USCGC KUKUKU FY27 RFCs Answers.pdf
PDF 74 KB Posted
- Attached to
- CGC KUKUI DRYDOCK
- Solicitation number
- 70ZU0227QIBCT0001
- Issued by
- Not on record
About this file
This is a Questions and Answers (Q&A) document for USCGC KUKUKU FY27, a federal contract opportunity for maintenance and repair services on a U.S. Coast Guard cutter vessel.
The document addresses twelve contractor inquiries regarding various work items and optional tasks specified in the solicitation. Key clarifications provided include: Work Item 53 (Temporary Services for Cutter) requires parking for 5 vehicles, berthing for 8 males and 6 females, 40 hours of heavy lift equipment, and 2,000 gallons per day of potable water at 60 psig. Work Item 15 (Ballast Tank Cleaning) corrects tank locations, with the 4,108-gallon tank at 4-30-3-W and the 11,711-gallon tank at 4-21-0-W. Work Item 53 clarifies that three Coast Guard drawings will be provided to contractors: 225-WLB-512-1 Rev H (HVAC Diagram), 225-WLB-320-2 Rev G (MMA HVAC System Electrical Power & Control), and 225-WLB-320-19 Rev F (MMA Electrical One-Line Diagram). Work Item D-046 (Exterior Deck Preservation) confirms that channel areas for gaskets and hydraulic chain stopper pockets must be prepped and painted, with gaskets replaced. Work Item D-035 (Anchor Windlass) requires completion of all listed inspection and service tasks. Work Item D-060 (Forward Hydraulic Unit) specifies 1,600 gallons of Mobil DTE 10 Excel 46 Hydraulic oil must be pumped out and disposed of, with new oil supplied to two 800-gallon HPU reservoirs; each HPU contains two 150 HP motors driving four hydraulic pumps with detailed technical specifications provided. Work Items D-074 and D-076 (Controllable Pitch Propeller services) confirm the CPP system contains Shell Biodegradable Hydraulic Fluid 68.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC KUKUKU FY27
QUESTION #01: SOLICITATION SECTION: Work Item 53 PARA NO. 3.2
OPTIONAL ITEM NO. PARA NO. TITLE: Temporary Services, Provide - Cutter
In work item 53 temporary services, Table 1 -Service Selection has several missing fields of information. Can you please provide the following information?
Parking: How many spaces needed?
Berting: How many male and female?
Heavy Lift Equipment: how many days, hours, or # of lifts are needed?
Potable Water: How many gallons per day are needed?
And any other information you’d like to add for us to account for in our pricing.
ANSWER: Parking For 5 vehicles. Berthing: 8 Male 6 Female provided during disruption of berthing areas. Heavy lift equipment: 40 hours. 2000 Gallons/Day at 60 psig.
QUESTION # 02: SOLICITATION SECTION: Work Item 15 PARA NO. Table 1
OPTIONAL ITEM NO. PARA NO. TITLE: Tanks, Ballast, Clean and Inspect
In work item 15 the tank list in Table 1 shows two tanks with the same location, 4-21-0-W, but one has a capacity of 11,711 gal and the other 4,108 gal. What is the correct location of these two tanks?
ANSWER: The 4,108 gal ballast tank is located at 4-30-3-W. The 11,711 gal tank is still located at 4-21-0-W.
QUESTION #03:OPTIONAL ITEM NO. PARA NO. TITLE: Electric Heaters, Renew
We need two of the drawings listed as references. Please provide the following two drawings: 225-WLB-512-1, Rev H, HVAC Diagram 225-WLB-320-19, Rev F, MMA Electrical One-Line Diagram.
ANSWER: KS please provide contractor with drawings:
Coast Guard Drawing 225-WLB-512-1, Rev H, HVAC Diagram
Coast Guard Drawing 225-WLB-320-2, Rev G, MMA HVAC Sys Electrical Power & Control
Coast Guard Drawing 225-WLB-320-19, Rev F, MMA Electrical One-Line Diagram
QUESTION #04:OPTIONAL ITEM NO. D-046 PARA NO. 4.1.1
TITLE Decks-Exterior (Buoy or : Construction Deck) Preserve 100%
On the SORS Hatch and the Hydraulic Cargo Hatch, is the channel areas where the gaskets are glued in, are these areas also included in the areas to be prepped and painted? Is the Contractor to replace the gaskets on both the hatches?
ANSWER: Yes to both questions, the channel area is to be prepped and painted and the gaskets are to be replaced on both hatches.
QUESTION #05: OPTIONAL ITEM NO. D-019 PARA NO. Table 1
TITLE: Heat Exchangers, Clean, Inspect and Hydro In Table 1 for the heat exchangers to be cleaned and tested, is there a Thruster Generator Heat Exchanger? If there is, could the Coast Guard give the Contractor information on this heat exchanger (make, model, size, location)?
ANSWER: There is no thruster generator heat exchanger, please disregard that.
QUESTION #06 OPTIONAL ITEM NO. D-020 PARA NO. ALL
TITLE: SSDG Isolation Mounts, Renewal On the KUKUI earlier this year, this Work Item was to be done on the Pier Side Contract. Was this Work Item accomplished already or was this Item cancelled? Comparing the Pier Side Contract Specifications earlier this year, Work
Item D-032 to the Specification of now Work Item D-020, there is a lot of text missing to explain what is to be accomplished. Could the Coast Guard review and compare the two Specifications and give the Contractor a more detailed Specification of what is to be done?
On Paragraph 1.2 Government Furnished Property, all of the materials in the list are crossed out. Is the Government not supplying these Isolation Mounts? What about the (12) twelve Sole Plates, is the Government furnishing these sole plates? In Paragraph 3.2.2.1, it states the Isolation Mounts are to be provided GFE. Who is supplying the Isolation Mounts?
Are the new Isolation Mounts to be installed on Sole Plates? Who would be supplying the Sole Plates? These Isolation Mounts and Sole Plates could be long lead time items?
QUESTION # 07 OPTIONAL ITEM NO. D-035 PARA NO. 3.2 Table 1
TITLE: Anchor Windlass, Inspect and Service In the Anchor Windlass specification, Paragraph 3.2, Table 1, Task 3, in the Task Type column, it doesn’t explain what task is to be done (service and inspect or disassemble and inspect)? Could the Coast Guard verify which task is to be done?
ANSWER: All tasks listed are to be completed. Refer to column 4 on which component each task refers to.
QUESTION #08: OPTIONAL ITEM NO. D-086 PARA NO. Table 2
TITLE: Compressed Air Receivers and System Valves, All Clean, Inspect, Hydro and Lift In Table 2 for the relief valves and the reducing valve, there is numerous relief valves without stated sizes listed. Could the Coast Guard furnish the sizes for all of the relief valves for bidding purposes?
ANSWER: This WI is a Clean, Inspect, Hydro, and Lift and does not require new valves.
Should a valve fail, it will be a direct swap by the contractor. Valve sizes are not available.
QUESTION #09: OPTIONAL ITEM NO. D-033 PARA NO. 3.4.3
TITLE: Thruster Units (Bow and Stern), Overhaul Does the bow and stern thrusters currently have Shell Biodegradable Hydraulic Fluid 68 in them?
ANSWER: Yes both thruster units have the Shell Biodegradable Hydraulic Fluid 68.
QUESTION # 10:OPTIONAL ITEM NO. D-060 PARA NO. 3.1.4 & 3.2 Table 1
Task 4 TITLE: Forward Hydraulic Unit, Inspect and Service
In Paragraph 3.1.4, it states 1600 gallons of Mobil DTE 10 Excel 46 Hydraulic oil (800 gal/tank), is the Contractor to pump out and dispose of 1600 gallons of hydraulic oil or 800 gallons of oil? In Paragraph 3.2, Table 1, Task 4, is the Contractor to purchase and renew 1600 gallons or 800 gallons of Mobil DTE 10 Excel 46 Hydraulic oil into the systems tank or tanks? How Many hydraulic tanks are to be pumped out and refilled? How many hydraulic pumps and electric motors are there per HPU unit? Could the Coast Guard supply the information off the electric motors and hydraulic pumps data plates (make, model, horsepower, volts, amps, size, pressures, etc.)? Paragraph 3.2, Table 1, Task 2 Service and Inspect, for the Electric Motors, is this inspection be to done in place without removing the motors?
ANSWER: In Paragraph 3.1.4, it states 1600 gallons of Mobil DTE 10 Excel 46 Hydraulic oil (800 gal/tank), is the Contractor to pump out and dispose of 1600 gallons of hydraulic oil or 800 gallons of oil?
The contractor must pump out and dispose of 1600 gallons of hydraulic oil. HPU-1 and HPU-2 each have an integral, 800-gallon reservoir.
In Paragraph 3.2, Table 1, Task 4, is the Contractor to purchase and renew 1600 gallons or 800 gallons of Mobil DTE 10 Excel 46 Hydraulic oil into the systems tank or tanks?
1600 gallons, see above.
How Many hydraulic tanks are to be pumped out and refilled?
Two, see above.
How many hydraulic pumps and electric motors are there per HPU unit? Could the Coast Guard supply the information off the electric motors and hydraulic pumps data plates (make, model, horsepower, volts, amps, size, pressures, etc.)?
Details from Tech Pub 4634:
Each HPU consists of two (2) – 150 hp, 460 VAC, 3 phase, 60 Hz motors driving four (4) hydraulic pumps (hydraulically sequenced) and one (1) circulation pump (oil cooler).
The maximum flow of the pumps has been set to reduce the combined total horsepower of the pumps to the available 150 hp for each electric motor. The electric motors should not be in overload condition when all pumps are at full stroke.
The pumps are individually pressure compensated, and are nominally set to full stroke at approximately 2575 psi (PVK 140 #1), 2500 psi (PVK 140 #2), 2425 psi (PVG 130 #1) and 2350 psi (PVG 130 #2).
Hydraulic pump ratings:
PVK140 (pressure compensated, variable displacement, axial pump; OILGEAR P/N:
PVK140-A1UV-RDFS-P1NNSNCS) – 63 gpm max. @ 1800 rpm, 5000 psi, 8.61 cid, cw rotation.
PVG130 (pressure compensated, variable displacement, axial pump; OILGEAR P/N:
PVG130-C2UV-RDFK-P1NNSNBN) – 57.6 gpm max. @ 2400 rpm, 3750 psi, 7.94 cid, cw rotation.
P30 (gear pump, 1” gear width; P/N: P30A197BEUJ1025) – 14 gpm max. @ 1800 rpm, 2500 psi, cw rotation.
Paragraph 3.2, Table 1, Task 2 Service and Inspect, for the Electric Motors, is this inspection be to done in place without removing the motors?
The tasking was written to allow for in-place inspection, but location is intentionally not specified.
QUESTION #11: OPTIONAL ITEM NO. D-046 PARA NO. 4.1.1
TITLE: Decks- Exterior (Buoy or Construction Deck), Preserve 100%
Is the surfaces of the Hydraulic Chain Stopper Pockets and Foundations included in the prepping and painting for this Work Item?.
Answer: Yes. That is correct.
QUESTION #12 :OPTIONAL ITEM: D-074 & D-076 PARA NO. 3.3 thru 3.3.4 – 3.6 thru 3.6.6 & 1.1, 3.2 thru 3.2.4.
Title: Controllable Pitch Propeller Hub, General Maintenance With
EAL, Perform & Controllable Pitch Propeller, Fluid Replace
In Work Item D-074, it states in great detail for the draining of the existing CPP oil from the hub & head tank only on (paragraphs 3.3 thru 3.3.4) and its states in great detail for the refilling the CPP oil system (paragraphs 3.6 thru 3.6.6), does the CPP system currently have the Shell Biodegradable Hydraulic Fluid 68 in it? In Work Item D-076, it states in paragraph
1.1 INTENT- to drain the existing Mobil DTE 10 Excel 46 Hydraulic Fluid from the system.
The item in paragraph 3.2 thru 3.2.4 details to drain the CPP system (hub, head tank and sump), is the existing oil in the CPP system Mobil DTE 10 Excel 46 or the Shell Biodegradable Hydraulic Fluid?.
Answer: It is the shell biodegradable Hydraulic Fluid.
File details come from the government source that posted it. Updated .