CGC WILLIAM TATE REV- 2 Attachment 1 - Pricing Schedule.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- USCGC WILLIAM TATE DRYDOCK REPAIRS
- Solicitation number
- 70ZU02-27-QIBCT0005
- Issued by
- Not on record
About this file
This is a pricing schedule for drydock repairs on the USCGC WILLIAM TATE (WLM-175), a U.S. Coast Guard vessel. The schedule itemizes 54 definite line items and 2 optional line items covering comprehensive maintenance and repair work required during the drydock period. Definite items include hull plating inspections and testing, tank cleaning and inspection (fuel, ballast, and waste systems), preservation of underwater body and decks, renewal and overhaul of propulsion components (Z-Drive units, thrusters), inspection and servicing of deck equipment (hydraulic winches, chain stoppers, anchor windlass), renewal of sea valves and strainers, cathodic protection zinc anode replacement, and various piping system renewals. Optional items include composite labor rate services at $570 per unit and a Government Furnished Property (GFP) report at a not-separately-priced (NSP) rate.
The pricing schedule requires contractors to provide unit prices for each line item, with the total extended price calculated by multiplying unit price by the quantity of one for each item. The schedule culminates in separate totals for definite items, option items, and combined definite and optional items. Item D-001 (Fire Prevention Requirements) and item O-00B (GFP Report) are both marked as NSP, indicating these costs are not separately priced in the contractor's proposal. This pricing format is typical for government construction and repair contracts, allowing for detailed cost tracking and potential scope modifications through the optional items.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CGC WILLIAM TATE
| PRICING SCHEDULE FOR | ||||
| CGC WILLIAM TATE (WLM-175) DRYDOCK | ||||
| ITEM | DESCRIPTION | UNIT PRICE | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | 1 | NSP |
| D-002 | Hull Plating, U/W Body, Inspect | 1 | ||
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing | 1 | ||
| D-004 | Hull Plating, Freeboard, Ultrasonic Testing | 1 | ||
| O-005 | U/W Body, Preserve, 100 percent | 1 | ||
| O-006 | U/W Body, Preserve, Partial, Condition B | 1 | ||
| D-007 | Appendages, U/W, Leak Test | 1 | ||
| D-008 | Chain Lockers, Clean and Inspect | 1 | ||
| D-009 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | 1 | ||
| D-010 | Tanks, MP Fuel Service, Clean and Inspect | 1 | ||
| D-011 | Tanks, Ballast, Clean and Inspect | 1 | ||
| D-012 | Tanks, Dirty Oil and Waste, Clean and Inspect | 1 | ||
| D-013 | Hydraulically Operated Cargo Hatch, Inspect and Service | 1 | ||
| D-014 | Z-Drive Propulsion Unit, Renew, Drydock | 1 | ||
| D-015 | Fathometer Transducer, Renew | 1 | ||
| D-016 | Underwater Speed Log, Transducers, Renew | 1 | ||
| D-017 | Sea Valves and Waster Pieces, Overhaul Or Renew | 1 | ||
| D-018 | Sea Strainers, Duplex, All Sizes, Overhaul | 1 | ||
| D-019 | Sea Bay, Clean and Inspect | 1 | ||
| D-020 | Thruster Unit (General), Overhaul | 1 | ||
| D-021 | Thruster Unit Bearings, Renew | 1 | ||
| D-022 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | 1 | ||
| D-023 | Hydraulic Chain Stoppers, Inspect and Service | 1 | ||
| D-024 | Hydraulic Crossdeck Winches, Inspect And Service | 1 | ||
| D-025 | Hydraulic Inhaul Winch, Inspect And Service | 1 | ||
| D-026 | Mechanical Chain Stoppers, Inspect and Service | 1 | ||
| D-027 | Anchor Windlass, Inspect And Service | 1 | ||
| D-028 | Anchor Chains and Ground Tackle, Inspect and Repair | 1 | ||
| D-029 | Warping Capstan (Aft), Inspect and Service | 1 | ||
| D-030 | Single Point Davit, Disassemble and Inspect | 1 | ||
| D-031 | Buoy Crane, Inspect And Service | 1 | ||
| D-032 | Chain Locker, Preserve, 100 Percent | 1 | ||
| D-033 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | 1 | ||
| D-034 | Cathodic Protection, Zinc Anodes, Renew, | 1 | ||
| D-035 | Drydock | 1 | ||
| D-036 | Temporary Services, Provide - Cutter | 1 | ||
| D-037 | Sea Trial Performance, Support, Provide | 1 | ||
| D-038 | Sewage Service Piping COV, Install | 1 | ||
| D-039 | Sewage Vent Piping, Renew | 1 | ||
| D-040 | Fuel Overflow (OVFL) Piping, Renew | 1 | ||
| D-041 | Line Locker, Preserve | 1 | ||
| D-042 | Deck Covering, Interior, Wet and Dry, Renew | 1 | ||
| D-043 | Bilges, Preserve | 1 | ||
| D-044 | Cargo Hold Deck Inspection and Repair | 1 | ||
| D-045 | Fo'c'sle Bulkhead Inspection and Repair | 1 | ||
| D-046 | Shore Power Cable Rack Foundation Renew | 1 | ||
| D-047 | Remote Cutoff Valve Deck-box Renew | 1 | ||
| D-048 | Sea Strainers, All Sizes, Renew | 1 | ||
| D-049 | Z-Drive Input Drive Shaft, Bearings Inspect | 1 | ||
| D-050 | Hull Plating Freeboard (Buoy Port Areas), Preserve | 1 | ||
| D-051 | Cargo Hold Deck, Preserve 100% | 1 | ||
| D-052 | Buoy Deck Pad-Eyes, Repair | 1 | ||
| D-053 | Cargo Hatch Hinge, Modify | 1 | ||
| D-054 | Anchor Chain Stoppers and Foundations, Renew | 1 | ||
| O-00A | Composite Labor Rate | 570 | ||
| D-00B | GFP Report | NSP | EA | NSP |
| Total Price of Definite Items | ||||
| Total Price of Option Items | ||||
| Total Price of Definite and Optional Items |