Abstract of Offers 70Z0G120BPRV09100 Dredge Boat Basin and Channel USCG STA Shinnecock Hampton Bays NY PSN 9829703.pdf

PDF 394 KB Posted

Attached to
DREDGE BOAT BASIN AND CHANNEL AT U. S. COAST GUARD STATION SHINNECOCK, HAMPTON BAYS, NEW YORK (SUFFOLK COUNTY) PSN 9829703
Solicitation number
70Z0G120BPRV09100
Issued by

About this file

This abstract of offers summarizes bids received in response to Solicitation Number 70Z0G120BPRV09100 issued by the U.S. Coast Guard for dredging services at Coast Guard Station Shinnecock in Hampton Bays, New York. Three contractors submitted bids for the project, which includes dredging approximately 5,445 cubic yards from the boat basin and 5,281 cubic yards from the channel, for a total estimated quantity of 10,726 cubic yards, utilizing mechanical dredging methods only. The bids ranged from a low of $2,150,000 submitted by Chesterfield Associates to a high of $3,691,071 submitted by Coastline Consulting. All contractors submitted the required 20% bid security and acknowledged any amendments to the solicitation. The government's estimate for the work fell between $2,150,000 and $2,917,030. The abstract indicates the U.S. Coast Guard will award a contract for these dredging services to one of the three contractors that submitted bids.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

70Z0G120BPRV091 00

2. DATE ISSUED

5/01/2020

DATE OPENED

6/02/2020

PAGE OF PAGES

1 2

4. ISSUING OFFICE

Coast Guard SILC, CEU PROV 475 Kilvert ST STE 100 Warwick, RI 02886

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

JEAN BRETZ, Contracting Officer

SIGNATURE

DATE SIGNED

6/02/2020

5. PROJECT TITLE

Dredge Boat Basin @ CG Station Shinnecock

Opt for Dredge Channel

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. HIRED LABOR

A. OFFEROR

Chesterfield Associates Westhampton Bch, NY

A. OFFEROR

Coastline Consulting Branford, CT

B. REASONABLE

CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

20%

6. NUMBER OF AMENDMENTS ISSUED

N/A

X

C. REASONABLE

CONTRACT

(Including profit)

C. AMENDMENTS ACKNOWLEDGED

7A.

ITEM

NO.

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

1. a) Dredge & Dispose 1 ls

$1,388,475 $1,252,350

b) Surveys 1 ls 15,500 8,000

c) All other fixed costs 1 ls 136,000 1,150,000

01 - LUMP SUM $1,150,000

$1,539,975 $2,410,350

2 a) Dredge & Dispose $1,346,655 $1,272,721

b) Surveys 30,400 8,000

02 – LUMP SUM $1,000,000 $1,377,055 $1,280,721

TOTAL LUMP SUM $2,150,000 $2,917,030 $3,691,071

ABSTRACT OF OFFERS – CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER

70Z0G120BPRV004 00

PAGE OF PAGES

2 2

INSTRUCTIONS – Attach this form to OF-1419, Abstract of Offers – Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF-1419. Use additional OF-1419’s for contract items in excess of 14 and attach additional Continuation Sheets (OF-1419A) as needed.

CG STATION SHINNECOCK

DREDGE BOAT BASIN

OPT FOR DREDGE CHANNEL

4. OFFERS (Continued)

NO. 3 NO. 4 NO. 5 NO. 6

A. OFFEROR

Terry Contracting Riverhead, NY

A. OFFEROR

3. CONTRACT ITEMS

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

1. a) Dredge & Dispose $707,850 $ $

b) Surveys 11,200

c) All other fixed costs 412,479

01 – LUMP SUM $1,131,529

a) Dredge & Dispose

$686,530

b) Surveys 16,800

02 –

LUMPSUM

$703,330

TOTAL LUMP SUM

$1,834,859