This is a Performance Work Statement for Ultra-High Pressure Water Jet Blasting services at the U.S. Coast Guard Yard, Curtis Bay, Baltimore, Maryland.
The Contractor must provide Ultra-High Pressure (UHP) water jet blasting services at 36,000 to 40,000 PSI to remove coatings and contaminants from U.S. Coast Guard vessels, including both dry-docked and pier-side vessels. Work encompasses multiple vessel types ranging from the 327-foot Eagle to 65-foot Tender/Barge configurations. Primary coating removal must achieve the WJ-2/L standard on accessible areas with an allowance of up to 5 percent for physically inaccessible areas. For inaccessible areas or complex geometries, the Contractor must use vacuum-assisted mechanical power tools to achieve SSPC-SP11 standard, or alternatively SSPC-SP3 (mechanical) or SSPC-SP2 (hand tooling) if SP11 cannot be achieved. Mechanical power tooling is estimated at 10 percent of the total requested surface area for superstructure and weather deck task orders. The Contractor must maintain an approximate six-inch clearance from sensitive areas such as hoses, piping, and electronic devices to prevent damage. Services must be initiated within 72 hours of task order notification, and the Contractor must report to the designated work site within 24 hours to begin containment construction and equipment staging.
The Contractor is responsible for complete containment and environmental compliance, capturing 100 percent of process liquids and solids with zero discharge, and removing all wastewater, paint chips, and paint pigment slurry to a permitted disposal facility. The Contractor must furnish all equipment, including three vacuum blast head units (similar to Flow "Hydro-Cat") up to 40,000 psi, power tools, hand tools, man lifts, storage tanks for process water, and spill containment materials. The Contractor must maintain an active Society for Protective Coatings (SSPC) QP1 certification and provide a minimum of one on-site SSPC C13-certified supervisor/manager. The Government will provide water, compressed air, electricity (up to 200 amperes at 480 volts), material handling services, and staging/scaffolding in areas inaccessible by man lift. The period of performance is a one-year base period with four one-year option periods. The contract requires daily progress reports, containment and cleanup inspection documentation, and waste disposal manifests. Performance requirements include strict adherence to federal, state, and local regulations; environmental permits including NPDES, Title V Air Permit, and storm water permits; and RAPIDGate Program compliance for employees requiring repeat access to the facility. The Contractor assumes sole liability for environmental violations and any fines imposed upon the Yard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1-Wage Determination 2015-4265.r35 dtd 8.22.2026.txt | TXT text file | |
| UHP Solicitation - KO review 11-9-2026-FINAL.pdf |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #: 2126406Y6164A81010
PERFORMANCE WORK STATEMENT UHP Water Jet Blasting
November 5, 2026
PERFORMANCE WORK STATEMENT (PWS)
FOR
Ultra High-Pressure Water Jet Blasting (36,000 to 40,000 PSI Services)
1.1 BACKGROUND
This is a non-personal services contract to provide Ultra-High Pressure (UHP) Water Jet Blasting Services at the U.S. Coast Guard Yard, Curtis Bay, Baltimore, MD, where performance shall take place on both dry-docked vessels and internally on pier-side vessels. It is anticipated that these services will be required due to the high volume of vessels scheduled for Yard Availabilities, which include, but are not limited to, the 327’ Eagle, 270’ Medium Endurance Cutters, 225’ Seagoing Buoy Tenders, 210’ Medium Endurance Cutters, 175’ Coastal Buoy Tender, 154’ Sentinel-Class, 140’ Ice Breakers, 110’ and 87’ Patrol Boats, 75’ and 65’ Tender/Barge configurations, as well as Foreign Military Sales or Other Government Agency (OGA) vessels. The Government shall not exercise any supervision or control over the contract service providers performing the services herein; such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2 SCOPE
The scope of this Performance Work Statement (PWS) encompasses the provision of Ultra- High Pressure (UHP) water jet blasting and supplementary vacuum-assisted mechanical/hand tooling services to safely and efficiently remove coatings and contaminants from U.S. Coast Guard vessels. The Contractor must provide labor, materials, administration, and quality control necessary to perform these services on both aluminum and steel substrates. This notification will be issued in the form of a task order by the contracting officer. All work will be authorized by task orders, detailing the location and amount services to be provided.
Limits and Range of Work:
• Target Areas: Exterior and interior vessel surfaces, including underwater bodies, freeboards, superstructures, stacks, weather decks, crane or king posts, handrails, ventilation, exterior bulkheads, overheads, exterior appendages, and attached metal surfaces that adhere to the vessel.
• Standards: Primary coating removal must achieve the WJ-2/L standard via water jet blasting on accessible areas, with an allowance of up to 5 percent for physically inaccessible areas.
• Clearance Zones & Secondary Tooling: To prevent damage, UHP water blasting must maintain an approximate six-inch clearance from sensitive areas (such as hoses, piping, port lights, and electronic devices). These inaccessible areas or complex geometries must be cleaned using vacuum-assisted mechanical power tools to the SSPC-SP11 standard. If SSPC-SP11 cannot be achieved, mechanical tooling to SSPC-SP3 or hand tooling to SSPC-SP2 must be used.
• Volume Estimation: Mechanical power tooling services are estimated at a ratio of 10 percent of the total requested surface area for superstructure and weather deck task orders.
file:///C:/Users/local_KAWyatt/INetCache/SCOPE%20PARAGRAPHS.doc
• Response & Compliance: Services must be initiated within 72 hours of task order notification. The Contractor must maintain an active SSPC QP1 certification and adhere strictly to federal, state, local, and Coast Guard regulations (including environmental, fire, safety, and security policies)
1.3 OBJECTIVE
The primary objective of this contract is to secure environmentally safe, rapid-response surface preparation and coating removal services for U.S. Coast Guard vessels utilizing Ultra-High Pressure (UHP) water blasting.
By employing UHP water blasting over traditional grit blasting, the Coast Guard aims to achieve a highly cost-effective and low-impact coating removal process that effectively strips contaminants (such as salt and grease) without pounding them into the substrate or creating hazardous dust clouds. The desired outcome is to consistently produce clean, bare aluminum or steel surfaces prepared to rigorous SSPC standards. These prepared surfaces will be directly utilized to facilitate immediate vessel maintenance, preservation, and recoating operations, thereby maintaining the operational readiness of the fleet while strictly minimizing yard lay days and environmental liabilities.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
• Coast Guard Coatings and Color Manual COMDTINST M10360.3C
• 29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment
• Coast Guard Yard Quality Assurance Desk Guide
• ISO 14001 Environmental Management System Manual
• Yard National Pollution Discharge Elimination System (NPDES) Permit
• Yard 12SW Storm water Permit
• Yard Title V Operating Air Permit
• Yard Sanitary Wastewater Discharge Permit
• Yard Oil Operations Permit
• All applicable Federal laws, regulations, executive orders, standards, permits, codes, and requirements; all applicable laws and regulations of the State of Maryland; and all applicable ordinances, codes, permitting requirements, and regulations of the local jurisdiction in which the work is performed.
1.4.2 Reference Documents
The following documents may be helpful to the Contractor in performing the work described in this document:
• SFLC Standard Specification 6310
• SFLC Standard Specification 0000
• Coast Guard Coatings and Color Manual COMDTINST M10360.3C
• USCG Safety and Environmental Health Manual (COMDTINST M5100.47 series) https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Coat%20&%20Coloring%20Manual%20-%20COMDTINST_M10360.3C_CHG-1.pdf_safe.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/29%20CFR%201915%20_%20Occupational%20Safety%20and%20Health%20Administration.html https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/CGY-DG-QAD-001.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/ISO%2014001%20EMS%20MANUAL%20_%202024%20_%20FINAL_8.16.24.docx https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/ISO%2014001%20EMS%20MANUAL%20_%202024%20_%20FINAL_8.16.24.docx https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/NPDES.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%2012SW%20Storm%20Water%20Permit.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%2012SW%20Storm%20Water%20Permit.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%20Title%20V%20Operating%20Air%20Permit.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%20Sanitary%20Wastewater%20Discharge%20Permit.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%20Sanitary%20Wastewater%20Discharge%20Permit.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%20Oil%20Ops%20Permit%202020.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Yard%20Oil%20Ops%20Permit%202020.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.2%20Reference%20Documents/SFLC-Std-Spec-6310-(2022).pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.2%20Reference%20Documents/SFLC-Std-Spec-6310-(2022).pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.2%20Reference%20Documents/SFLC-Std-Spec-0000-(2022).pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.2%20Reference%20Documents/SFLC-Std-Spec-0000-(2022).pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.1%20Compliance%20Documents/Coat%20&%20Coloring%20Manual%20-%20COMDTINST_M10360.3C_CHG-1.pdf_safe.pdf https://uscg.sharepoint-mil.us/sites/SFLC-PF-Yard-IND/Shared%20Documents/General/Pln-Est-Sched/Contracting-(COR)/Contract-Packages-Under-Development/Formal%20Contracts/UHP%2026/1%20Planning%20&%20Pre-Solicitation/Reference%20Documents/Supporting%20Documentation/1.4.2%20Reference%20Documents/CIM_5100_47D.pdf_safe.pdf
1.5 PERFORMANCE REQUIREMENTS SUMMARY.
This contract includes a Performance Requirements Summary (PRS) at PWS 9.0. The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS must serve as a primary tool for inspection and acceptance of services as facilitated by the Contracting Officer’s Representative (COR). Evaluation of the Contractor’s overall performance must be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the Contracting Officer.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. Ultra-High Pressure (UHP) Water Jet Blasting Services
2.1.1 The Contractor must use Ultra-High Pressure (UHP) water jet blasting to remove coatings and contaminants from designated U.S. Coast Guard vessel surfaces.
2.1.2 The Contractor must achieve the WJ-2/L surface preparation standard on targeted vessel surfaces.
2.1.3 The Contractor must remove 100 percent of designated coatings from the surfaces being water blasted, with an allowance of up to 5 percent for physically inaccessible areas.
2.1.4 The Contractor must prepare both aluminum and steel underlying substrates to the required standards.
2.1.5 The Contractor must UHP water blast up to 3,000 square feet per vessel per day.
2.1.6 The Contractor must uniformly remove designated coatings, anti-fouling paint coatings, loose rust, and mill scale from underwater body surfaces, freeboards, pedestals, and hull appendages (including rudders, shafts, and rope guards).
2.1.7 The Contractor must maintain a four-inch clearance from the keel and side blocks while blasting to allow the existing coating to be feathered, providing a smooth transition with the new paint system.
2.1.8 The Contractor must water jet blast superstructures, encompassing complex shapes such as overheads, watertight doors, ladders, bulwarks, piping, handrails, stanchions, stacks, masts, and staffs, based on the exact definitions provided in individual task orders.
2.1.9 The Contractor must water jet blast weather deck surfaces, including machinery foundations, bitts, chocks, hatches, stanchion sockets, vent pipes, and angle coaming areas based on the exact definitions provided in individual task orders.
2.1.10 The Contractor must water jet blast bulkheads and exterior surfaces provided in the task order.
2.2 TASK TWO. Secondary Mechanical and Hand Tooling Services
The Contractor must utilize mechanical and hand tooling methods for surface preparation on areas where water jet blasting is physically unachievable.
2.2.1 The Contractor must use vacuum-assisted mechanical power tools to achieve 100 percent paint or coating removal on surface areas where UHP water blasting is impractical due to complex geometry.
2.2.2 The Contractor must power tool clean these inaccessible surfaces to bare metal, achieving the SSPC-SP11 surface preparation standard.
2.2.3 The Contractor must utilize mechanical power tools to the SSPC-SP3 standard, or hand tooling to the SSPC-SP2 standard, when physical inaccessibility prevents achieving the SSPC- SP11 standard.
2.2.4 The Contractor must maintain an approximate six-inch clearance while water jet blasting near sensitive areas, including handrails, stanchions, undersides of angles, window frames, hoses, piping, port lights, and electronic or electrical devices, to prevent damage.
2.2.5 The Contractor must use mechanical power tools or hand tools to prepare the surfaces within these six-inch clearance zones.
2.2.6 The Contractor must execute power tool cleaning on an amount equal to 10% of the requested water jet blasted surface area for superstructure and weather deck task orders to account for complex geometries.
2.2.7 The Contractor must vacuum, collect, and dispose of debris generated by mechanical and hand-tooling operations.
2.3 TASK THREE. Containment Installation and Management
The Contractor must establish, manage, and safely remove secure containment systems to capture process liquids and solids during blasting operations, preventing environmental contamination.
2.3.1 The Contractor must submit a containment plan to the Government with the proposal.
2.3.2 The Contractor must provide, install, and maintain containment to capture 100 percent of process liquids, paints, and solids generated during the blasting operation.
2.3.3 The Contractor must cover exterior deck drains to prevent paint chips and sludge from clogging the ship's deck drain and piping system.
2.3.4 The Contractor must maintain watertight containment from the start to the conclusion of the project.
2.3.5 The Contractor must implement measures to prevent high wind conditions from blowing water and paint chips out of the containment into the surrounding water.
2.3.6 The Contractor must conduct ongoing inspections of the containment before, during, and after water blasting to verify containment integrity.
2.3.7 The Contractor must present the containment to the Contracting Officer’s Representative (COR) for inspection and acceptance prior to commencing blasting operations.
2.3.8 The Contractor must immediately reestablish breached containment.
2.3.9 The Contractor must halt work at no cost to the Government until the containment is fully reestablished if immediate reestablishment is impossible.
2.3.10 The Contractor must prevent process water and materials from escaping the containment to comply with the State of Maryland discharge permit held by the U.S. Coast Guard Yard.
2.3.11 The Contractor must immediately notify the COR if wastewater or material is found outside the containment area so the COR can notify the U.S. Coast Guard Yard Facilities Management, Environmental Branch.
2.3.12 The Contractor must not discharge processed water, recycled water, or cooling water generated by Contractor equipment into the Yard's sanitary sewer.
2.3.13 The Contractor assumes sole liability for fines imposed upon the Yard due to Contractor violations of the Yards National Pollution Discharge Elimination System (NPDES) discharge permit, Title V Air Permit, or related environmental permits.
2.3.14 The Contractor must remove hydro blasting material within the containment area within 24 hours of project completion.
2.3.15 The Contractor must obtain authorization from the COR before removing containment structures.
2.3.16 The Contractor must demobilize the containment materials immediately after receiving COR approval. The containment must remain in place until the job has been officially signed off.
2.3.14 is to remove the blasting media within the containment. 2.3.1.6 is to remove the containment once the job has been deemed complete.
2.4 TASK FOUR. Clean-up and Disposal
The Contractor must perform ongoing cleanup, collect blasting debris, and manage waste disposal to maintain a clean work environment and permit ongoing Yard operations.
2.4.1 The Contractor must submit a cleanup and disposal plan to the Government with the proposal.
2.4.2 The Contractor must vacuum the containment area on an ongoing basis and at the end of each workday to prevent overflow and enable Yard work to continue in the area. Containment shall be watertight from start to finish of the project.
2.4.3 The Contractor must cover all exterior deck drains to prevent paint chips and sludge from clogging ships deck drains and piping systems. The contractor must sweep and collect paint chips deposited onboard the vessel and in areas surrounding the vessel from the blasting operations on an ongoing basis and at the end of each workday.
2.4.4 The Contractor must submit a daily written report of the cleanup and containment inspection to the COR.
2.4.5 The Contractor must resolve identified inspection discrepancies immediately upon notification by phone call, email, or verbal notification at the work site.
2.4.6 The Contractor shall halt surface preparation operations and dedicate labor solely to cleanup activities when the COR determines that work areas are deficient. Deficient work areas include conditions that are not clean, safe, orderly, or adequately controlled and that may interfere with work quality, inspection, environmental compliance, or safe access, including accumulated debris or contaminants, inadequate containment, obstructed access, unsecured materials or equipment, and other failures to meet contract housekeeping or safety requirements.
2.4.7 The Contractor must clean containment areas and obtain COR inspection approval before the COR signs off the work order as complete.
2.5 TASK FIVE. Mobilization and Task Order Execution
The Contractor must manage response times and execute all work in strict accordance with issued Coast Guard task orders.
2.5.1 The Contractor must commence requested coating removal services within 72 hours of notification by the Contracting Officer.
2.5.2 The Contractor must execute work exactly as detailed in individual task orders completing the specific locations and service quantities requested.
2.5.3 If the Contractor cannot meet schedule dates, the Contractor must notify the COR in writing at least 48 hours in advance.
2.5.4 The Contractor must report to the designated work site within 24 hours after written receipt of each task order to begin containment construction and staging of equipment/personnel for ultra-high-pressure water jetting.
2.6 TASK SIX. Certification and Compliance Maintenance
The Contractor must maintain required industry quality certifications and comply with all regulatory and Coast Guard Yard-specific policies.
2.6.1 The Contractor must maintain an active Society for Protective Coatings (SSPC) QP1 certification throughout the contract duration.
2.6.2 The Contractor must follow U.S. Coast Guard Yard regulations regarding fire, safety, sanitation, environmental protection, security, restricted areas, vehicle movement, and personnel conduct.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this PWS. Specifically, the Contractor must provide at a minimum one (1) SSPC C13 certified person on-site responsible for managing personnel performing UHP water jetting work. The Offeror shall submit, as part of its proposal, the resume of the individual proposed to serve as the on-site SSPC C13-certified supervisor/manager for UHP water jetting operations. The resume shall identify relevant experience managing UHP water jetting personnel and operations. The Offeror shall also submit a current copy of the individual’s SSPC C13 certification or other documentation demonstrating that the certification is active and valid at the time of proposal submission. The Contractor shall maintain this certification throughout contract performance and shall provide updated documentation upon request by the Contracting Officer’s Representative (COR) or Contracting Officer (CO).
3.2 Key Personnel
Before replacing any individual designated as Key Personnel by the Government, the Contractor must notify the Contracting Officer no less than 15 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes must possess qualifications equal to or superior to those of the Key person being replaced, unless otherwise approved by the Contracting Officer. The Contractor must not replace Key Contractor personnel without approval from the Contracting Officer. The following Contractor personnel are designated as Key for this requirement. Note:
The Government may designate additional Contractor personnel as Key at the time of award.
• SSPC C13 Certified On-Site Manager/Supervisor
• Project Manager Off-Site
3.3 Project Manager
The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this PWS. The Project Manager must be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager, must be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates must be able to read, write, speak, and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.
3.3.1 The Project Manager must be available to the COR via telephone between the hours of 0700 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 2 hours of notification.
3.4 Employee Identification
3.4.1 Employee employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and always display all identification and visitor badges in plain view above the waist.
3.5 Employee Conduct
Contractor employees are subject to and must observe and comply with all applicable U.S.
Coast Guard regulations, policies, and procedures. This includes strictly adhering to rules regarding fire, safety, sanitation, environmental protection, security, gratuities, flag courtesy, "off limit" areas, wearing of parts of military uniforms, personal appearance, parking, moving vehicles, use of drugs and intoxicants, and possession of firearms or other lethal weapons.
Contractor employees must always present a professional appearance, and their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must verify that Contractor employees understand and abide by established Coast Guard and Department of Homeland Security rules, regulations, and policies concerning safety and security.
3.6 Removing Employees for Misconduct or Security Reasons
The Government may, at its sole discretion (via the Contracting Officer or COR), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 OTHER APPLICABLE CONDITIONS
Effective September 1, 2016, all contractors and subcontractors performing on this contract/purchase order/task order shall utilize the RAPIDGate Program if repeat access to the CG Yard is required for seven (7) or more days annually. RAPIDGate manages the non- Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard Yard AND logical access to a DoD or DHS network or system.
Vendor/contractor companies that require repeat (7 or more days annually) access to the CG Yard, pay an annual company enrollment subscription to participate in the RAPIDGate Program and an annual employee registration subscription for each employee to participate in the program. The company enrollment fee is waived for sole proprietors.
Vendor/contractor companies must be approved by a government sponsor at each DoD and DHS installation where their employees require access. Vendor/contractor employees who are registered undergo initial and regular vetting and are issued a single credential, which is valid for perimeter access to those DoD and DHS installations where access privileges have been granted. All company enrollments are submitted via the web at www.rapidgate.com and managed by phone or email. Initial employee registrations take place at a Program Registration Kiosk, typically located at participating DoD and DHS Installation Pass & ID Offices. The CG Yard’s Registration Kiosk is located at 2401 Hawkins Point Road, Baltimore, MD 21226, BLDG.
144, Security [brick building adjacent to the main gate]. Credentials will be available for pick-up at BLDG. 144 fourteen (14) days after the employee’s initial registration. Costs incurred for delays at the gate due to the contractor’s failure to comply with this requirement or to provide qualified, authorized personnel will not be reimbursed by the Government. Additionally, consideration may be negotiated for performance delays caused by the contractor’s failure to comply with RAPIDGate requirements, or for delays caused by the disqualification of contractor employees. Your tenant sponsor is the Contracting Officer's Representative (COR) Alan Randolph, email: Alan.k.randolph@uscg.mil. This sponsor will need a list of individual employee https://www.osha-safety-training.net/product-category/osha-publications/29-cfr-1910-general-industry/ names and DOBs with your quotation. Any RAPIDGate program questions should be directed to 1-877-727-4342
4.1 SECURITY
Security Risk and Background Investigation Form Requirements
The office requirements anticipate the following:
Check Applicable Box
Tier Investigation
Risk Form
X 1 Low Risk, Non-Sensitive, Physical/Logical Access (HSPD-12 Credentialing)
SF85
2 Moderate Risk, Public Trust SF85P
3 Non-Critical Sensitive, L, Confidential and Secret Information
SF86
4 High Risk, Public Trust SF85P
5 Q, Top Secret, Compartmented Information, Critical Sensitive, Special Sensitive
SF86
4.2 PERIOD OF PERFORMANCE
The period of performance for this contract is a one-year base period with four one-year option periods , if exercised.
4.3 PLACE OF PERFORMANCE
The place of performance will be the USCG Yard, 2401 Hawkins Point Road, Baltimore, MD, 21226.
4.4 HOURS OF OPERATION
The normal operating hours for the Coast Guard Yard are 7:00 – 3:30, Monday through Friday (except Federal holidays). The Contractor’s employees may work other than normal business hours, including weekends and holidays, to fulfill requirements under this PWS.
4.5 TRAVEL
Travel will not be required under this contract.
4.6 POST AWARD CONFERENCE
The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than 10 business days after the date of award. The purpose of the Post Award Conference is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held at the Government’s facility, located at 2401 Hawkins Point Road, Baltimore, MD, 21226 or via teleconference.
4.7 PROJECT PLAN
Following award of each task order, the Government and Contractor shall conduct a task order kickoff meeting. The Contractor shall provide an initial production schedule to the Coast Guard Yard before the kickoff meeting. The production schedule shall identify the planned equipment, labor resources, starting locations, and proposed sequence of work for the task order.
4.8 PROGRESS REPORTS
The Project Manager shall submit a daily progress report to the Contracting Officer and COR via email. Each report shall include a summary of all Contractor work performed and progress achieved that day, the Daily Log, quality assurance inspection records, containment inspection records, and, when applicable, documentation supporting any actual or anticipated delay to the work or project schedule.
4.9 PROGRESS MEETINGS
The Project Manager shall remain responsible for keeping the COR informed of Contractor progress throughout the contract performance period and for ensuring that Contractor activities align with U.S. Coast Guard Yard schedules and objectives. The Contractor’s Supervisor may perform on-site daily quality control oversight and submit the daily Quality Control Report to the COR. The Supervisor shall promptly report any performance issues, schedule impacts, safety concerns, or other conditions affecting contract performance to the Project Manager and the Contracting Officer.
Prior to the commencement of any task order, the Contractor’s Supervisor shall meet with the COR on-site to conduct a vessel walk-through and identify any potential interferences, site conditions, and specific services required for performance of the task order. Any issues related to Contractor performance, including containment integrity, environmental compliance, technical concerns, safety issues, or conditions that may affect Yard operations, shall be reported to the Contracting Specialist and Contracting Officer. The Contracting Officer shall coordinate with the Contractor to address and resolve the issue.
4.10 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
The Quality Control Report must contain the following information:
a. Progress Report, including potential schedule delays.
b. Daily Log.
c. Quality Inspections.
d. Containment Inspection.
e. Documentation of delays or stopped work. If delays occur or work stops, the Contractor must document the specific reasons in the daily report to allow the COR and Contracting Officer to evaluate the situation and review potential extensions to the period of performance. Expected documentation should be sufficient to establish what occurred, when it occurred, the work affected, and the resulting schedule impact. The daily report should include, at a minimum: Date and time of event, detailed description, cause of the delay, affected work, schedule impact, supporting evidence, notice provided: date and time the Contractor notified the COR & Contracting Officer, including the method of notification, mitigation efforts, and current status and forecast.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will provide the following property to the Contractor for work required under this contract:
5.1 Services: The Government shall provide material handling services to load and unload
Contractor machinery and for the setting up of equipment. The U.S. Coast Guard Yard shall endeavor to provide timely assistance as requested by the Contractor. The Contractor shall provide 48-hour notice to the Government of the need for material handling services.
However, there may be occasions where Yard work must take precedence. These occurrences will be managed as they occur.
5.2 Utilities: The Government will provide water, compressed air, and electricity for the contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
5.2.1 Water: The Government shall provide a water source for Contractor machinery and identify the available connection type, size, pressure, and location. The Contractor shall furnish all hoses, fittings, adapters, backflow-prevention devices, and other equipment necessary to connect its machinery to the Yard’s water source. The Contractor shall ensure that all connections are compatible with the Government-provided water connection and comply with applicable safety and environmental requirements.
5.2.2 Compressed Air: The Government shall provide a compressed-air source for
Contractor machinery and identify the available connection type, size, operating pressure, flow capacity, location, and any air-quality requirements. The Contractor shall furnish all hoses, fittings, adapters, regulators, safety devices, and other equipment necessary to connect its machinery to the Yard’s compressed-air source. The Contractor shall ensure that all connections are compatible with the Government-provided compressed-air connection and comply with applicable safety requirements.
5.2.3 Electricity: The Government shall provide electrical service of up to 200 amperes at up to 480 volts for Contractor equipment hookups and identify the available voltage, phase, frequency, connection type, receptacle configuration, location, and grounding requirements. The Contractor shall verify compatibility of its equipment with the Yard’s electrical service before connection and shall furnish all necessary cables, connectors, adapters, disconnects, grounding equipment, and other appurtenances required for a safe, code-compliant hookup. The Contractor shall not connect equipment until the electrical connection has been confirmed with the Government.
5.2.3.1 Contractor must be aware that there are areas of the Yard that cannot accommodate electrical pumps and that there will be times that only diesel pumps, provided by the contractor, must be used.
5.3 Equipment: The Government will provide staging and scaffolding only in work areas determined by the Government to be inaccessible by man lift. The Contractor shall provide, operate, and maintain man lifts as necessary for all other accessible work areas. Prior to allowing any employee to operate a man lift, the Contractor shall ensure the employee has received required training and is qualified to operate the specific equipment used under this contract.
5.4 Hazardous Materials and Waste: All hazardous materials brought on the Yard property must be preapproved by the Yard Environmental Branch. If non bulk materials being removed are deemed hazardous waste (code of Maryland Regulations, Title 26, subtitle 13 and 40 CFR 260-267), the Government shall dispose of the materials. Bulk hazardous waste shall be disposed by the Contractor with approval and direction of the Yard
Environmental Branch.
If the surface coating to be removed is known or suspected to contain lead, cadmium, chromium, polychlorinated biphenyls (PCBs), or other hazardous materials, the Government will notify the Contractor in writing before the affected work begins. Before coating-removal activities commence, the COR, Yard Safety Office, Environmental Branch, and Contractor will coordinate and document the required safety precautions, removal methods, and applicable environmental controls. Notification will be provided in the task order.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all supplies, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in PWS 2.0 and PWS 6.0.
6.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract other than those explicitly address in Section 2 of this PWS. The Contractor shall have enough equipment and labor to ensure that they can meet the Yard’s schedule requirements, which may require the Contractor to water blast up to 3,000 square feet per vessel per day, in accordance with the performance requirements.
The Contractor may be required to supply services concurrently on more than one vessel.
The Contractor shall have the capability to provide independent services in up to three locations within the U.S. Coast Guard Yard at one time. The blasting locations may include the ship lift, east wall and pier 3.
6.2 Materials: The Contractor is required to provide storage tanks for process water. If poly tanks are utilized to hold wastewater the poly tanks must be double-walled and have all metal fittings. All tanks and fittings regardless of construction material must be in good condition, free of leaks. The COR of this contract shall inspect the tanks periodically to ensure compliance. All connections, hatches and manholes on Contractor’s storage tanks must be locked. All tanks or drums shall be labeled as to contents and ownership with a 24-hour emergency number clearly marked on each. Whether the tanks or drums are hazardous waste, DOT hazardous material or other materials does not matter. For example:
Tanks holding hydro blast water shall be marked “Non-Potable water, ABC Contracting, 800-555-1212”; tanks holding fuel shall be marked “Diesel Fuel, ABC Contracting, 800-555- 1212”. The tank placement shall be coordinated with the COR and the Material handling shop. Tanks (except water) and all 55-gallon drums of any liquids must be provided with secondary containment to contain 100% of the total tank capacity. Double wall tanks are acceptable for up to 12,000 gallons. If deemed an emergency, Yard tanks may be used to hold process water, but approval of the COR must first be obtained.
6.3 Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning water jet blasting equipment in good condition. Specifically, the following water jet blasting equipment is required:
A. Three vacuum blast head units (similar to the Flow “Hydro-Cat”) Up to 40,000 psi 2,800 bar
B. Vacuum assisted hand wands.
C. Hand wands for cut ins.
D. Power Tools including but not limited to needle guns, scalers, and sanders to perform coating removals where water jetting is inaccessible.
E. Hand tools including; hammers, chisels, sandpaper, and scrapers
6.3.1 The above-mentioned equipment may be owned or leased by the contractor and the demonstrated ability to own or lease the equipment must be included in the proposal.
6.3.2 Manlifts and Staging: The Contractor is responsible for providing man lifts in all areas where needed.
6.4 Fuel: The Contractor is required to refuel all Contractor owned or leased equipment. During refueling, Contractor must have a spill containment boom around any equipment being filled.
Contractor supplied spill material must be at the refueling location and any leaks that occur must be cleaned up immediately by the Contractor. Any spills from any equipment greater than 5 gallons on land that reach the water or goes into a storm drain must be reported to 443-525-2034. Any tanks or trucks left overnight in the Yard shall have the Contractor’s name and a 24-hour phone number clearly marked in an easily visible location to enable the Yard to contact the Contractor should any damage occur while not on site.
6.5 Water and Water Disposal: The Contractor shall be responsible for the collection, containment, handling, treatment, transportation, and disposal of all wastewater and other waste generated by water-jet blasting operations, in accordance with applicable contract requirements and environmental regulations. This also includes but is not limited to all potable water, tap water, and rainwater that accumulates in the containment areas. The Contractor is responsible for all fees accrued in the recycling of processed water, cooling water, and disposal of sludge or slurry. The Contractor shall vacuum or otherwise collect 100% of the water. The contractor shall reuse the collected water or remove and dispose of it at a permitted treatment/disposal facility. The Contractor is responsible for the disposal of all process water, paint chips, and paint pigment slurry off site. All waste and solids generated by the hydro blasting process shall be the responsibility of the Contractor and must be removed to a permitted disposal facility. The disposal facilities must have a permit to treat the water and dispose of all process generated waste. The verification of the disposal facility permit must be provided to the Yard Environmental Branch and COR and must be approved in writing prior to the disposing of water or waste. A manifest of each load removed for disposal shall be provided to the COR and the Yard Environmental Branch with the disposal facilities utilized, noted in the report.
6.6 Contractor’s Responsibility for Condition of Contractor Owned/Leased Equipment: The
Contractor’s trucks and equipment shall be maintained in an operable condition and meet all Federal, State of Maryland and local safety requirements. The Contractors equipment must be maintained in a manner which does not permit oil to leak from the equipment when stationary or in use. Any equipment which does not meet this minimum operational standard shall be required to be removed from the Yard at the direction of the COR at no cost to the government. All Contractor’s trucks, equipment, trailers, storage tanks, office trailers, etc.
shall not be stored on Yard property.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s proposal, as incorporated into the contract. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
7.2 The COR will have 14 business days to review deliverables and make comments. The Contractor shall have 14 business days to make corrections and redeliver.
7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review.
The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.
8.0 DELIVERABLES
The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverable or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this PWS.
ITEM
PWS
REFERENCE
DELIVERABLE / EVENT DUE BY
DISTRIBUTION
1 2.1 Quality Control Plan With Proposal
Contracting Officer, Contract Specialist
2 2.3 Initial Production Schedule
Submit within 24 hours of the vessel kick-off meeting.
COR
3 2.3.1 Containment Plan With Proposal
Contracting Officer, Contract Specialist
4 2.4.7 Waste Disposal Manifests
Submit upon the removal of each waste load transported to a permitted treatment/disposal facility.
COR & Yard Environmental Branch
5 2.5.1 Cleanup and Disposal Plan
With Proposal
Contracting Officer, Contract Specialist
6 2.6.1 SSPC QP1 Certification Proof
With Proposal
7 3.1 Resume – Management UHP Personnel & Operations
With Proposal
8 4.6 Post Award Conference Within 10 days of award
N/A
9 4.6, 4.7 Draft Contractor Project Plan
Post Award Conference
COR,
Contracting Officer
10 4.9
Progress Reports Daily Quality Control Report (Includes Progress, Daily Log, QA Inspections, Containment Inspection, and Delay Documentation)
Submit at the end of each working day.
COR
ITEM
PWS
REFERENCE
DELIVERABLE / EVENT DUE BY
DISTRIBUTION
11 6.3 List of Equipment With Proposal
9.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS).
The PRS establishes key elements of Contractor performance that represent “mission essential” service requirements, which are identified in the table below in the “Service Output” column. The “Performance Objective” column represents the standard against which Contractor performance will be measured in relation to accomplishment of the corresponding service output. The performance objective or “standard” describes the minimum acceptable level of service by the Contractor for satisfactory performance. The “Acceptable Quality Level (AQL)” column displays the maximum allowable deviation from the performance objective, which, if exceeded, evokes the negative incentive specified in the table below.
Service Output Performance Objective Acceptable Quality Level
(AQL)
Positive Incentive Negative incentive
1.UHP Water Jet Blasting
(PWS 2.1)
Achieve WJ-2/L standard on 100% of designated accessible surfaces.
+/- 0% = 100% required performance;
no defects permitted
Allows the contractor to demobilize high-cost UHP equipment faster, reducing daily overhead on the task order.
Re-performance of deficient areas at the Contractor's expense.
2. Mechanical Power/Hand Tooling
(PWS 2.2)
Mechanical Power/Hand Tooling in accordance with Task 2.2
+/- 0% = 100% required performance;
no defects permitted
Prevents work-stoppage and allows the contractor's crew to move seamlessly to the next vessel section.
Re-performance of deficient areas at the Contractor's expense.
Withholding of acceptance/payment for the task order until corrected
(AQL)
Positive Incentive Negative incentive
3. Containment (PWS 2.3)
100% capture of process liquids and solids with zero discharge. No containment breaches.
+/- 0% = 100% required performance;
no defects permitted
Authorization to conduct concurrent blasting operations across multiple vessel zones based on demonstrated containment reliability
Immediate work stoppage at the Contractor's expense until containment is fully reestablished and accepted by the COR.
The Contractor is held solely liable for all costs associated with cleanup and any fines imposed upon the Yard.
4. Clean-up and Disposal (2.4)
Work areas vacuumed daily. Debris collected and disposed of per the approved plan.
+/- 5% = at least 95% compliant performance
Expedited COR sign-off on completed task orders, leading to faster demobilization invoice processing.
Work stoppage on surface preparation activities. The COR will direct the Contractor to dedicate labor solely to cleanup activities at no additional cost to the Government. Work order acceptance and payment will be withheld until cleanup is complete
(AQL)
Positive Incentive Negative incentive
5 Mobilization & Response (PWS 2.3)
Commence services within 72 hours of…