CGC WILLIAM TATE REV- 1 Attachment 1 - Pricing Schedule.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- USCGC WILLIAM TATE DRYDOCK REPAIRS
- Solicitation number
- 70ZU02-27-QIBCT0005
- Issued by
- Not on record
About this file
This is a Pricing Schedule for the USCGC William Tate drydock repairs solicitation. The document is an Excel spreadsheet template designed to capture labor rates, material costs, and other pricing elements required for bidders to submit their financial proposals for the vessel repair work. The pricing schedule outlines line items for various repair services, labor categories, overhead rates, and fee structures that contractors must complete to provide a comprehensive cost estimate for the drydock repairs project. The schedule includes columns for unit pricing, quantities, and extended costs, allowing for transparent calculation of the total contract price. Bidders are required to populate this template with their proposed rates and costs in accordance with the solicitation requirements, ensuring standardized pricing submissions that facilitate fair evaluation and comparison among competing offers.
The specific labor rates, material markups, and fee percentages must align with the contractor's cost accounting practices and the Statement of Work (SOW) or Performance Work Statement (PWS) requirements outlined in the main solicitation documents for USCGC William Tate (WLM 560). This pricing template is a critical component of the technical and business proposal submission package and must be completed accurately and thoroughly to demonstrate pricing competitiveness and cost reasonableness for the Coast Guard's evaluation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CGC WILLIAM TATE
| PRICING SCHEDULE FOR | ||||
| CGC WILLIAM TATE (WLM-175) DRYDOCK | ||||
| ITEM | DESCRIPTION | UNIT PRICE | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | 1 | NSP |
| D-002 | Hull Plating, U/W Body, Inspect | 1 | ||
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing | 1 | ||
| D-004 | Hull Plating, Freeboard, Ultrasonic Testing | 1 | ||
| O-005 | U/W Body, Preserve, 100 percent | 1 | ||
| O-006 | U/W Body, Preserve, Partial, Condition B | 1 | ||
| D-007 | Appendages, U/W, Leak Test | 1 | ||
| D-008 | Chain Lockers, Clean and Inspect | 1 | ||
| D-009 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | 1 | ||
| D-010 | Tanks, MP Fuel Service, Clean and Inspect | 1 | ||
| D-011 | Tanks, Ballast, Clean and Inspect | 1 | ||
| D-012 | Tanks, Dirty Oil and Waste, Clean and Inspect | 1 | ||
| D-013 | Hydraulically Operated Cargo Hatch, Inspect and Service | 1 | ||
| D-014 | Z-Drive Propulsion Unit, Renew, Drydock | 1 | ||
| D-015 | Fathometer Transducer, Renew | 1 | ||
| D-016 | Underwater Speed Log, Transducers, Renew | 1 | ||
| D-017 | Sea Valves and Waster Pieces, Overhaul Or Renew | 1 | ||
| D-018 | Sea Strainers, Duplex, All Sizes, Overhaul | 1 | ||
| D-019 | Sea Bay, Clean and Inspect | 1 | ||
| D-020 | Thruster Unit (General), Overhaul | 1 | ||
| D-021 | Thruster Unit Bearings, Renew | 1 | ||
| D-022 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | 1 | ||
| D-023 | Hydraulic Chain Stoppers, Inspect and Service | 1 | ||
| D-024 | Hydraulic Crossdeck Winches, Inspect And Service | 1 | ||
| D-025 | Hydraulic Inhaul Winch, Inspect And Service | 1 | ||
| D-026 | Mechanical Chain Stoppers, Inspect and Service | 1 | ||
| D-027 | Anchor Windlass, Inspect And Service | 1 | ||
| D-028 | Anchor Chains and Ground Tackle, Inspect and Repair | 1 | ||
| D-029 | Warping Capstan (Aft), Inspect and Service | 1 | ||
| D-030 | Single Point Davit, Disassemble and Inspect | 1 | ||
| D-031 | Buoy Crane, Inspect And Service | 1 | ||
| D-032 | Chain Locker, Preserve, 100 Percent | 1 | ||
| D-033 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | 1 | ||
| D-034 | Cathodic Protection, Zinc Anodes, Renew, | 1 | ||
| D-035 | Drydock | 1 | ||
| D-036 | Temporary Services, Provide - Cutter | 1 | ||
| D-037 | Sea Trial Performance, Support, Provide | 1 | ||
| D-038 | Sewage Service Piping COV, Install | 1 | ||
| D-039 | Sewage Vent Piping, Renew | 1 | ||
| D-040 | Fuel Overflow (OVFL) Piping, Renew | 1 | ||
| D-041 | Line Locker, Preserve | 1 | ||
| D-042 | Deck Covering, Interior, Wet and Dry, Renew | 1 | ||
| D-043 | Bilges, Preserve | 1 | ||
| D-044 | Cargo Hold Deck Inspection and Repair | 1 | ||
| D-045 | Fo'c'sle Bulkhead Inspection and Repair | 1 | ||
| D-046 | Shore Power Cable Rack Foundation Renew | 1 | ||
| D-047 | Remote Cutoff Valve Deck-box Renew | 1 | ||
| D-048 | Sea Strainers, All Sizes, Renew | 1 | ||
| D-049 | Z-Drive Input Drive Shaft, Bearings Inspect | 1 | ||
| D-050 | Hull Plating Freeboard (Buoy Port Areas), Preserve | 1 | ||
| D-051 | Cargo Hold Deck, Preserve 100% | 1 | ||
| D-052 | Buoy Deck Pad-Eyes, Repair | 1 | ||
| D-053 | Cargo Hatch Hinge, Modify | 1 | ||
| D-054 | Anchor Chain Stoppers and Foundations, Renew | 1 | ||
| O-00A | Composite Labor Rate | 57000 | ||
| D-00B | GFP Report | NSP | EA | NSP |
| Total Price of Definite Items | ||||
| Total Price of Option Items | ||||
| Total Price of Definite and Optional Items |
File details come from the government source that posted it. Updated .