NAN-2022-00437-TEC_USCG dated Complete Work form.pdf
PDF 119 KB Posted
- Attached to
- DEMO D1 ATON HUDSON RIVER, NY & QUINCY BAY, MA
- Solicitation number
- 70Z0G123BABCD0142
About this file
This document contains a completion of work form for a US Army Corps of Engineers permit and details of a related federal solicitation. The completion of work form is for Permit No. NAN-2022-00437-TEC issued on March 29, 2023 to the United States Coast Guard CEU Providence for work in the Hudson River in Stuyvesant, New York expiring on March 29, 2026. It requires the permittee to check applicable items and provide details regarding completion, cancellation, deviations, or dredging volumes and disposal locations.
The related solicitation is number 70Z0G123BABCD0142 from the Department of Homeland Security US Coast Guard for demolition of two Aids to Navigation. The general scope of work requires the contractor to provide all labor, materials, equipment, supervision, transportation and disposal to demolish a river light structure in the Hudson River, New York and demolish a submerged structure at a channel light in Quincy Bay, Massachusetts in accordance with the specifications and drawings.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. Army Corps of Engineers, ATTN: CENAN-OP-RU
Upstate Regulatory Field Office 1 Buffington St., Building 10, 3rd Fl. North
Watervliet, New York 12189-4000
CENAN-OP-RU
IMPORTANT
This letter must be completed and mailed to the Upstate New York Section at the above address following completion or cancellation of work authorized under the permit.
Permittee: _United States Coast Guard CEU Providence__ Permit No. NAN-2022-00437-TEC_ Date Permit Issued: March 29, 2023 Expiration Date: March 29, 2026 Waterway: _Hudson River________ City & State: _Stuyvesant, New York___________________
Check and complete applicable item(s) listed below:
____ Work was completed on _________________________.
____ Work will not be performed on the project.
____ Deviation from work authorized in permit is explained below.
____ Other (explain) _________________________________________________ ____ For dredging projects, list the volume of material dredged, and the amount placed at each disposal location (if more than one).
________ cubic yards placed at ____________________________ ________ cubic yards placed at ____________________________ ________ cubic yards placed at ____________________________
Signature of Permittee Date
Fold this form into thirds, with the bottom third facing outward. Tape it together and mail to the address below or EMAIL TO: cenan.rfo@usace.army.mil.
___________________ Place Stamp ___________________ Here
DEPARTMENT OF THE ARMY
U.S. Army Corps of Engineers
ATTN: CENAN-OP-RU
Upstate New York Section
1 Buffington St., Bldg. 10, 3rd Fl. North Watervliet, New York 12189-4000 mailto:cenan.rfo@usace.army.mil