Attachment J.18.4
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEBANON WATER PROJECT
FROM COMMITMENT TO ACTION
ACTION PLANS OF MUNICIPAL UNIONS
JUNE 2017
This publication was produced for review by the United States Agency for International Development. It was prepared by DAI Global LLC.
LEBANON WATER PROJECT
FROM COMMITMENT TO ACTION
ACTION PLANS OF MUNICIPAL UNIONS
Program Title: Lebanon Water Project
Sponsoring USAID Office: Lebanon
Contract Number: AID-268-N-15-00001
Contractor: DAI Global LLC (DAI)
Date of Publication: June 12, 2017
Author: Lebanon Water Project
The authors’ views expressed in this publication do not necessarily reflect the views of the United States
Agency for International Development or the United States Government.
i
CONTENTS
CONTENTS .................................................................................................................. I
ACRONYMS................................................................................................................. V
INTRODUCTION
THE LEBANON WATER PROJECT
OBJECTIVES OF THE REPORT
THE CHARTER
BACKGROUND
THE COMMITMENT
The Charter process
The Charter signatory unions and municipalities
THE ACTION
Multi-stakeholders meetings
CHALLENGES
MAINTAINING THE MOMENTUM
FINDINGS
Overview
SELECTED PROJECTS
BACKGROUND
SELECTION CRITERIA
PRIORITY PROJECTS
ANNEX A – BOUHAIRA NEEDS
THE BOUHAIRA UNION OF MUNICIPALITIES
Projects Overview
Municipality of Kefraiya
Municipality of Joubb Jannine
Municipality of El Qaraaoun
Municipality of Khirbet Qanafar
Municipality of Lala
Municipality of Baaloul
Municipality of Yohmor
Municipality of Sohmor
Municipality of Ain el Tineh
Municipality of Saghbine
Municipality of Bab Mareh
Municipality of Aitanit ii
Municipality of Ain Zebde needs
Municipality of Zellaya
Municipality of Qelia
Municipality of Libbaya
Municipality of Maidoun
Municipality of Machghara
ANNEX B – AL SAHEL NEEDS
THE AL SAHEL UNION OF MUNICIPALITIES
Projects Overview
Municipality of Aammiq
Municipality of Aana
Municipality of Ghazze
Municipality of Haouch el Harime
Municipality of Kamed El Loz
Municipality of EL Khiara
Municipality of Manara
Municipality of Mansoura
Municipality of El Marej
Municipality of El Raouda
Municipality of Saouiri
Municipality of Sultane Yaacoub
ANNEX C – CENTRAL BEQAA NEEDS
THE CENTRAL BEQAA UNION OF MUNICIPALITIES
Projects Overview
Union Level Needs
Municipality of Bouarej
Municipality of Qabb Elias
Municipality of Makse
Municipality of El Mraijet
Municipality of Barr Elias
Municipality of Majdel Aanjar
Municipality of Aanjar
ANNEX D – CAZA ZAHLEH NEEDS
THE CAZA ZAHLEH UNION OF MUNICIPALITIES
Projects Overview
Municipality of Ablah
Municipality of Chtaura
Municipality of El Fourzol
Municipality of Hazerta
Municipality of Niha
Municipality of Taalabaya
Municipality of Saadnayel iii
ANNEX E - THE SIGNED CHARTER
ANNEX F – ATTENDANCE SHEETS
v
ACRONYMS
BWE Beqaa Water Establishment
CDR Council for Development and Reconstruction
Charter Charter for the Protection of the Litani River
Du Dunum
ELARD Earth Link & Advanced Resource Development
ESFD Economic and Social Fund for Development
NGO Non-Governmental Organization
LEA Lebanese Environmental Action
LEPAP Lebanon Environnemental Pollution Abattement Project
LM Linear Meter
LRA Litani River Authority
LWP Lebanon Water Project
MoE Ministry of Environment
MoEW Ministry of Energy and Water
NGO Non-Governmental Organization
STP Sewage Treatment Plant
TBD To Be Determined
USAID United States Agency for International Development
USD United States Dollar
UV Ultra-Violet
WASH Water Sanitation and Hygiene
WW Wastewater
INTRODUCTION
THE LEBANON WATER PROJECT
The Lebanon Water Project (LWP) is a five-year activity funded by the United States Agency for International Development (USAID) with the overarching objective of increasing access to clean, reliable, and sustainable sources of drinking water for Lebanese Citizens. LWP is focused on improving Lebanon’s capacity in the management of water resources, enhancing the efficiency and sustainability of the public water utilities, and addressing water challenges arising from the impact of the Syrian Refugee influx to Lebanon. The project provides technical and capital assistance to relevant stakeholders and counterparts in order to enhance the performance of the water sector in Lebanon. LWP also promotes better water governance as means to help ensure long-term preservation of the Lebanon’s water resources.
LWP’s Objectives
LWP’s objectives include the three specific results defined below.
Improve service delivery and resource management capacity by the five public water utilities. LWP will strengthen the managerial and operational functions of the water utilities, while making the necessary infrastructure upgrades. The project will support the Government of Lebanon’s water sector strategy to further empower public utilities as legitimate water and wastewater services providers.
Improve civic engagement in water management and advance citizens’ perception of water utilities’ role in providing a necessary and valuable service. The project will promote reform at the policy and regulatory level. This will be a bottom-up approach that strengthens the role of civil society to effectively contribute and participate in democratic water governance. LWP will also increase water users’ awareness and sense of ownership, improve citizens’ responsibilities vis-à-vis water service providers, and promote citizens’ roles and responsibilities with regard to protection of the environment.
Improve private sector involvement in water management. LWP will promote private sector involvement in water management. The project will identify potential areas for public private and business-to-business partnerships to promote water supply service improvements, and develop and fund innovative water conservation technologies.
OBJECTIVES OF THE REPORT
“From Commitment to Action” this report describes the multi-stakeholder development process of the Charter for the Protection of the Litani River (Charter) and consolidates action plans developed by the four unions of municipality signatories of the Charter, namely Al Bouhaira, Al Sahel, Central Beqaa, and Zahleh Cazas in the Beqaa Governorate. Action plans cover water, wastewater, and infrastructure projects in addition to “soft” interventions on awareness raising and capacity development always in relation to water.
The document supports local and regional planning, and resource mobilization to improve the sustainable management of water, the provision of related services, and reduce pollution at the local, union, and regional levels. Municipalities working in the Beqaa region can use this document to support planning needed for interventions in water and wastewater, and their lobbying and resource mobilization efforts with donors and institutions (public and private). It also serves as the basis for creating a partnership with the Beqaa Water Establishment (BWE) with clear needs and projects.
THE CHARTER
BACKGROUND
One of the objectives of LWP is to engage civil society and municipalities in the protection and sustainable management of water resources. Over the years, the lack of waste treatment facilities has turned the main Lebanese river, the Litani River, into a pollutant-loaded stream that carries liquid and solid waste from municipal, industrial, and agricultural sources. Seepage from the Litani River has led to the pollution of groundwater and reduced its availability for domestic and irrigation use. River water that was previously safe for drinking and bathing has become unusable. Odors emanating from the Litani River are a nuisance and the river’s pollution has been linked to public health issues. In the summer, irrigation water pumped from the Litani River contaminates soil and crops. In addition, economic activities around the river (e.g., tourism, food services, leisure, etc.) have come to a complete halt.
Unsustainable use of water, mainly for irrigation, has also negatively influenced the quantity of water in the river. Farmers tend to overuse surface water, thus increasing reliance on groundwater.
In order to protect the Litani River, the Ministry of Environment (MoE) has teamed with the Litani River Authority (LRA) to develop a roadmap for the protection of the Litani River in 2013. The roadmap has five main pillars:
Wastewater
Industrial waste
Solid waste
Agriculture pollution
Governance
A steering committee that meets on a monthly basis follows up on the implementation of the roadmap. It includes representatives from line ministries, agencies, and municipalities. Municipalities do not play a strong role in this steering committee, although they are directly affected.
A strong partnership between municipalities and the BWE will improve the provision of water services to consumers. Municipalities and stakeholders can support BWE in improving subscription rates and payment of fees, in protecting and monitoring resources and networks, in reporting of breakdowns and changes in quantity and quality of water, and in raising the awareness of consumers for the sustainable use of water and its protection. In case of emergencies, municipalities can also share the costs of repairs and maintenance.
To strengthen the role of municipalities and other stakeholders in planning and managing water resources along the Litani River, and to strengthen the partnership between municipalities and BWE, LWP held a meeting on July 11, 2016 with the heads of three municipal unions to discuss potential interventions to protect the Litani River. These three unions included Al Sahel, Al Bouhaira and Central Beqaa. The heads of unions proposed the creation of a charter that establishes a code of conduct for municipalities to protect the Litani River. This initiative reflected a strong municipal commitment to manage water and reduce the pollution in the Litani River in a feasible and sustainable manner.
Figure 1 - Mobilizing Municipalities
THE COMMITMENT
THE CHARTER PROCESS
Further to the meeting with the three heads of unions, LWP prepared a preliminary draft structure of the Charter for the Protection of the Litani River Basin.
On August 8, 2016, at the Chtaura Park Hotel, municipalities and other stakeholder members of the unions gathered in working groups and discussed, elaborated, and amended the draft. BWE was represented at the meeting by its highest authority, Director General Maroun Mousallem. The LRA was represented by Mr. Mohammad Younes the head of the Rural Development Division. Copies per union were signed by member municipalities.
The Charter was discussed with a fourth Union, the Union of Zahleh Caza, following the meeting of August 8, 2016. Five municipalities of that Union subsequently signed the Charter.
To reinforce the regional nature of the Charter, an official ceremony was held on August 18, 2016 at the Chtaura Park Hotel, where the four heads of the municipal unions signed the final Charter in the presence of signatory municipalities. Both regional authorities, BWE and LRA, were also present in this signing ceremony to re-emphasize the importance of this initiative.
The process for developing the Charter has ensured commitment and full engagement by the municipalities and stakeholders in taking on board the sustainable use of water and the protection of the Litani River.
THE CHARTER
The goal of the Charter was to capture the risks from wastewater, solid waste, and unsustainable water management on the Litani River and its basin and respond with measures that will contribute to reducing pollution and enhancing the environmental, hydrological, and economic statuses of the river and its basin.
The objectives of the Charter include the following:
Improving the quality of the water in the Litani and the environmental status of its basin
Making the Litani Basin a model area
Providing locals with clean water Flourishing economic development in agriculture, tourism, and environment
Figure 2 - Drafting the Charter
Figure 3 - Drafting the Charter
These objectives will be accomplished through enactment of the following:
Enforcement of Laws
Environmental Monitoring of the Litani Basin
Economic Development
Awareness Raising
Resource Mobilization
The objectives also included a Charter Steering Committee currently made up of the four heads of unions. This committee will ensure that the Charter is being implemented.
The full text of the Charter in Arabic and English is provided in Annex E.
Figure 4 - The charter signed by the 28 municipalities
SIGNATORY UNIONS AND MUNICIPALITIES
Twenty-eight (28) municipalities signed the Charter in August 2016. However, the Charter allows for its adoption by additional municipal unions, municipalities, and other stakeholders. The Charter has been adopted and signed by 28 municipalities. However, the door is still open for the rest of the municipalities around the Litani basin to join the initiative and sign the Charter committing to its principles and actions.
This was the first time local authorities have come together to sign a commitment to protect the Litani Basin. Four unions have pledged to do everything in their power to protect the water of the Basin. Local authorities felt empowered to voice out concerns regarding the Litani Basin.
This initiative has garnered attention and support from the donor community because it demonstrated the readiness and commitment of the concerned municipalities to conserve and protect the Litani Basin water.
The current signatories are listed below by union followed by the municipalities. Other unions or municipalities may join in the future.
Union of Al Sahel
1. Ghazze
2. El Khiara
3. Kamed El Loz
4. El Raouda
5. Saouiri
6. Aana
7. El Manara
8. Mansoura
9. Soultane Yaaqoub
10. Amiq
11. El Marej
Union of Central Bekaa
1. Makse
Figure 5 - Charter Signature Ceremony
2. Bouarej
3. Barr Elias
4. Anjar
5. Majdel Aanjar
6. Mraijet
Union of Caza Zahleh
1. Hazerta
2. Ablah
3. El Fourzol
4. Taalabaya
5. Niha
Union of Bouhaira
1- El Qaraaoun 2- Khirbet Qanafar 3- Joubb Jannine 4- Lala 5- Baaloul 6- Saghbine
THE ACTION
MULTI-STAKEHOLDERS MEETINGS
Multi-stakeholders meetings were organized with each of the four unions. The objective of the meetings was to gather municipalities, Non-
Governmental Organizations (NGOs), farmers, and industrialists in the same union to discuss risks to the Litani River and the availability of water in light of the tremendous pressure host communities are facing.
The meetings included specific presentations on the Roadmap for the Protection of the Litani River
Basin and the Water and Wastewater (WW) Master Plan for the Beqaa developed under the USAID funded LWWSS. The multi-stakeholders meetings were the best platform for the communities to express their needs for projects in water, wastewater, irrigation, and storm water drainage in addition to soft interventions such as awareness raising and capacity development. The action plans reflect an expanded scope of interventions that goes beyond protecting the Litani River from pollution to actions that will support the sustainable water use.
They also allowed LWP to introduce participants to available mechanisms that can be used as potential solutions to their needs. This is why the meetings included specific presentations to introduce the Litani Protection Roadmap, the Lebanon Environment Pollution Abatement Project (LEPAP), the Lebanese Environmental Action (LEA) incentives of Central Bank, and incentive rebate programs for farmers and industrialists under LWP. The purpose of introducing these mechanisms was to further confirm the role of local governments and civil society in protecting water as a precious resource and to enhance their link with central government where help can be provided and supported.
Figure 6 - Charter Signature
In preparation for the meetings, the LWP team reviewed the water and wastewater masterplans for the Beqaa prepared by USAID and used the Needs Assessment for Communal Water Services with a Focus on Host Communities report prepared by LWP in order to collect and reference information on already identified interventions in each concerned municipality. The collected information served as background to the discussions of working groups that took place during the meetings.
During the meetings, representatives of municipalities and other stakeholders (industrialists, farmers, civil society, and academics) identified, proposed, and prioritized projects that meet their needs under the identified sectors: water, wastewater, irrigation, storm water drainage, and awareness raising and capacity building for the sustainable management and protection of water. The municipalities and stakeholders were asked to prioritize their needs in the same five sectors as listed above.
Based on the projects proposed by the municipalities and information collected, LWP developed a draft action plan that aligns real local needs with existing assessments and master plans. In its next step, LWP met with each municipality and obtained detailed information on its proposed projects in order to create a list of priority projects and budget estimates.
CHALLENGES
Similar to any such wide participation initiative “The Charter” and consequent “Action Plans” development process had to overcome the following challenges.
1. Getting the commitment of municipalities without agreed upon financial support. By signing the Charter, municipalities committed to protect the Litani River through enforcing laws, monitoring water quality and quantity, raising awareness, and lobbying for the implementation of projects that support the sustainable management of water resources. Their commitment was not dependent on any USAID financial support. It stemmed from their conviction of the need and will, to act within their capabilities.
2. The scarcity of accurate information. Accurate data is required to properly assess and estimate costs of identified projects. Some municipalities had detailed designs of networks, reservoirs, wells, etc. Most had “guesstimates”, while others barely had project titles. The LWP team worked with the municipalities to obtain accurate data by triangulating several sources of information and seeking information at the local level, from either municipal councils, local stakeholders, or site visits.
Figure 8 - Multi-Stakeholder Meetings
Figure 7 - Identifying projects
[VALUE], [PERCENTAGE]
[VALUE], [PERCENTAGE]
[VALUE],
[PERCENTAGE]
[VALUE], [PERCENTAGE] [VALUE], [PERCENTAGE]
DISTRIBUTION OF PROJECTS BY BUDGETS
Water
WW
Stormwater
Irrigation
Soft
MAINTAINING THE MOMENTUM.
Following the agreement, LWP reached with the unions in July 2016, actual work with municipalities began in August 2016. The action plans were completed in January 2017. The process was progressive and included the following steps:
1. Holding preparatory meetings with the unions of municipalities.
2. Developing a draft Charter.
3. Organizing two multi-stakeholder meetings to discuss and approve the Charter.
4. Organizing the Charter Signature Ceremony.
5. Conducting an extensive desk review of available reports.
6. Organizing four multi-stakeholders meetings to discuss risks and develop action plans.
LWP followed-up with all 44 municipalities, including the ones who did not sign the Charter, to validate data and information on identified projects in the action plans. This extensive effort took place between August 2016 and January 2017 in order to maintain the momentum and establish a reliable process to move the commitment in the Charter to action through the action plans. These action plans are now the most concrete and solid tool allowing relevant municipalities to seek funding.
FINDINGS
OVERVIEW
One hundred twenty eight (128) projects were identified. These projects require a budget of approximately $84,000,000 for implementation. The projects are divided into 5 categories: wastewater, water (potable), irrigation, stormwater, and soft interventions.
Figure 10 - Distribution of Projects by Budget
Figure 9 - Project Identification
Figure 11 - Project Breakdown by Union
Union Sector No. of Projects Investments in
USD
Total
Investments in
USD
Bouhaira
Water Projects 22 17,890,800
51,799,100
Wastewater
Projects
18 29,630,800
Irrigation Projects 10 2,202,500
Stormwater
Projects
6 2,075,000
Sahel
Water Projects 9 4,645,000
15,601,600
Wastewater
Projects
10 9,204,800
Stormwater
Projects
6 1,751,800
Central Bekaa
Water Projects 9 3,820,000
10,150,100
Wastewater
Projects
9 4,455,600
Irrigation Projects 3 395,000
Stormwater
Projects
5 1,439,500
Soft Projects 4 40,000
Zahleh
Water Projects 4 1,370,000
6,172,160
Wastewater
Projects
7 4,197,160
Irrigation Projects 2 420,000
Stormwater
Projects
1 100,000
Soft Projects 3 85,000
SELECTED PROJECTS
BACKGROUND
LWP has constraints and limited financial resources that prevent it from being able to finance all the projects identified in the action plans. For this reason, a shortlist of priority projects was created based on a set of criteria detailed in the next section. LWP’s implementation of shortlisted projects will depend on the availability of project financing. In cooperation with BWE and municipal unions, the complete list of projects will be available to other donors and executing agencies for potential implementation.
SELECTION CRITERIA
The shortlist has been divided into high, medium, and low priority projects. The selection and prioritization criteria included the following:
Cooperation with BWE. Cooperation between BWE and municipalities is a key criterion for LWP to support projects within a specific municipality. The list of target municipalities was reviewed with BWE in order to identify municipalities with a record of cooperation with BWE. Municipalities that did not cooperate or managed their own water resources were removed from the shortlist.
Protection and Conservation. The main objective of the Charter is the protection of the Litani.
Wastewater related projects were given high priority, when they including an operating WWTP.
Water distribution projects were also given priority when they increased cooperation with BWE and have the potential to reduce non-revenue water.
High Project Impact. Within the high priority projects category, projects were separated into three sets with the highest priority given to Litani River Basin protection projects, primarily wastewater networks to be connected to existing treatment plants.
PRIORITY PROJECTS
LWP has identified nine high priority projects based on the above selection criteria. The overall budget required for the implementation of these interventions is approximately $5,037,600. To further facilitate selection and implementation, LWP has segregated these nine projects into three sets, each consisting of three projects.
Below is the list of selected projects for potential financing by LWP:
1. Set One: Immediate action to protect the Litani River Basin and reduce the wastewater load currently dumped in the Litani River. These “Set One” projects pertain to the installation of wastewater networks that will be connected to the Joubb Jannine WWTP. Currently, this treatment plant is not operating at maximum capacity and additional discharge will optimize its operation.
These interventions will target 24,636 Lebanese residents and 34,976 Syrian refugees. The estimated budget for the following projects is $3,097,600.
a. Kherbet Qanafar Wastewater Network
Kherbet Qanafar is home to 4,620 Lebanese citizens and 961 Syrian refugees. The village needs a wastewater network of 2,330 LM to protect the Khreizat Spring from contamination. The network will be connected to the Joubb Jannine WWTP. Estimated budget required for this project is $466,000.
b. Joubb Jannine Wastewater Network
Joubb Jannine is home to 10,016 Lebanese citizens and 30,000 Syrian refugees. The village needs a wastewater network of 2,935 LM. The network will be connected to the Joubb Jannine WWTP.
Estimated Budget required for this project is $587,000.
c. Kamed El Loz Wastewater Network
Kamed El Loz is home to 10,000 Lebanese citizens and 4,015 Syrian refugees. The village needs a wastewater network of 5,400 LM. The network will be connected to the Joubb Jannine WWTP.
Estimated budget required for this project is $1,080,000.
2. Set Two: These projects would contribute to protection and conservation of ground and surface water. These interventions will target 37,526 Lebanese citizens and 29,778 Syrian refugees. Estimated budget required for these projects is $800,000.
a. Qabb Elias Wetland
This project consists of the constructing a wetland to treat part of the wastewater from Qabb Elias, Makse, and Mraijat. The location of the wetland will be determined once negotiations with landowners are completed. This wetland will treat part of the wastewater currently dumped into the Litani River and will serve as a showcase for constructed wetlands. The treated wastewater from the wetland will be reused for irrigation by farmers in surrounding areas. Estimated budget required for this project is $375,000.
b. PV Solar System for Ablah WWTP
Ablah is home for 9,653 Lebanese citizens and 1,700 Syrian refugees. This project consists of installing a photovoltaic solar power system to reduce operation costs (mainly fuel) of the existing WWTP in Ablah. This system will ensure sustainability of the operation of the WWTP.
A UV disinfection system will be included to allow treated wastewater use for irrigation. The UV system will contribute to the conservation of ground water by providing a sustainable water source for irrigation other than that extracted from private wells. Estimated budget required for this project is $350,000.
c. Irrigation System for Ablah
This project will target water demand management and conservation in Ablah. Currently, 30 farmers in the village of Ablah irrigate from private wells. Installing a drip irrigation system and connecting it to the existing pond would reduce the amount of water pumped from private wells and therefore preserve groundwater. Estimated budget for this project is $75,000.
3. Set Three: Projects in this set meet two objectives:
Reducing non-revenue water by improving the image of BWE and thus increasing water subscriptions.
Providing water for underprivileged communities.
These projects will target a community of 10,608 Lebanese citizens and 2,775 Syrian refugees.
Estimated budget for this project is $ 1,140,000.
a. Water Reservoir in Manara
Manara is home to 4,600 Lebanese citizens and 874 Syrian refugees. A new reservoir in this village will assist BWE in reducing its non-revenue water by increasing water supply and therefore increasing subscriptions. Estimated budget for this project is $200,000.
b. Well Equipment, Reservoir, and Connections in Makse
Makse is home to 4,000 Lebanese citizens and 1,500 Syrian refugees. Equipping a well, constructing a reservoir, and the needed connections between the well and the reservoir will provide water to a vulnerable village where water is becoming a scarce resource. This project will also help reduce non-revenue water by increasing subscriptions according to BWE. Estimated budget for this project is $590,000.
c. Water Reservoir and Connections in Niha
Niha is home to 2,000 Lebanese citizens and 401 Syrian refugees. Constructing a water reservoir and its connections will provide water for Niha and Ablah as specified by BWE. Accordingly, around 13,700 citizens and refugees in both villages will benefit from the project. This will help BWE increase subscriptions in both villages, especially Niha. Estimated budget required for this project is $350,000.
Recommended Projects Summary
Figure 11 provides a summary to the projects that will be considered by LWP. The final decision will be based on available LWP budget.
Figure 11 - Recommended Projects Summary
Project Set Project Title Project Budget in
USD
Total Budget in USD
Set One
Kherbet Qanafar Wastewater Network
466,000
2,133,000 Joubb Jannine
Wastewater Network 587,000
Kamed El Loz Wastewater Network
1,080,000
Set Two
Qabb Elias Wetland 375,000
800,000 PV Solar System for
Ablah WWTP 350,000
Irrigation System for Ablah
75,000
Set Three
Water Reservoir in Manara
200,000
1,140,000 Well Equipment, Reservoir, and Connections in Makse
590,000
Water Reservoir and Connections in Niha
350,000
Project Identification
ANNEX A – BOUHAIRA NEEDS
THE BOUHAIRA UNION OF MUNICIPALITIES
The union of Bouhaira was founded in July 12, 1979. It is located in the West Beqaa District of the Beqaa Governorate. It covers a geographic area 20,132 Ha. The union includes 18 municipalities: Kefraiya, Joubb Jannine, El Qaraaoun, Khirbet Qanafar, Lala, Baaloul, Yohmor, Sohmor, Ain el Tineh, Saghbine, Bab Mareh, Aitanit, Ain Zebde, Zellaya, Qelia, Libbaya, Maidoun, and Machghara. Six of the 18 municipalities signed the Litani Protection Charter.
The total Lebanese population of the union is approximately79,000, while its Syrian refugee population is estimated at 43,800.
The predominant economic sector in Bouhaira is agriculture and agro-food industries.
PROJECTS OVERVIEW
The next table provides a summary of the projects proposed by the Bouhaira municipalities. They are segregated by type, and listed with an estimated budget for each type.
Type Total No. of
Projects Total Budget in US $
Water Projects 22 17,890,800
Wastewater Projects 18 29,630,800
Irrigation Projects 10 2,202,500
Stormwater Projects 6 2,075,000
Total 56 51,799,100
The following section provides a detailed listing of the Bouhaira Union of Municipalities divided by each of the municipalities under the union. These projects are the result of the respective multi-stakeholders’ meeting and were further fine-tuned through consultations the LWP team conducted with the union and respective municipalities.
MUNICIPALITY OF KEFRAIYA
Kefraiya identified needs for water and wastewater projects. The village suffers from lack of access to water. Therefore, water interventions dominated their plans and included water networks, a water reservoir, and the construction of an artesian well. Kefraiya also needs a wastewater network that can be connected to the Joubb Jannine wastewater treatment plant.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 3,488 LM 222 2,441 405 523,200
Water reservoir
Water connections m3
LM
2,441 2,441 405 185,000 1- Water connections are needed to connect the reservoir to the network
2- Water source for this reservoir is Ain Al Naqayer and it has been tested
Artesian Well
Water
Unspecified
Unit
2,441 2,441 405 375,000 Water connections are needed to connect the well to the water network.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
2,000 LM 50 2,441 405 400,000 Wastewater network in Kefraiya is connected to the Joubb Jannine
WWTP.
MUNICIPALITY OF JOUBB JANNINE
Joubb Jannine was classified by the UN agencies as one of the most vulnerable localities in Lebanon. The municipality identified needs for water, wastewater, irrigation, and stormwater projects. The most pressing needs for the village are currently the water and wastewater projects (water networks, rehabilitation of an artesian well and a water reservoir, and wastewater connections). Pertaining to wastewater, it is important to note that Joubb Jannine hosts one of the Beqaa regional wastewater treatment plants. When the proposed WW network in the table below is completed it can be connected to the plant and the full village would be covered.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 4,595 LM 10,016 10,016 30,000 689,250 1- Might be financed by the Kuwaiti fund 2- As reported by
BWE
management to be under CDR commitments.
Rehabilitate an artesian well
1 Unit 10,016 10,016 30,000 60,000 This was reported as done by BWE, however there is a rented well in the village that supplies water whenever BWE falls short. The municipality is requesting the rehabilitation of this well.
Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water reservoir
Connections to the reservoir
10,016 10,016 30,000 825,000 Might be financed by the Kuwaiti fund.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
2,935 LM 10,016 10,016 30,000 587,000
Irrigation
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Installing solar system for farmer's well with pumps
3 Units 10,016 10,016 30,000 420,000
Stormwater
Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Stormwater canals
10,000 LM 10,016 10,016 30,000 1,000,000
MUNICIPALITY OF EL QARAAOUN
El Qaraaoun was categorized by the UN agencies as one of the most vulnerable localities that hosts a large number of Syrian refugees. The municipality identified needs in water, wastewater, irrigation, and stormwater projects. All projects are equally important for the village as reported by the Mayor noting that its wastewater project may benefit from the recent World Bank financing for the Litani Protection.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water reservoir
Connections to the well
6,500 6,500 4,016 275,000
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks network
4 lifting stations
Units
1,150 6,500 4,016 1,300,000 1- This network will serve the residence of El Qaraaoun living in the area below the main road of Qaraaoun Baaloul, Sohmor Above the lake.
2- The details for the number of beneficiaries from this project
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks is as follow: 250 residential unit and 15 commercial stores.
Irrigation
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Installing solar system for farmer's well
3 Units 6,500 6,500 4,016 420,000 Owners of the well are willing to sing a contract with the municipality for a min of 25 years free of charge, Farmers will no use polluted water from Canal 900.
Irrigation pump for an existing well
1 Unit 6,500 6,500 4,016 65,000 1- This project will benefit El Qaraaoun farmers and part of Baaloul and Saghbine.
2- Budget
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks estimated by the municipality.
Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Stormwater canals for unpaved roads
2,500 LM 6,500 6,500 4,016 225,000 1- This installation of these canals will allow us to construct the roads for the future infrastructure and building development.
2- Budget estimated by the municipality.
MUNICIPALITY OF KHIRBET QANAFAR
Kherbet Qanafar identified several needs in wastewater networks, irrigation canals, and stormwater harvesting sectors. The wastewater network and the irrigation canals are the most important need for the village as reported by the Mayor. The village is in proximity to the Joubb Jannine WWTP and the suggested missing wastewater network can be connected to the plant.
Wastewater
Project Description
Length/ Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
2,330 LM 4,620 4,620 961 466,000
Irrigation
Project Description
Length/ Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Irrigation canals 40*40 cm
5,000 LM 150 4,620 961 375,000 Per the mayor, the map for the irrigation canals indicates that no expropriation is needed for the canal.
Description
Length/ Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Stormwater
2,500 LM 4,620 4,620 961 250,000
MUNICIPALITY OF LALA
Lala identified needs for water, wastewater, and irrigation projects in the village. The Mayor expressed pressing needs for access to water, which gives water projects priority over the others.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Reservoir connected to new well above
500 m3 3,000 7,000 2,500 412,500
Well digging
3,000 7,000 2,500 73,500
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
10,000 LM 3,700 7,000 2,500 2,000,000 The project need was identified in the Master Plan and reconfirmed by the local authorities and local community during the Litani Protection Action Plan
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks workshop.
Irrigation
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Installing solar system for farmer's well with pumps
3 Units 3,000 7,000 2,500 420,000
MUNICIPALITY OF BAALOUL
Baaloul was identified as a most vulnerable locality by the UN agencies. Their most pressing needs pertain to access to water. BWE advised that the water network is an important project for the village as it completes the remaining 2,500 LM of network to provide access to 320 Lebanese citizen and Syrian refugees. Baaloul also identified additional needs in the water, wastewater, irrigation, and stormwater sectors. BWE anticipated additional subscriberscustomers with the completion of the water network as the village residents pay their subscriptions.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 2,500 LM 320 2,886 1,050 375,000
Equip the already existing well to be able to pump the 12 inch
3,000
2,800 2,886 1,050 400,000 This is an already existing well owned by BWE.
Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
2,500 LM 2,800 2,886 1,050 500,000 Project is supposed to be financed by Kuwaiti Fund through ESFD.
Irrigation
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Installing solar system for farmer's well with pumps
3 Units 2,800 2,886 1,050 420,000
Stormwater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Stormwater drainage canals directed to the Qaraaoun lake to protect the planted crops
500 LM 400 2,886 1,050 50,000
MUNICIPALITY OF YOHMOR
Yohmor has needs in water and wastewater. This how the table below reflects those projects identified mainly in the Bekaa Master Plan developed by USAID funded LWWSS project.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 18,840 LM Not available 4,214 218 2,826,000 This need is extracted from the Master Plan.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
18,840 LM Not available 4,214 218 3,768,000 This need is extracted from the Master Plan.
MUNICIPALITY OF SOHMOR
The needs of the Sohmor municipality are water and wastewater. Similar to Yohmor’ the following table reflects those projects identified by the Beqaa Master Plan developed by the USAID funded LWWSS project.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 44,415 LM Not available 7,902 1,015 6,662,250
Water reservoir 500 m3 Not available 7,902 1,015 275,000
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater
44,415 LM Not available 7,902 1,015 8,883,000
MUNICIPALITY OF AIN EL TINEH
Ain El Tineh municipality identified the needs in water, wastewater and stormwater projects as listed in the table below. According to BWE, the water network may not be a priority as the village may have benefitted from recent network installations and may not require the proposed water network.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 6,000 LM Not available 3,303 84 900,000 Project needs investigation as per the BWE recommendation.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
3,000 LM Not available 3,303 84 600,000
Stormwater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Stormwater
1,000 LM Not available 3,303 84 100,000
MUNICIPALITY OF SAGHBINE
The following table presents Saghbine’s needs for wastewater and irrigation projects. According to the municipality, the wastewater project is the most important intervention noting that the village hosts a small WWTP to serve the village’s needs. In the course of completing this report, it was further confirmed that the Ministry of Energy and Water will be implementing the irrigation canals.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
700 LM 5,400 3,828 340 140,000 There are few houses that are still to be connected.
Irrigation
Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water hill lake for irrigation
1 Unit 100 3,828 340 100,000 1- To reconfirm at a future date when the land becomes available.
2- It was estimated that the size of the hill lake is 10,000 m3 at a cost of 10 USD/m3.
Irrigation canals/pipes
1,200 LM 100 3,828 340 112,500
MUNICIPALITY OF BAB MAREH
Bab Mareh reported needs for water, wastewater, and irrigation projects as reflected in the table below. The municipality reported that all projects are equally important for the village.
Water
Project Description
Length/Size Unit No of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 4,425 LM 493 493 31 663,750
Water reservoir 100 m3 493 493 31 55,000
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
348 LM 493 493 31 69,600
Irrigation
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Irrigation canals
2,000 LM 493 493 31 120,000 Budget estimated by the union.
MUNICIPALITY OF AITANIT
Aitanit identified needs for water, wastewater, and irrigation as listed in the tables below. The municipality reported that the wastewater projects might be financed by the Kuwaiti fund through ESFD.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Installing solar system to provide power for water wells
1 Unit 1,163 1,151 12 155,000
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
744 LM 105 1,151 12 148,800 1- Project is supposed to be financed by Kuwaiti Fund through ESFD.
2- The length is
Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Irrigation canals
2,000 LM 105 1,151 12 120,000 Budget estimated
MUNICIPALITY OF AIN ZEBDE NEEDS
As specified in the table below Ain Zebde needs a 6,006 LM water network. This intervention was identified through the Beqaa Master Plan developed by the USAID funded LWWSS project.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
6,006 LM 614 1076 56 1,201,200 This length is
MUNICIPALITY OF ZELLAYA
As reflected in the table below, Zellaya needs a 5,095 LM wastewater network. This intervention was identified through the Beqaa Master Plan developed by the USAID funded LWWSS project and further confirmed by the municipality as a need.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
5,095 LM Not available 557 18 1,019,000 This need is
MUNICIPALITY OF QELIA
Qelia identified the needs for wastewater, irrigation, and stormwater projects as per the details reflected in the tale below.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
5,000 LM Not available 1,767 65 1,000,000
Irrigation
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Irrigation pond 2,500 m3 Not available 1,767 65 50,000
Irrigation network
2,000 LM Not available 1,767 65 150,000
Stormwater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Stormwater canals for unpaved roads
1,000 LM Not available 1,767 65 450,000 Budget estimated
MUNICIPALITY OF LIBBAYA
Libbaya needs a 17,716 LM wastewater network as shown in the table below. This intervention was identified through the Beqaa Master Plan developed by the USAID funded LWWSS project.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
17,716 LM Not available 4,754 81 3,543,200 This need is
MUNICIPALITY OF MAIDOUN
As listed in the tables below, Maidoun identified the needs for water and wastewater projects. The village lacks access to water and emphasized on the need of a well to provide additional water source for the residents of the municipality.
Water
Project Description
Length/ Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water network 8,769 LM Not available 958 0 1,315,350 This need is extracted from the Master Plan.
Drill and equip an artesian well.
Build a water tank for the capacity of 750 mᵌ
1 Unit Not available 958 0 412,500
Wastewater
Project Description
Length/ Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
8,769 LM Not available 958 0 1,753,800 This need is
MUNICIPALITY OF MACHGHARA
Machghara identified the need for an 8,000 LM wastewater project. The head of the Bouhaira Union mentioned that ESFD will be implementing wastewater networks.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
8,000 LM 12,515 20,000 3,000 1,600,000 Project is supposed to be financed by Kuwaiti Fund through ESFD.
ANNEX B – AL SAHEL NEEDS
THE AL SAHEL UNION OF MUNICIPALITIES
The Union of Al Sahel was founded in October 10, 1987. It is located in the West Beqaa District of the Beqaa Governorate. It covers a geographic area of 13,792 Ha. The union includes 12 municipalities:
Ammiq, Aana, Ghazzeh, Haouch El Harimeh, Kamed el Loz, Khiara, Manara, Mansoura, El Marj, Raouda, Saouiri, and Sultan Yaacoub. Eleven of the 12 municipalities signed the Charter for the Protection of the Litani River Basin
The total Lebanese population of the union is approximately 58,300, while its Syrian refugee population is estimated at 81,115.
The predominant economic sector in the Al Sahel union of municipalities is agriculture and dairy food industries.
PROJECTS OVERVIEW
The next table provides a summary of the projects proposed by the Al Sahel municipalities. They are segregated by type and displayed with an estimated budget for each type.
Type of Project Total Number of
Projects
Estimated Budget in
US $
Water Projects 9 4,645,000
Wastewater Projects 10 9,204,800
Stormwater Projects 6 1,751,800
Total 25 15,601,600
The following section provides a detailed listing of projects by the municipalities in Al Sahel Union of Municipalities. These projects are the result of the respective multi-stakeholders’ meeting and were further fine-tuned through consultations with the LWP team conducted with the union and respective municipalities.
MUNICIPALITY OF AAMMIQ
Aamiq identified the needs for water and wastewater projects as listed in the tables below. It is expected that the Kuwaiti fund will finance the water reservoir in the village.
Water
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Water reservoir 200 m3 Not available 1,103 178 110,000 Expected financing by the Kuwaiti fund.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network extensions
542 LM Not available 1,103 178 108,400 Needs extracted from Master Plan.
MUNICIPALITY OF AANA
The following tables represent the needs of Aana that identified wastewater and stormwater projects as priorities.
Wastewater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estimated Cost in USD
Special Remarks
Wastewater network
3,000 LM 1,600 2,100 193 600,000
Stormwater
Project Description
Length/Size Unit No. of Beneficiaries
Lebanese Population
Syrian Refugee Population
Estima…