

K.7. 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS CERTIFICATION (JUL

2020)

K.8. 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (JUN 2020)

K.9. 52.230-7 PROPOSAL DISCLOSURE—COST ACCOUNTING PRACTICE CHANGES (APR 2005)

K.10. INSURANCE - IMMUNITY FROM TORT LIABILITY

K.11. SIGNATURE

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1. NOTICE LISTING CLAUSES INCORPORATED BY REFERENCE

L.2. 52.216-1 TYPE OF CONTRACT. (APR 1984)

L.3. 52.233-2 SERVICE OF PROTEST. (SEP 2006)

L.4. WAIVERS UNDER FAR PART 4.2101 PROHIBITION ON COVERED TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES AND EQUIPMENT

L.5. GENERAL INSTRUCTIONS TO OFFERORS

L.6. GENERAL SUBMISSION INSTRUCTIONS

L.7. INSTRUCTIONS FOR THE PREPARATION OF THE TECHNICAL PROPOSAL

L.7.1. General Instructions L.7.2. Format, Page Limitation and Content L.7.3. Performance Work Statement L.7.3.1. Overall Technical Approach L.7.3.2. Local Capacity Development L.7.3.3. Sustainability and Vulnerable Population Engagement L.7.4. Management Approach L.7.4.1 Key Personnel L.7.4.2 Management Approach and Capacity L.7.5. Past Performance L.7.6. Quality Assurance and Surveillance Plan (QASP), L.7.7. Branding Implementation Plan and Marking Plan L.7.8. Development in a Digital Age (DECA)

L.8. INSTRUCTIONS FOR PREPARATION OF THE COST/BUSINESS PROPOSAL

SECTION M – EVALUATION FACTORS FOR AWARD

M.1. METHOD OF EVALUATION

M.2. TECHNICAL EVALUATION CRITERIA

M.2.1 Performance Work Statement/Technical Approach M.2.1.1 Overall Technical Approach M.2.1.2 Local Capacity Development M.2.1.3 Sustainability and Vulnerable Population Engagement M.2.2 Management Approach M.2.2.1 Key Personnel M.2.2.2 Management Approach and Capacity M.2.3 Past Performance

M.3. COST ANALYSIS/COST REALISM ANALYSIS

M.3.1 CLIN 001

M.3.2 SUPPLEMENTAL TECHNICAL ASSISTANCE (CLIN 002)

M.4. DETERMINATION OF COMPETTIVE RANGE

M.5. CONTRACTING WITH SMALL BUSINESS CONCERNS

M.6. SOURCE SELECTION

ATTACHMENTS AND OTHER DOCUMENTS

J. 1 – STATEMENT OF OBJECTIVES (SOO)

J.9 - PAST PERFORMANCE REPORT – SHORT FORM

J.17 -ACRONYMS LIST

72051420R00024 – Female Empowerment (FEMPOW) Activity SECTION B

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. PURPOSE

The purpose of this contract is to provide the services described in the Performance Work Statement (PWS) to implement the “USAID Female Empowerment (FEMPOW)” Activity (henceforth ‘the Activity’), as described in Section C.

B.2. CONTRACT TYPE AND SERVICES

This is a FAR 16.102(b) combination award consisting of a Cost-plus Fixed Fee (CPFF) Completion (CLIN 001) and a single-award Indefinite Delivery/Indefinite Quantity (IDIQ) type contract (CLIN 002) for the purpose of providing supplemental technical assistance.

Under the Cost plus Fixed Fee (CPFF) portion of the contract, which represents 91% of the total estimated cost, (CLIN 001), the Contractor must furnish all personnel, materials, equipment, supplies, facilities, services (except as expressly set forth in this contract as furnished by the U.S.

Government (USG)) and perform all activities necessary for, or incidental to, the performance of work described in Section C and other sections of the contract not specifically identified under CLIN 002 as the IDIQ Supplemental Technical Assistance.

Under the IDIQ portion of the contract, which represents 9% of the total estimated cost, (CLIN 002), the Contractor must furnish additional supplemental technical assistance arising out of or related to the completion portion of the contract as required by USG-issued Task Orders. The services will be ordered in accordance with Section H.26 entitled, “IDIQ Supplemental Technical Assistance Ordering Procedures (Applicable to CLIN 002)” and the IDIQ clauses in Section I will apply. As this CLIN is part of this contract and not a stand-alone award, the USG is not required to state or order any minimum number of person-days as otherwise provided in the FAR 16.504(a)(1)). CLIN 001 contained in this contract provides sufficient consideration to make this a legally binding contract, and the USG has no obligation to fund or place orders under CLIN 002.

For the consideration set forth below, the Contractor must achieve the performance objectives and deliverables or outputs described in Sections C and F, and otherwise comply with all contract requirements.

B.3. ESTIMATED COST, FIXED FEE AND OBLIGATED AMOUNT

The Total Estimated Cost (TEC) for CLIN 001 and CLIN 002 is [TBD].

a. Estimated Cost and Fixed Fee for CLIN 001

The Total Estimated Cost for this CLIN is [TBD], exclusive of fixed fee, if any. The fixed fee, if any, is [TBD]. The estimated Cost-Plus-Fixed-Fee if any is [TBD].

b. Estimated Cost and Fixed Fee for CLIN 002

The total estimated ceiling cost of this CLIN is [TBD], exclusive of the associated maximum fee of [TBD]. The total estimated ceiling cost and maximum fee is [TBD].

c. Payment of Fixed Fee

CLIN 001: Pursuant to FAR 16.306(d), the fixed fee payable under CLIN 001 and will be tied to the conditions and completion of the deliverables specified in Section F.9 of this contract and in accordance with the amounts in B.3.a.

CLIN 002: Payment of the corresponding fixed fee for each Task Order will be negotiated at the task order level upon receipt of a proper invoice and must directly correspond to the percentage of level of effort being paid. In no event, the fixed fee of the Task Orders under CLIN 002 can exceed the negotiated fee under CLIN 001.

d. Amount Obligated

CLIN 001: Within the estimated cost plus fixed fee (if any) specified in paragraph a) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor (and payment of fee, if any) for performance hereunder is [TBD]. The Contractor must not exceed the aforesaid obligated amount nor will the United States Government (USG) be responsible for costs incurred should the Contractor do so.

Funds obligated hereunder are anticipated to be sufficient through [TBD].

B.4. CONTRACT BUDGET AND CEILINGS

CLIN 001

Activity Costs $TBD Grants under Contract $TBD Total Costs $TBD Fixed Fee $TBD Total Estimated Cost-Plus Fixed Fee $TBD

CLIN 002

Activity Costs $TBD Maximum Fee $TBD Total Ceiling $TBD Total Estimated Cost-Plus Fixed Fee CLIN 001 and CLIN 002: $TBD

B.5. OTHER DIRECT COST LIMITATIONS UNDER CLIN 002

The estimated cost of this CLIN includes estimates for material, equipment, subcontracts, travel, and training required for performance of the total amount of work that can be ordered by the government under this CLIN during the life of this contract. The amount of ordered Other Direct costs will not exceed $1,000,000.00.

B.6. LEVEL OF EFFORT

a. In performing Government orders for Technical Assistance under CLIN 002, the Contractor is obligated to provide up to a maximum of 4,000 person-days.

b. The fee set forth in B.3 is based upon furnishing the level-of-effort specified in paragraph (a). The total estimated cost and fixed fee will be established in the individual Government-issued Task Order and will not exceed the amounts set forth in Section B.4.

B.7. INDIRECT COST

The contract clause entitled “Allowable Cost and Payment (AUG2018)”, FAR Subpart 52.216-7, specifies that the indirect cost rates must be established for each of the Contractor’s accounting periods which apply to this contract. Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs shall be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases:

Description Rate Base Type Period

[TBD] [TBD] 1/ 1/ 1/

[TBD] [TBD] 2/ 2/ 2/

[TBD] [TBD] 3/ 3/ 3/

1/ Base of Application:

Type of Rate:

Period:

2/ Base of Application:

Type of Rate:

Period:

3/ Base of Application:

Type of Rate:

Period:

B.8. CEILING ON INDIRECT COST RATES

a. For each of the Contractor’s accounting periods during the term of this contract, the parties agree as follows:

1. The distribution base for establishment of final overhead rates is

2. The distribution base for establishment of final G&A rates is

b. The Contractor will make no change in its established method of classifying or allocating indirect costs without the prior written approval of the Contracting Officer.

c. Reimbursement for indirect costs shall be at final negotiated rates, but not in excess of the following ceiling rates for each fiscal year:

Indirect Cost Type FY 21 FY 22 FY 23 FY24 FY 25 (contractor’s FY)

1. [TBD] _____ _____ _____ _____ _____

2. [TBD] _____ _____ _____ _____ _____

3. [TBD] _____ _____ _____ _____ _____

d. The government is not obligated to pay any additional amount on account of indirect costs above the ceiling rates established in the contract. This advance understanding will not change any monetary ceiling, cost limitation, or obligation established in the contract.

B.9. COST REIMBURSABLE

Allowable costs shall be limited to reasonable, allocable, and necessary costs determined in accordance with FAR 52.216-7, Allowable Cost and Payment, FAR 52.216-8, Fixed Fee, if applicable, and AIDAR 752.7003, Documentation for Payment.

B.10. MULTI-YEAR CONTRACT

This contract is considered non-severable and is therefore a multi-year contract as defined in FAR

17.103. Therefore, this contract is subject to the requirements of FAR 17.106.

Cancellation Dates:

Contract Year 2: Date______ Amount: $______ Contract Year 3: Date______ Amount: $______ Contract Year 4: Date______ Amount: $______ Contract Year 5: Date______ Amount: $______

Cancellation Ceiling: This is a CPFF Completion type contract plus an IDIQ portion where the contractor is authorized to be reimbursed for all costs which are allowable in accordance with FAR 52.216-7, “Allowable Costs and Payment.” Therefore, the contractor will not incur any costs which would have been amortized over the life of the contract should the contract be cancelled in accordance with FAR 52.217-2. The cancellation ceiling for each cancellation date is indicated above.

[END OF SECTION B]

72051420R00024 - Female Empowerment (FEMPOW) Activity SECTION C

SECTION C – PERFORMANCE WORK STATEMENT

C.1. TITLE OF ACTIVITY

USAID Female Empowerment (FEMPOW) Activity (hereafter also referred to as the “Activity”).

[The successful Offeror’s proposed Performance Work Statement (PWS) in response to the Statement of Objectives included in Attachment J.1 will become Section C in the resultant contract followed by the sections below. Instructions are found in Section L.]

C.2. SPECIAL CONSIDERATIONS

C.2.1. Grants under Contracts

This Contract allows the establishment of a Grants under Contracts (GUCs) component, as provided in Section H.9. The GUCs mechanism does not have a fixed budget amount but will not exceed $8,000,000.00 within CLIN 001.

The purpose of the Grants under Contract (GUC) component is to: [To be completed by the Offeror if GuCs are proposed in its PWS]

GUCs will seek to: [To be completed by the Offeror if GuCs are proposed in its

PWS]

To manage local grants, the Contractor will develop and administer a Grants- Under-Contract system. The Grants-Under-Contract element must comply with all applicable provisions of ADS 302.3.4.13

[END OF SECTION C]

72051420R00024 - Female Empowerment (FEMPOW) Activity SECTION D

SECTION D – PACKAGING AND MARKING

D.1. AIDAR 752.7009 MARKING (JAN 1993)

a. It is USAID policy that USAID-financed commodities and shipping containers, and project construction sites and other project locations be suitably marked with the USAID emblem.

Shipping containers are also to be marked with the last five digits of the USAID financing document number. As a general rule, marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semi-finished products which are not packaged.

b. Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the cognizant technical office indicated on the cover page of this Contract, or by the Mission Director in the Cooperating Country to which commodities are being shipped, or in which the project site is located.

c. Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors.

d. A copy of any specific marking instructions or waivers from marking requirements is to be sent to the Contracting Officer; the original should be retained by the Contractor.

D.2. BRANDING IMPLEMENTATION PLAN AND MARKING PLAN

The cover page of all report deliverables required in Section F must include the USAID Identity (or the name of the Agency written out) prominently displayed, the Contract number (see the cover page of this Contract), Contractor name, name of the responsible USAID office, the publication or issuance date of the document, document title, author name(s), Activity number, and Activity title, “USAID Female Empowerment Activity - FEMPOW”. Descriptive information is required whether Contractor-furnished products are submitted in paper or electronic form. All materials shall include the name, organization, address, and telephone/fax/internet number of the person submitted the materials.

The Contractor must comply with the requirements of the USAID “Graphic Standards Manual” available at www.usaid.gov/branding or any successor branding policy. The Contractor must follow the approved Branding Implementation and Marking Plan submitted on [date TBD] and incorporated into this Contract as Attachment [TBD].

ATTACHMENT J.8 contains the Branding and Marking template.

[END OF SECTION D]

http://www.usaid.gov/branding

72051420R00024 - Female Empowerment (FEMPOW) Activity SECTION E

SECTION E – INSPECTION AND ACCEPTANCE

E.1. NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

In accordance with FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract, the following contract clauses are hereby incorporated by reference, with the same force and effect as if they were given in full text. See https//acquisition.gov/far/index.html for electronic access to the full text of a clause.

FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)

NUMBER TITLE DATE

52.246-5 INSPECTION OF SERVICES-COST-REIMBURSEMENT APRIL 1984

E.2. INSPECTION AND ACCEPTANCE

USAID inspection and acceptance of services, reports and other required deliverables or outputs will take place at USAID/Colombia or at any other location where the services are performed and reports and deliverables or outputs are produced or submitted. The COR listed in Section G has been delegated authority to inspect and accept all services, reports and required deliverables or outputs.

E.3. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The progress, success, and impact of the Contractor’s performance under this contract will be monitored and evaluated as a part of the overall activity results. The QASP is a management tool with the intent of encouraging maximum performance, efficiencies, and cost effectiveness by the Contractor and can be modified at any time by the Government. The QASP will be used as a Government document to enforce the inspection and acceptance clauses of the contract. The QASP proposed by the winning offeror will be incorporated in this section after award. The QASP may require revision after selection for award to reflect the Contractor’s known strengths and weaknesses. This is intended to be a “living” document that will be reviewed and updated on an annual basis. It is based on the premise that the Contractor, not the Government, is responsible for managing and ensuring that quality controls meet the terms of the contract. The Government reserves the right to modify performance standards and/or metrics during the life of this contract, in order to ensure that the right outcomes are being assessed and that the performance standards are appropriate. The COR will ensure that the QASP is implemented and updated. A variety of mechanisms may be used to monitor the progress/success of the activity and the Contractor’s performance:

a. Meetings during contract implementation

b. Monthly progress review meetings

c. Review of Contractor’s scheduled reports (See Section F.7)

d. Feedback from stakeholders https://www.acquisition.gov/browse/index/far https://docs.google.com/document/d/1s9VVP9YMq4Gwx28laFjeoFlvyNXBe3ER/edit#heading=h.1hmsyys

72051420R00024 - Female Empowerment (FEMPOW) Activity SECTION E

e. Site visits by USAID personnel

f. Quarterly reviews of work plan with performance milestones

g. Periodic impact evaluations

[END OF SECTION E]

72051420R00024 - Female Empowerment (FEMPOW) Activity SECTION F

SECTION F – DELIVERIES OR PERFORMANCE

F.1. NOTICE LISTING CLAUSES INCORPORATED BY REFERENCE

In accordance with FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract, the following contract clauses are hereby incorporated by reference, with the same force and effect as if they were given in full text. See https//acquisition.gov/far/index.html for electronic access to the full text of a clause.

FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)

NUMBER TITLE DATE

52.242-15 STOP-WORK ORDER AUG 1989

52.242-15 ALTERNATE I APR 1984

F.2. PERIOD OF PERFORMANCE

a. The period of performance for this contract is five (5) years from [TBD] to [TBD].

b. The period of performance for CLIN 001 is five (5) years from [TBD] to [TBD].

c. The ordering period for Task Orders under CLIN 002, the IDIQ portion of this contract, is from [TBD] to [TBD].

d. Task Orders (CLIN 002) may be issued at any time during the ordering period and must end by [TBD].

Although TOs may be issued during the ordering period provided in paragraph c. above, the maximum period of performance for individual Task Orders will be no more than five years and not exceed the end date provided in paragraph d. above. For example, TOs issued in years 1 and 2 may have a five-year performance period whereas the TOs issued in years 3, 4 and 5 may have less than a five-year period given the end date provided in paragraph d. above.

F.3. PLACE OF PERFORMANCE

Performance of CLIN 001 of this contract and task orders issued under CLIN 002 hereunder will be in Colombia (514).

F.4. PERFORMANCE STANDARDS

Evaluation of the Contractor's overall performance will be conducted on an annual basis jointly by the COR and the CO and will form the basis of the Contractor's permanent performance record with regard to this contract. The following general performance standards will form the basis of the evaluation for the Contractor Performance Assessment Report (CPAR):

a. Quality of Product and Service

b. Schedule

c. Cost Control

d. Management

e. Regulatory Compliance

f. Small business subcontracting (as applicable)

g. Other (as applicable) (e.g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report in accordance with contract terms and conditions, defective cost or pricing data, terminations, suspension, and debarments).

Evaluations will be tailored to the contract type, size, content, and complexity of the requirement.

F.5. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The COR and CO will also evaluate on an annual basis the contractor’s adherence to the performance standards included in the Quality Assurance Surveillance Plan (QASP) included in Section E.3.

F.6. AUTHORIZED WORKDAY/WEEK

No overtime or premium pay is authorized under this Contract.

For overseas employees: The work week for the Contractor’s overseas employees must not be less than forty (40) hours and will be scheduled to coincide with the work week of the employees of USAID/Colombia. Holidays taken by Contractor overseas employees may not exceed those of the U.S. Mission in Colombia, as published annually.

Non-overseas employees: The length of the Contractor’s U.S. non-overseas employee’s workday will be in accordance with the Contractor’s established policies and practices and will not be less than eight (8) hours per day and forty (40) hours per week.

Short-Term Technical Assistance: STTA personnel are authorized a six (6) day workweek with prior written concurrence of the COR.

F.7. REPORTS AND DELIVERABLES

In addition to the requirements set forth in Section C, and in accordance with AIDAR 752.242-70, Periodic Progress Reports, the Contractor must submit reports, deliverables or outputs as further described below to the COR. All reports and other outputs must be in the English language, unless otherwise specified by the COR. See also AIDAR 752.211-70, Language and Measurement (June 1992), which is incorporated by reference into this contract.

All Activity outputs and deliverables will be submitted to the COR in an electronic format and are subject to written final approval and acceptance by the COR and/or the CO. Work Plans and Reports will align with the U.S. fiscal year. Hard copies may be requested on a case-by-case basis as deemed appropriate by the COR. Electronic versions of the reports will be submitted using unlocked Microsoft Word, Excel, or Portable Document Format, or PowerPoint software.

Additionally, all data generated under this contract will be reported in accordance with USAID’s Open Data policies as described in Section H under “submission of Datasets to the Development data Library (DDL)”.

F.7.1. Rapid Mobilization Plan (RMP)

The RMP shall include a plan for a rapid start-up of activities covering the first 90 days of the contract. The RMP must describe the Contractor’s plan to ensure timely establishment of its office(s). It shall also address benchmark technical, management, and logistical (vehicle, office space, etc.) requirements that include planning and schedule for the prompt mobilization of the Chief of Party (COP) and other key personnel.

Due Date RMP: 2 weeks after award.

F.7.2. Annual Work Plan (AWP)

The annual work plan (AWP) details how the Contractor will use the work plan year effectively to achieve the award’s objectives. The AWP serves as a detailed guide to program implementation and once approved, represents an agreement as to the nature and timing of discrete tasks and interventions. Discrete tasks include training events, workshops, and seminars, learning events, outreach events, and information dissemination activities such as publications and reports. It is essential that the AWP be concise so as to ensure that it will be a simple reference tool for the implementer to track progress against the approved implementation schedule, and for USAID to monitor and evaluate performance through the work plan year and to ensure that award objectives are accomplished on time, on budget, and in accordance with expectations. Each AWP will form the basis for an annual management review conducted by USAID and program staff to assess program directions, priorities, achievements, and prior year implementation results, as well as management and implementation impediments, and to make recommendations for revisions.

Annual work plans will identify a logical sequence of steps to be undertaken to implement each program component and must include an associated timetable. The Contractor may not include interventions in the AWP that fall outside the parameters of the Performance Work Statement (PWS).

The AWP, at a minimum must include:

1. Proposed interventions, accomplishments, and progress towards achieving results for the given year.

2. Corresponding schedule depicted on a Gantt chart and level of effort required to complete the interventions.

3. Description and estimate of amounts of short-term technical assistance, training, and other support resources that would be required to provide the assistance proposed.

4. Detailed budget for implementation including illustrative budget breakdown per proposed intervention.

5. The anticipated outputs and outcomes from each intervention conducted.

6. A Gender and vulnerable populations strategy addressing how gender and vulnerable populations will be integrated into the design and implementation of strategies that encourage and include women and vulnerable groups (indigenous persons, Afro Colombians, persons with disabilities and the LGBTI community). At a minimum, the strategy must address major existing inequalities and a plan to guard exacerbating against these.

7. The identification of any assumptions used in preparing the work plan, as well as suggested alternatives if necessary and the methods to assess whether the assumptions hold true.

8. The anticipated risks with regard to achieving the anticipated objectives of the contract and how they will be mitigated.

9. Any specific award terms or conditions that interfere with maximizing the developmental impact of the award.

10. The strategies and approaches the activity will adopt in coordinating and collaborating with other USAID activities/projects, relevant host country governments and other line agencies, local governments and other relevant stakeholders implementing projects in the same geographic locations; and

11. Updated QASP.

The first AWP will cover the period from the Contract effective date through the end of the next U.S. fiscal year (i.e. through September 30, 2021). Subsequent AWPs will cover the Activity from October 1 through September 30. If acceptable, the COR will provide a written approval of the final AWP to the Contractor. Failure to have an approved AWP in place may be viewed as a failure to comply with essential terms and conditions of the contract. Significant deviations to the approved AWP will require the additional prior written approval of the COR (and may require a revision to the approved AMELP. The AWP must not exceed 20 pages.

First AWP Due Date: 60 calendar days after award.

AWP for proceeding years: 45 days before the end of the fiscal year.

F.7.3. Activity Monitoring, Evaluation and Learning Plan (AMELP)

The Contractor is required to have an Activity Monitoring, Evaluation and Learning Plan (AMELP) capable of tracking and documenting progress against the Activity objectives and results. The AMELP reflects the award progress over the life of the Activity and is a critical tool for planning, managing, documenting, and evaluating performance. The AMELP must be reviewed and validated annually, and revised when appropriate in consultation with the COR.

The AMELP will describe the monitoring, evaluation and learning tasks for the Activity, the composition of staff/personnel needed to carry out such tasks with the level of effort and costs, and an overview of the strategy that will be used to track progress towards achieving the desired results. The Contractor will use the Theories of Change (TOC)) methodology as the basis to develop a comprehensive AMELP that will track progress towards achieving the desired results, meeting annual and life of activity targets.

The AMELP must include a full description of how the data and information will be collected, analyzed, and used, based on data quality standards referenced in ADS 203. The Contractor must ensure that the contract’s AMELP focuses not only on quantitative reporting of outputs, but also gathers qualitative information. In addition, the Contractor will provide twelve (12) performance indicators with its correspondent Performance Indicator Reference Sheets (PIRS) to describe data sources, methodologies, frequency of and people responsible for data collection, as well as baselines for each of the indicators and annual targets.

Indicators for the activity as a whole can be drawn from the Standard Foreign Assistance Indicators. If one of such indicators is selected the same standard PIRSs must be used so that the results can be aggregated at the Colombia Mission level. The Contractor may further define a “precise definition” according to the Activity’s context in the standard PIRSs as appropriate.

However, the precise definition must be within the scope of the indicator’s standard definition.

When selecting indicators, the Contractor must consider the relevance and accuracy of the indicators according to the planned interventions and intended results, as well as time and resources required to collect and report each indicator data.

The Contractor must include for all person indicators, data segregated by sex, but also where possible, by vulnerable groups. The AMELP will show how baseline measurements will be established and how the impact of proposed interventions will be assessed.

Ultimately, the Contractor, in collaboration with the COR, USAID/Colombia Program Office and/or M&E Specialist, will verify that the proposed indicators are consistent with and meet the data collection needs of USAID’s Project Monitoring, Evaluation and Learning Plan and the Mission’s Performance Management Plan (PMP). USAID/Colombia may provide some higher-level indicators at the Project (DO) level, that the Contractor will be required to track to support USAID/Colombia overall evaluation of the Activity’s impact. After the receipt of USAID/Colombia comments, the Contractor must revise and submit a final version within 10 calendar days for COR approval.

The AMELP will include:

1. A Results Framework (RF) or a Logical Framework (LF) that reflect the objectives described in the award;

2. The indicators that will be used to assess progress towards the Activity goal, purpose, and sub-purpose; It must include both USAID Standard Foreign Assistance indicators as well as customized indicators developed specifically for the Activity;

3. Monitoring and evaluation structures and functions;

4. Detailed Performance Indicators Reference Sheet (PIRS) for each indicator;

5. Plan for dissemination/sharing and use of M&E data;

6. The sources, method, frequency and limitation of data collection, review, analysis and reporting;

7. Data entry, storage, and security plan;

8. The parties responsible for data collection and management;

9. The baseline data or the plan and timeline for gathering the baseline data for each indicator;

10. The estimated cost associated with implementing this AMELP;

11. Annual and tentative life of project targets for each indicator;

12. The Data Quality Assessment (DQA) plan and procedures;

13. An Evaluation Plan, if applicable, and how the internal and/or external evaluation results will be used to inform project implementation (learning and adapting);

14. In order to better represent the results of Activity interventions, in the AMELP, the

Contractor must identify which indicators lend themselves to geographic representation and report accordingly.

15. Coordination with others for monitoring and evaluation tasks (as applicable)

16. Capacity building in monitoring and evaluation (as applicable)

17. Plan for specific reviews, evaluations and studies;

18. Annexes to the AMELP may include a schedule for performance monitoring tasks, indicators tracking table, indicator reference sheets, and any additional M&E tools and guidance as relevant to the Activity.

Report in MONITOR - Mission-wide Monitoring Management Information System

(MIS)

Once the AMELP is approved by the COR, the Contractor must register in USAID/Colombia MONITOR System the following:

1. Activity information (Summary, start/end dates, objective, budget, geographical coverage, target population, etc.)

2. Sub-activity information (Summary, start/end dates, objective, budget, geographical coverage, target population, classification), etc. A sub-activity is understood as an effort within the Activity, carried out either directly by the contractor or by its sub grantees/Subcontractors. The sub-activity should have a clear purpose, USAID resources, indicators and targets linked to the Activity’s AMELP and an environmental determination (categorical exclusion or Environmental management plan).

3. AMELP indicators (PIRS Information).

Draft AMELP Due Date: 60 calendar days after award.

Final AMELP Due Date: 90 calendar days after award.

F.7.4. Quarterly Performance Reports

The Contractor will submit brief quarterly performance reports to reflect progress and activities of the preceding quarter. The report must describe the tasks completed in the last quarter relative to what was anticipated by the approved AWP and will assess overall Activity’s impact to date relative to the performance indicator targets.

Quarterly performance reports will present progress on all Activity interventions and will include the following information, at a minimum:

1. Brief outline of Activity purpose and Activity approach.

2. Overall status of Activity progress towards objectives (narrative).

3. Status of overall Activity progress per the approved indicators as defined in the AMELP, and if relevant the targets set out for the reporting quarter.

4. Summary of completed interventions and progress towards results under the contract during the timeframe of the report.

5. Status of progress in implementation of the Gender Strategy and the Communications and

Outreach Plan.

6. List of services/deliverables completed in the reporting period.

7. Explanation of quantifiable outputs of the tasks, if appropriate and applicable.

8. Reasons why established targets were not met, if applicable; the reports will highlight any issues or problems affecting the schedule or impact of services provided by the Contractor.

9. Description of any short-term consultants’ progress and observations, identifying any significant issues, and a description of follow-on interventions.

10. Status of budget expenditures, analysis of any cost overruns or high unit costs, available funding for the remainder of the activity and any variances from planned expenditures.

11. Identification of problems, delays or adverse conditions that impair the ability to meet the objectives of the award, including a statement of the action taken or contemplated, and any assistance needed to resolve the situation.

12. List of major interventions planned for the next quarter.

13. List of indicators with targets for the next quarter (as relevant).

14. The use of Small and Disadvantaged Business relative to the target identified.

15. Projected USAID approvals, waivers or deviation requests anticipated during the next quarter.

16. The status of required audit processes including for sub-awardees, if applicable.

17. Success stories (if available) in the proper USAID format and a brief analysis on the general economic context.

18. Status of implementing the conditions of the IEE

Due Dates:

USG Fiscal Year Q1: October 1 to December

Quarterly Report and Financial Report due January 31

USG Fiscal Year Q2: January 1 to March 31 Quarterly Report and Financial Report due April 30

USG Fiscal Year Q3: April 1 to June 30 Quarterly Report and Financial Report due July 31

USG Fiscal Year Q4: July 1 to September 30 Annual Report and Financial Report, due October 31

F.7.5. Quarterly Financial Reports

The contractor will submit quarterly expenditure reports concurrently with the Quarterly Technical Reports. The Quarterly Financial Report must contain a summary page that reflects cumulative spending by line item for both quarter and life of activity, followed by a detailed breakdown of all spending under each line category, to include:

1. Total funds obligated to date by USAID into the contract.

2. Total funds previously reported as expended by the Contractor by main line items.

3. Total funds expended in the current quarter by the Contractor by main line items.

4. Total unliquidated obligations by main line items.

5. List of significant expenses incurred during the period; and

6. Activity expenditures in the next quarter.

The Contractor is solely responsible for not exceeding obligated amounts and is reminded of the required notification to the CO as to the percentage of funds expended against the total obligated and available amount as set forth in FAR 52.232-22 “Limitation of Funds.”

Due Dates:

USG Fiscal Year Q1: October 1 to December

Quarterly Report and Financial Report due January 31

USG Fiscal Year Q2: January 1 to March 31 Quarterly Report and Financial Report due April 30

USG Fiscal Year Q3: April 1 to June 30 Quarterly Report and Financial Report due July 31

USG Fiscal Year Q4: July 1 to September 30 Annual Report and Financial Report, due October 31

F.7.6. Accruals Report

The Contractor must submit a spreadsheet showing cumulative disbursements and estimated (undisbursed) accruals to the COR.

Quarterly Accrual Reports must contain the following information:

● Total Estimated Cost remaining in the contract;

● Unliquidated balance in the contract;

● Accrual amount; and

● Estimated Pipeline amount.

Due Dates: 20 calendar days before the end of each U.S. Fiscal Year quarter.

F.7.7. Monthly bullets

The Contractor must submit concise bullets in English to the COR describing key activities undertaken within that month period and describing their impact, due on the 15th of every month.

Due Date Monthly Bullets: the 15th of every month

F.7.8. Quarterly newsletter

This newsletter must be written in English and Spanish. The newsletter must cover the activity’s events, as well as topics of interest related to producers and markets.

This is the start of the file's text. The full file is on GovTribe.