Exhibit for Industry Survey.docx

DOCX document 30 KB Posted

Attached to
Feedback on CLIN Structure for Design-Build Construction Projects with Capital Asset Identification and Financial Tracking
Solicitation number
70ZS0927SCLINDBAT
Issued by
Not on record

About this file

This file is an exhibit for an industry survey that presents a notional design-build construction project structure for educational and feedback purposes. The exhibit details how a hypothetical Coast Guard waterfront modernization project could be organized using Contract Line Item Numbers (CLINs), sub-CLINs, and Schedule of Values entries tied to Real Property Unique Identifiers (RPUIDs). The mock project encompasses renovation and modernization of multiple facilities including four buildings (Administration, Operations, Maintenance, and Warehouse), utility infrastructure (Central Utility Plant, electrical distribution, water distribution, sanitary sewer, and stormwater systems), waterfront structures (Pier A and Bulkhead Segment 1), pavement (parking area), and security infrastructure (perimeter fence and gates). The notional structure includes 16 primary CLINs with 68 sub-CLINs across 13 real property assets, organized by work categories such as Design, General Conditions, Demolition, Structural, Mechanical, Electrical, Roofing, and Commissioning. The exhibit demonstrates how individual sub-CLINs can be mapped to specific RPUIDs or tagged to multiple assets for project-wide activities.

The Coast Guard seeks industry feedback on the practicality and efficiency of this CLIN structure for future design-build construction projects. Industry respondents are asked to evaluate whether the structure is manageable, whether RPUIDs should be tracked separately from the CLIN structure, and whether fewer CLINs with detailed Schedule of Values or more CLINs tied to specific assets would be preferable. Additional feedback is requested on restructuring options to align each CLIN and sub-CLIN to unique RPUIDs and on modifications to facilitate contractor pricing, management, invoicing, and closeout. This is a pre-solicitation market research initiative for planning purposes only, not a commitment to contract. All survey responses must be submitted to Melissa Ardis at melissa.m.ardis@uscg.mil by December 16, 2026, at 5:00 PM EST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A Notional Contract Line Item Number (CLIN), Schedule of Values, and RPUID Mapping Example Purpose of Exhibit:

This exhibit is a fictional example intended only to support industry feedback. It shows how a high-dollar design-build construction project could involve more than 25 CLINs, sub-CLINs, or Schedule of Values entries, and how those entries could potentially be tied to real property assets or RPUIDs.

This exhibit does not represent an actual Coast Guard project, requirement, solicitation, acquisition strategy, or preferred contract structure.

A.1 Mock Project Overview Project Name: Notional Multi-Facility Waterfront Modernization Project Project Type: Design-build construction Project Description: Renovation and modernization of multiple facilities, utilities, waterfront infrastructure, and site systems at a Coast Guard installation.

Notional project elements:

a. Building renovations

b. Pier repairs

c. Utility upgrades

d. Site electrical improvements

e. Stormwater improvements

f. Roadway and parking improvements

g. Security and perimeter improvements

h. Commissioning and closeout documentation This type of project could reasonably exceed 25 CLINs or sub-CLINs. Depending on final design, number of assets, phasing, funding structure, and reporting requirements, the project could include dozens or hundreds of CLINs, sub-CLINs, exhibit line items, or Schedule of Values entries.

A.2 Notional Real Property Asset List

Asset No.
Notional RPUID
Asset Name
Asset Type
Description
1
RPUID-000101
Administration Building
Building
Office and administrative space
2
RPUID-000102
Operations Building
Building
Mission operations and support space
3
RPUID-000103
Maintenance Building
Building
Shops and maintenance bays
4
RPUID-000104
Warehouse
Building
Storage and logistics facility
5
RPUID-000105
Central Utility Plant
Utility Facility
Mechanical and electrical plant
6
RPUID-000106
Pier A
Waterfront Structure
Berthing and operational pier
7
RPUID-000107
Bulkhead Segment 1
Waterfront Structure
Shoreline stabilization
8
RPUID-000108
Electrical Distribution System
Utility System
Site electrical distribution
9
RPUID-000109
Water Distribution System
Utility System
Potable water distribution
10
RPUID-000110
Sanitary Sewer System
Utility System
Sanitary sewer system
11
RPUID-000111
Stormwater System
Utility System
Drainage and stormwater infrastructure
12
RPUID-000112
Main Parking Area
Pavement
Parking and circulation area
13
RPUID-000113
Perimeter Fence and Gates
Security Asset
Site perimeter and access control

A.3 Notional CLIN and Sub-CLIN Structure

CLIN
Sub-CLIN
Description
Notional RPUID
Schedule of Values Category
0001
0001AA
Design Services, Project-Wide
Multiple
Design
0001
0001AB
Permitting and Design Coordination
Multiple
Design
0001
0001AC
Design Reviews and Submittals
Multiple
Design
0002
0002AA
Mobilization
Multiple
General Conditions
0002
0002AB
Project Management
Multiple
General Conditions
0002
0002AC
Site Safety and Temporary Controls
Multiple
General Conditions
0002
0002AD
Quality Control
Multiple
General Conditions
0003
0003AA
Administration Building Demolition
RPUID-000101
Demolition
0003
0003AB
Administration Building Structural Repairs
RPUID-000101
Structural
0003
0003AC
Administration Building Roofing
RPUID-000101
Roofing
0003
0003AD
Administration Building Interiors
RPUID-000101
Architectural
0003
0003AE
Administration Building Mechanical
RPUID-000101
Mechanical
0003
0003AF
Administration Building Electrical
RPUID-000101
Electrical
0003
0003AG
Administration Building Fire Protection
RPUID-000101
Fire Protection
0003
0003AH
Administration Building Communications
RPUID-000101
Communications
0004
0004AA
Operations Building Demolition
RPUID-000102
Demolition
0004
0004AB
Operations Building Structural Repairs
RPUID-000102
Structural
0004
0004AC
Operations Building Interiors
RPUID-000102
Architectural
0004
0004AD
Operations Building Mechanical
RPUID-000102
Mechanical
0004
0004AE
Operations Building Electrical
RPUID-000102
Electrical
0004
0004AF
Operations Building Fire Alarm
RPUID-000102
Life Safety
0004
0004AG
Operations Building Communications
RPUID-000102
Communications
0005
0005AA
Maintenance Building Demolition
RPUID-000103
Demolition
0005
0005AB
Maintenance Building Bay Improvements
RPUID-000103
Architectural
0005
0005AC
Maintenance Building Mechanical
RPUID-000103
Mechanical
0005
0005AD
Maintenance Building Electrical
RPUID-000103
Electrical
0005
0005AE
Maintenance Building Fire Protection
RPUID-000103
Fire Protection
0006
0006AA
Warehouse Roofing
RPUID-000104
Roofing
0006
0006AB
Warehouse Loading Dock Repairs
RPUID-000104
Architectural/Site
0006
0006AC
Warehouse Electrical Upgrades
RPUID-000104
Electrical
0007
0007AA
Central Utility Plant Mechanical Upgrades
RPUID-000105
Mechanical
0007
0007AB
Central Utility Plant Electrical Upgrades
RPUID-000105
Electrical
0007
0007AC
Central Utility Plant Controls
RPUID-000105
Controls
0007
0007AD
Central Utility Plant Commissioning
RPUID-000105
Commissioning
0008
0008AA
Pier A Demolition and Preparation
RPUID-000106
Waterfront
0008
0008AB
Pier A Structural Repairs
RPUID-000106
Waterfront
0008
0008AC
Pier A Utilities
RPUID-000106
Utilities
0008
0008AD
Pier A Lighting and Electrical
RPUID-000106
Electrical
0008
0008AE
Pier A Safety Appurtenances
RPUID-000106
Waterfront
0009
0009AA
Bulkhead Demolition and Preparation
RPUID-000107
Waterfront
0009
0009AB
Bulkhead Repairs
RPUID-000107
Waterfront
0009
0009AC
Shoreline Stabilization
RPUID-000107
Waterfront
0010
0010AA
Electrical Distribution Duct Bank
RPUID-000108
Site Electrical
0010
0010AB
Transformers and Switchgear
RPUID-000108
Site Electrical
0010
0010AC
Site Lighting
RPUID-000108
Site Electrical
0010
0010AD
Electrical Testing
RPUID-000108
Testing
0011
0011AA
Water Main Replacement
RPUID-000109
Site Utilities
0011
0011AB
Water Service Connections
RPUID-000109
Site Utilities
0011
0011AC
Hydrants and Valves
RPUID-000109
Site Utilities
0012
0012AA
Sanitary Sewer Replacement
RPUID-000110
Site Utilities
0012
0012AB
Manholes and Cleanouts
RPUID-000110
Site Utilities
0012
0012AC
Service Laterals
RPUID-000110
Site Utilities
0013
0013AA
Stormwater Piping
RPUID-000111
Stormwater
0013
0013AB
Inlets and Manholes
RPUID-000111
Stormwater
0013
0013AC
Detention or Treatment Features
RPUID-000111
Stormwater
0014
0014AA
Parking Area Demolition
RPUID-000112
Sitework
0014
0014AB
Subgrade and Base Course
RPUID-000112
Paving
0014
0014AC
Asphalt Paving
RPUID-000112
Paving
0014
0014AD
Striping and Signage
RPUID-000112
Pavement Markings
0014
0014AE
Parking Area Lighting
RPUID-000112
Site Electrical
0015
0015AA
Perimeter Fence Removal
RPUID-000113
Security/Site
0015
0015AB
New Perimeter Fence
RPUID-000113
Security/Site
0015
0015AC
Vehicle Gates
RPUID-000113
Security/Site
0015
0015AD
Pedestrian Gates
RPUID-000113
Security/Site
0016
0016AA
Project-Wide Testing and Balancing
Multiple
Testing
0016
0016AB
Project-Wide Commissioning
Multiple
Commissioning
0016
0016AC
As-Built Drawings
Multiple
Closeout
0016
0016AD
Operations and Maintenance Manuals
Multiple
Closeout
0016
0016AE
Training and Turnover
Multiple
Closeout
0016
0016AF
Final Cleanup and Demobilization
Multiple
Closeout

A.4 Notional Summary This mock example includes:

a. 16 primary CLINs

b. 68 sub-CLINs

c. 13 notional real property assets

d. Multiple Schedule of Values categories

e. Some entries tied to individual RPUIDs

f. Some entries tied to multiple assets or project-wide activities A larger project could include hundreds of CLINs, sub-CLINs, exhibit line items, or Schedule of Values entries, depending on the number of facilities, systems, phases, funding sources, and asset-tracking requirements.

A.5 Questions Specific to Exhibit A Industry is invited to comment on the notional example above.

1. Is this type of CLIN/sub-CLIN and Schedule of Values structure practical for a design-build project?

a. Yes

b. No

c. Maybe

d. Not sure

e. Comments: [Open response]

2. Would the structure be easier to manage if RPUIDs were tracked in an exhibit rather than directly in the CLIN structure?

a. Yes

b. No

c. Maybe

d. Not sure

e. Comments: [Open response]

3. Would you prefer fewer CLINs with a detailed Schedule of Values, or more CLINs/sub-CLINs tied to specific assets?

a. Fewer CLINs with detailed Schedule of Values

b. More CLINs/sub-CLINs tied to assets

c. Hybrid approach

d. Depends on the project

e. Comments: [Open response]

4. How, if possible, could this example be re-structured to align each CLIN and/or sub-CLIN to a unique RPUID? What additional considerations are there in doing so?

[Open response]

5. What changes would make the example easier for contractors to price, manage, invoice, and close out?

[Open response]

File details come from the government source that posted it. Updated .