This file contains Final Questions and Answers for RFQ 70ZL1927QELIZ0001 as of November 23, 2026. The document addresses twelve substantive questions from bidders regarding wage determinations, equipment specifications, bonding requirements, project scope, and operational parameters. For wage determination, bidders must use VA20260176 (building) for building-related construction work rather than the initially referenced heavy equipment determination. The existing booster pump is a Bluffton 3 HP, 60 Hz, 3-phase unit, and the government will accept replacing both the pump and control set together if necessary for compatibility. The sand filter basin measures 20 feet by 21 feet with sand depth varying from 6 to 10 inches across locations.
Regarding bonding requirements, only a payment bond or letter of credit is required under 52.228-13, with no performance bond mandated. Water outages should be minimized to the least possible time with no exact limit provided, and bottled water is acceptable for the Business Continuity Plan along with temporary means for toilets and showers. The scope constitutes a stand-alone construction project with no incumbent contractor. The government clarified that this is strictly a like-kind replacement scope; no alternative configurations such as alternating-tank water softener systems are acceptable, and no prefilter installation is currently included despite being referenced in background information. The government will accept modifying the existing bulkhead outlet with a tee to feed pumps and drain the tank rather than adding a separate outlet. Well sump pump automation must run in auto mode, with component replacement acceptable if it restores functionality, or the entire control box may be replaced if diagnostics reveal deeper issues. Contractors must provide material-handling equipment, as the government forklift is available only for minor equipment movement near the site. All quotes must include complete scope pricing and capability; partial quotes will not be considered.
Questions and Answers
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 70ZL1927QELIZ0001
Final Questions and Answers as of November 23, 2026
1. Wage determination: VA20260214 (heavy) has no plumber or pipefitter rate. Will a building wage determination be added, or should we request a conformance?
Answer: For building-related construction work, wage determination VA20260176 (building) should be used. A copy of this wage determination is attached.
2. Can you post the booster pump nameplate data (make, model, HP, voltage, phase, GPM, PSI) and the storage tank’s material, capacity and size?
Answer: See the included photo of the data plate below. This is a Bluffton 3 HP, 60 Hz, 3 phase pump.
3. What are the sand filter basin’s dimensions and its current sand depth?
Answer: Dimensions are 20 ft x 21 ft. The depth of sand varies by location ranging from 6 inches to 10 inches in other spots.
4. Under 52.228-13, is only a payment bond or letter of credit required, with no performance bond?
Answer: Correct.
5. What is the longest station water outage allowed, and is temporary water (tanker or bottled) acceptable for the Business Continuity Plan?
Answer: Outages should be for the least possible time to complete each repair, however there is currently no exact limit as long as a continuity plan is in place. Bottled water will suffice. Temporary means of water for toilets and showers would also be needed.
6. Is there an incumbent contractor for this requirement? If so, please provide the incumbent’s name, the current contract number and the prior award amount.
Answer: There is no incumbent contractor- this is a stand-alone construction project.
7. Booster Pumps and Controls: Would the Government consider replacing the existing booster pump and control set together if necessary to ensure compatibility? Our representative noted that newer models may have slight differences that could affect direct replacement.
Answer: Yes. The Government will consider replacing both together if necessary for compatibility.
8. Water Softener System: During the site assessment, it was observed that the existing water softener system does not appear to have a prefilter, although the background information references one. Would the Government clarify whether a prefilter is currently installed or included in the required scope? Additionally, would an alternating-tank water softener system be acceptable as an alternative to the existing single-tank electric units, provided it meets the performance requirements?
Answer: No prefilter is currently installed. While one is needed, it is not in the current scope of work. This is a like-kind replacement scope. No. Alternative configurations would require an engineering change. The scope remains strictly like-kind.
9. Water Storage Tank: Would the Government consider modifying the existing bulkhead outlet by reworking the fittings and installing a tee to allow water to feed the pumps and/or drain the tank, rather than adding a separate outlet and draining the tank for that modification?
Answer: Yes. Modifying the existing bulkhead with a tee to feed pumps/drain the tank is acceptable.
10. Well Sump Pump Automation: Could the Government provide any additional details regarding the existing sump pump automation system and the specific repair or replacement expected? It is unclear whether the requirement involves replacing a component or upgrading the entire control box.
Answer: The system must run in auto mode. If replacing a single component restores this, it meets scope. If diagnostics reveal deeper issues, it may escalate to replacing the entire control box.
11. Sand Quantity and Equipment: Based on the site assessment, our representative estimates that approximately 730 cubic feet of sand may be required. Could the Government confirm whether a forklift or other material-handling equipment will be available onsite, or whether the contractor is expected to provide it?
Answer: The contractor is expected to provide material-handling equipment. Government forklift is onsite and available only for minor moving of equipment near the site.
12. Partial or Complete Proposals: Would the Government accept proposals covering individual portions of the work, or must each offer include pricing and capability for the complete scope of work?
Answer: Quotes must include all work contained in the solicitation. No partial quotes will be considered.