Exhibit A Notional Contract Line Item Number (CLIN), Schedule of Values, and RPUID Mapping Example Purpose of Exhibit:
This exhibit is a fictional example intended only to support industry feedback. It shows how a high-dollar design-build construction project could involve more than 25 CLINs, sub-CLINs, or Schedule of Values entries, and how those entries could potentially be tied to real property assets or RPUIDs.
This exhibit does not represent an actual Coast Guard project, requirement, solicitation, acquisition strategy, or preferred contract structure.
A.1 Mock Project Overview Project Name: Notional Multi-Facility Waterfront Modernization Project Project Type: Design-build construction Project Description: Renovation and modernization of multiple facilities, utilities, waterfront infrastructure, and site systems at a Coast Guard installation.
Notional project elements:
a. Building renovations
b. Pier repairs
c. Utility upgrades
d. Site electrical improvements
e. Stormwater improvements
f. Roadway and parking improvements
g. Security and perimeter improvements
h. Commissioning and closeout documentation This type of project could reasonably exceed 25 CLINs or sub-CLINs. Depending on final design, number of assets, phasing, funding structure, and reporting requirements, the project could include dozens or hundreds of CLINs, sub-CLINs, exhibit line items, or Schedule of Values entries.
A.2 Notional Real Property Asset List
| Asset No. |
| Notional RPUID |
| Asset Name |
| Asset Type |
| Description |
| 1 |
| RPUID-000101 |
| Administration Building |
| Building |
| Office and administrative space |
| 2 |
| RPUID-000102 |
| Operations Building |
| Building |
| Mission operations and support space |
| 3 |
| RPUID-000103 |
| Maintenance Building |
| Building |
| Shops and maintenance bays |
| 4 |
| RPUID-000104 |
| Warehouse |
| Building |
| Storage and logistics facility |
| 5 |
| RPUID-000105 |
| Central Utility Plant |
| Utility Facility |
| Mechanical and electrical plant |
| 6 |
| RPUID-000106 |
| Pier A |
| Waterfront Structure |
| Berthing and operational pier |
| 7 |
| RPUID-000107 |
| Bulkhead Segment 1 |
| Waterfront Structure |
| Shoreline stabilization |
| 8 |
| RPUID-000108 |
| Electrical Distribution System |
| Utility System |
| Site electrical distribution |
| 9 |
| RPUID-000109 |
| Water Distribution System |
| Utility System |
| Potable water distribution |
| 10 |
| RPUID-000110 |
| Sanitary Sewer System |
| Utility System |
| Sanitary sewer system |
| 11 |
| RPUID-000111 |
| Stormwater System |
| Utility System |
| Drainage and stormwater infrastructure |
| 12 |
| RPUID-000112 |
| Main Parking Area |
| Pavement |
| Parking and circulation area |
| 13 |
| RPUID-000113 |
| Perimeter Fence and Gates |
| Security Asset |
| Site perimeter and access control |
A.3 Notional CLIN and Sub-CLIN Structure
| CLIN |
| Sub-CLIN |
| Description |
| Notional RPUID |
| Schedule of Values Category |
| 0001 |
| 0001AA |
| Design Services, Project-Wide |
| Multiple |
| Design |
| 0001 |
| 0001AB |
| Permitting and Design Coordination |
| Multiple |
| Design |
| 0001 |
| 0001AC |
| Design Reviews and Submittals |
| Multiple |
| Design |
| 0002 |
| 0002AA |
| Mobilization |
| Multiple |
| General Conditions |
| 0002 |
| 0002AB |
| Project Management |
| Multiple |
| General Conditions |
| 0002 |
| 0002AC |
| Site Safety and Temporary Controls |
| Multiple |
| General Conditions |
| 0002 |
| 0002AD |
| Quality Control |
| Multiple |
| General Conditions |
| 0003 |
| 0003AA |
| Administration Building Demolition |
| RPUID-000101 |
| Demolition |
| 0003 |
| 0003AB |
| Administration Building Structural Repairs |
| RPUID-000101 |
| Structural |
| 0003 |
| 0003AC |
| Administration Building Roofing |
| RPUID-000101 |
| Roofing |
| 0003 |
| 0003AD |
| Administration Building Interiors |
| RPUID-000101 |
| Architectural |
| 0003 |
| 0003AE |
| Administration Building Mechanical |
| RPUID-000101 |
| Mechanical |
| 0003 |
| 0003AF |
| Administration Building Electrical |
| RPUID-000101 |
| Electrical |
| 0003 |
| 0003AG |
| Administration Building Fire Protection |
| RPUID-000101 |
| Fire Protection |
| 0003 |
| 0003AH |
| Administration Building Communications |
| RPUID-000101 |
| Communications |
| 0004 |
| 0004AA |
| Operations Building Demolition |
| RPUID-000102 |
| Demolition |
| 0004 |
| 0004AB |
| Operations Building Structural Repairs |
| RPUID-000102 |
| Structural |
| 0004 |
| 0004AC |
| Operations Building Interiors |
| RPUID-000102 |
| Architectural |
| 0004 |
| 0004AD |
| Operations Building Mechanical |
| RPUID-000102 |
| Mechanical |
| 0004 |
| 0004AE |
| Operations Building Electrical |
| RPUID-000102 |
| Electrical |
| 0004 |
| 0004AF |
| Operations Building Fire Alarm |
| RPUID-000102 |
| Life Safety |
| 0004 |
| 0004AG |
| Operations Building Communications |
| RPUID-000102 |
| Communications |
| 0005 |
| 0005AA |
| Maintenance Building Demolition |
| RPUID-000103 |
| Demolition |
| 0005 |
| 0005AB |
| Maintenance Building Bay Improvements |
| RPUID-000103 |
| Architectural |
| 0005 |
| 0005AC |
| Maintenance Building Mechanical |
| RPUID-000103 |
| Mechanical |
| 0005 |
| 0005AD |
| Maintenance Building Electrical |
| RPUID-000103 |
| Electrical |
| 0005 |
| 0005AE |
| Maintenance Building Fire Protection |
| RPUID-000103 |
| Fire Protection |
| 0006 |
| 0006AA |
| Warehouse Roofing |
| RPUID-000104 |
| Roofing |
| 0006 |
| 0006AB |
| Warehouse Loading Dock Repairs |
| RPUID-000104 |
| Architectural/Site |
| 0006 |
| 0006AC |
| Warehouse Electrical Upgrades |
| RPUID-000104 |
| Electrical |
| 0007 |
| 0007AA |
| Central Utility Plant Mechanical Upgrades |
| RPUID-000105 |
| Mechanical |
| 0007 |
| 0007AB |
| Central Utility Plant Electrical Upgrades |
| RPUID-000105 |
| Electrical |
| 0007 |
| 0007AC |
| Central Utility Plant Controls |
| RPUID-000105 |
| Controls |
| 0007 |
| 0007AD |
| Central Utility Plant Commissioning |
| RPUID-000105 |
| Commissioning |
| 0008 |
| 0008AA |
| Pier A Demolition and Preparation |
| RPUID-000106 |
| Waterfront |
| 0008 |
| 0008AB |
| Pier A Structural Repairs |
| RPUID-000106 |
| Waterfront |
| 0008 |
| 0008AC |
| Pier A Utilities |
| RPUID-000106 |
| Utilities |
| 0008 |
| 0008AD |
| Pier A Lighting and Electrical |
| RPUID-000106 |
| Electrical |
| 0008 |
| 0008AE |
| Pier A Safety Appurtenances |
| RPUID-000106 |
| Waterfront |
| 0009 |
| 0009AA |
| Bulkhead Demolition and Preparation |
| RPUID-000107 |
| Waterfront |
| 0009 |
| 0009AB |
| Bulkhead Repairs |
| RPUID-000107 |
| Waterfront |
| 0009 |
| 0009AC |
| Shoreline Stabilization |
| RPUID-000107 |
| Waterfront |
| 0010 |
| 0010AA |
| Electrical Distribution Duct Bank |
| RPUID-000108 |
| Site Electrical |
| 0010 |
| 0010AB |
| Transformers and Switchgear |
| RPUID-000108 |
| Site Electrical |
| 0010 |
| 0010AC |
| Site Lighting |
| RPUID-000108 |
| Site Electrical |
| 0010 |
| 0010AD |
| Electrical Testing |
| RPUID-000108 |
| Testing |
| 0011 |
| 0011AA |
| Water Main Replacement |
| RPUID-000109 |
| Site Utilities |
| 0011 |
| 0011AB |
| Water Service Connections |
| RPUID-000109 |
| Site Utilities |
| 0011 |
| 0011AC |
| Hydrants and Valves |
| RPUID-000109 |
| Site Utilities |
| 0012 |
| 0012AA |
| Sanitary Sewer Replacement |
| RPUID-000110 |
| Site Utilities |
| 0012 |
| 0012AB |
| Manholes and Cleanouts |
| RPUID-000110 |
| Site Utilities |
| 0012 |
| 0012AC |
| Service Laterals |
| RPUID-000110 |
| Site Utilities |
| 0013 |
| 0013AA |
| Stormwater Piping |
| RPUID-000111 |
| Stormwater |
| 0013 |
| 0013AB |
| Inlets and Manholes |
| RPUID-000111 |
| Stormwater |
| 0013 |
| 0013AC |
| Detention or Treatment Features |
| RPUID-000111 |
| Stormwater |
| 0014 |
| 0014AA |
| Parking Area Demolition |
| RPUID-000112 |
| Sitework |
| 0014 |
| 0014AB |
| Subgrade and Base Course |
| RPUID-000112 |
| Paving |
| 0014 |
| 0014AC |
| Asphalt Paving |
| RPUID-000112 |
| Paving |
| 0014 |
| 0014AD |
| Striping and Signage |
| RPUID-000112 |
| Pavement Markings |
| 0014 |
| 0014AE |
| Parking Area Lighting |
| RPUID-000112 |
| Site Electrical |
| 0015 |
| 0015AA |
| Perimeter Fence Removal |
| RPUID-000113 |
| Security/Site |
| 0015 |
| 0015AB |
| New Perimeter Fence |
| RPUID-000113 |
| Security/Site |
| 0015 |
| 0015AC |
| Vehicle Gates |
| RPUID-000113 |
| Security/Site |
| 0015 |
| 0015AD |
| Pedestrian Gates |
| RPUID-000113 |
| Security/Site |
| 0016 |
| 0016AA |
| Project-Wide Testing and Balancing |
| Multiple |
| Testing |
| 0016 |
| 0016AB |
| Project-Wide Commissioning |
| Multiple |
| Commissioning |
| 0016 |
| 0016AC |
| As-Built Drawings |
| Multiple |
| Closeout |
| 0016 |
| 0016AD |
| Operations and Maintenance Manuals |
| Multiple |
| Closeout |
| 0016 |
| 0016AE |
| Training and Turnover |
| Multiple |
| Closeout |
| 0016 |
| 0016AF |
| Final Cleanup and Demobilization |
| Multiple |
| Closeout |
A.4 Notional Summary This mock example includes:
a. 16 primary CLINs
b. 68 sub-CLINs
c. 13 notional real property assets
d. Multiple Schedule of Values categories
e. Some entries tied to individual RPUIDs
f. Some entries tied to multiple assets or project-wide activities A larger project could include hundreds of CLINs, sub-CLINs, exhibit line items, or Schedule of Values entries, depending on the number of facilities, systems, phases, funding sources, and asset-tracking requirements.
A.5 Questions Specific to Exhibit A Industry is invited to comment on the notional example above.
1. Is this type of CLIN/sub-CLIN and Schedule of Values structure practical for a design-build project?
a. Yes
b. No
c. Maybe
d. Not sure
e. Comments: [Open response]
2. Would the structure be easier to manage if RPUIDs were tracked in an exhibit rather than directly in the CLIN structure?
a. Yes
b. No
c. Maybe
d. Not sure
e. Comments: [Open response]
3. Would you prefer fewer CLINs with a detailed Schedule of Values, or more CLINs/sub-CLINs tied to specific assets?
a. Fewer CLINs with detailed Schedule of Values
b. More CLINs/sub-CLINs tied to assets
c. Hybrid approach
d. Depends on the project
e. Comments: [Open response]
4. How, if possible, could this example be re-structured to align each CLIN and/or sub-CLIN to a unique RPUID? What additional considerations are there in doing so?
[Open response]
5. What changes would make the example easier for contractors to price, manage, invoice, and close out?
[Open response]