This is a Scope of Work for the removal and disposal of concrete sinkers from the pier at USCG Base Portsmouth, located at 4000 Coast Guard Boulevard, Portsmouth, VA 23703. The contractor must provide all labor, materials, equipment, and safety equipment required to complete the project. Work must commence no later than 4 days after notice to proceed and be completed ready for use by 8 days after contract award. The primary task involves inspecting the sinkers to determine truck load requirements (20–22 tons per load), loading concrete sinkers onto trucks using a crane operated by Base Portsmouth personnel, and transporting the materials to an approved recycling facility (Dunn Concrete Recycling or Military Highway Recycling). The concrete sinkers contain metal bail and may be classified as "dirty concrete," requiring contractors to conduct a site visit prior to disposal to confirm details. All work must comply with applicable local, state, and federal environmental regulations, and unused materials or debris must be disposed of offsite in accordance with Federal, State, and local regulations.

The contracting officer's QA evaluator representative is BOSN Joshua Motta at (757) 788-1895, with project points of contact BMC Troy Sulfridge at (765) 586-3541 and BOSN Motta. All bidders are strongly encouraged to conduct a site visit to verify quantities before submitting bids. Contractors must provide a detailed employee list five days prior to work commencement, including full names, dates and places of birth, current addresses, and last four digits of Social Security numbers. Additional requirements include compliance with OSHA safety regulations (29 CFR 1910 and 1926), notification to the Base Safety Officer and Fire Marshal, provision of Material Safety Data Sheets and permits to the Environmental Protection Specialist, daily site cleanup, and contractor-provided vehicle identification with valid license plates and safety inspection stickers. No permits are required for this project.

View the file

Other files

File Type Posted
Amendment 0003 SF30.pdf PDF
AMENDMENT 0003 ATTACHMENT PAGE.pdf PDF
Amendment 0002 SF30.pdf PDF
AMENDMENT 0002 ATTACHMENT PAGE.pdf PDF
Amendment 0001 SF30.pdf PDF
Attachment 2 - DOL Wage Determination.pdf PDF
RFQ.pdf PDF
Attachment 3 - DOL Poster.pdf PDF
Attachment 1 - Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Base Portsmouth Sinker Removal

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, equipment, and safety equipment required to remove and dispose of the concrete sinkers from the pier at USCG Base Portsmouth; 4000 Coast Guard Blvd, Portsmouth VA 23703.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT 4 days after notice to proceed and work diligently to complete the entire work ready for use by 8 days after contract award.

3. SCOPE OF WORK: The Offeror shall:

3.1: Inspect the sinkers on the pier to determine how many truck loads will be required for the removal. Load the concrete sinkers from the pier onto the trucks, using the crane provided and operated by Base Portsmouth personnel. Each load should hold between 20-22 tons.

Transport the concrete sinkers to a recycling facility for disposal (Dunn Concrete Recycling or

Military Highway Recycling are known sources).

Please Note:

1. At the conclusion of this Scope of Work, it is expected that the concrete sinkers at Base

Portsmouth will be gone from the pier and transported to the recycling facility (Dunn

Concrete Recycling or Military Highway Recycling are known sources previously utilized). The concrete sinkers are known to include metal bail and could potentially be considered “dirty concrete”, however, contractors are urged to conduct a site visit to confirm any these details prior to disposal.

2. All work will be conducted in accordance with and in compliance with any/all applicable local, state, and federal environmental regulations.

3. Contractor shall dispose of unused materials/ debris offsite IAW any/all Federal, State, and/or local regulations.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with BMC Troy

Sulfridge at (765) 586-3541.

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)

REPRESENTATIVE: The designated contracting officer’s QAE representative is BOSN

Joshua Motta @ (757) 788-1895, and Points of Contact for this project are BMC Troy Sulfridge

@ (765) 586-3541, and BOSN Motta. Inquiries concerning any phase of the specification before or after award shall be made to either BOSN Motta or BMC Troy Sulfridge.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of their intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify, or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: None.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on

Saturday, Sunday, holidays or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE

Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The USCG Base Portsmouth Security

Office will be given a copy of the employee list. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

a. All contractors working on USCG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR

1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer, Kelvin Smith at (757) 218-2451, prior to starting work.

b. Written notification must be provided to the USCG Base Portsmouth Fire Marshal, DC1

Rene Pena at (520) 954-9538, of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on USCG Base Portsmouth. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.

e. Rights: Every employee working on USCG Base Portsmouth has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work.

QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on USCG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series).

Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist Larry (Scott) Fisher @ larry.s.fisher@uscg.mil prior to starting work and must be in accordance with the Unit

Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on USCG Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor.

Disposal must be in accordance with federal, state, and local guidelines.