About this file
This document contains guidance on marking requirements for USAID contracts performed overseas. It specifies that USAID-financed commodities, shipping containers, and project sites must be suitably marked with the USAID emblem and that shipping containers must also include the last five digits of the USAID financing document number. It notes that marking is generally not required for raw materials shipped in bulk or semifinished products not packaged. The guidance instructs contractors to obtain specific marking instructions prior to procuring commodities for shipment and as early as possible for project construction sites from the cognizant technical office indicated on the contract cover page or the Mission Director in the country where the commodities are shipped or project is located. Authority to waive marking requirements is delegated to Regional Assistant Administrators and Mission Directors. Contractors must send copies of any specific marking instructions or waivers to the contracting officer but retain the original documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SWIT Questions with Answers.docx | DOCX document | |
| Sol_72011520R00005_Amd_0001.pdf | ||
| Annex 6 PPP Pilot Selection Analysis_11_02_2016 Final.docx | DOCX document | |
| J.11 New Section K Representations and Ceritifcations.docx | DOCX document | |
| J.l Biographical Data Sheet.doc | DOC document | |
| J.6 Marking Plan template.docx | DOCX document | |
| Sol_72011520R00005.pdf | ||
| J.4 Budget Template.xlsx | XLSX spreadsheet | |
| 72011520R00005 Cover Page.pdf | ||
| J.10 Outreach and Communication Plan Template.docx | DOCX document | |
| J.5 Branding Implementation Plan template.docx | DOCX document | |
| Annex IV.pdf | ||
| J.8 Local Compensation Plan Tajikistan.xls | XLS spreadsheet | |
| Annexes I-III.docx | DOCX document | |
| Annex V.pdf | ||
| J.3 Initial Environmental Assessment.pdf | ||
| J.9 Past Performance Information (PPI).docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
752.7009 Marking
The following clause is for use in all USAID contracts performed in whole or in part overseas.
Marking (JAN 1993)
a) It is USAID policy that USAID-financed commodities and shipping containers, and project construction sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also to be marked with the last five digits of the USAID financing document number. As a general rule, marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished products which are not packaged.
b) Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the cognizant technical office indicated on the cover page of this contract, or by the Mission Director in the Cooperating Country to which commodities are being shipped, or in which the project site is located.
c) Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors.
d) A copy of any specific marking instructions or waivers from marking requirements is to be sent to the contracting officer; the original should be retained by the Contractor.
[49 FR 13259, Apr. 3, 1984, as amended at 58 FR 8703, Feb. 17, 1993; 79 FR 74988, Dec. 16, 2014]