AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 12

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

07/22/2020

4. REQUISITION/PURCHASE REQ. NO.

2120G10PRV011

5. PROJECT NO. (If applicable)

PSN 6587455

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert ST STE 100 Warwick, RI 02886

Same as Block 6 Attn: Daniel B. Walker, Contracting Officer

(401) 736-1764

(401) 736-1704 (fax)

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE ACKNOWLEDGED

See Block 11 below

9A. AMENDMENT OF SOLICITATION NO.

70Z0G120BPRV01100

9B. DATED (SEE ITEM 11)

06/25/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such Change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation referenced in block #9A to REPAIR WATERFRONT AT USCG STATION PROVINCETOWN, MA (BARSTABLE COUNTY) is amended as follows:

1. See Permit File Number: NAE-2019-01320 applicable to this project attached.

2. Insert Permit File Number: NAE-2019-01320 applicable to this project as attachment 6 to Section J of the solicitation. All work shall be accomplished in accordance with contract terms and conditions, as well as the documents listed in Section J.

3. The due date for receipt of bids is extended to August 4, 2020, 02:00 PM LOCAL TIME, WARWICK, RI

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

DANIEL B. WALKER, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

07/22/2020

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53

Regulatory Division File Number: NAE-2019-01320

Michael Carosotto United States Coast Guard

DEPARTMENT OF THE ARMY

US ARMY CORPS OF ENGINEERS

NEW ENGLAND DISTRICT

696 VIRGINIA ROAD

CONCORD MA 01742-2751

November 19, 2019

125 Commercial Street Provincetown, Massachusetts 02657

Dear Mr. Carosotto:

We have reviewed your application to complete work below mean high water in order to repair nineteen (19) concrete piles. The proposed work will have 51 square feet of permanent impacts, and extend 650 feet beyond mean high water. The project will require the use of a 50-foot by 70-foot temporary work barge. This project is located in Provincetown Harbor at 125 Commercial Street, Provincetown, Massachusetts. The work is shown on the enclosed plans titled ''PROPOSED PILE REPAIRS 125 COMMERCIAL ST. PROVINCETOWN. MA'', on 5 sheets, and dated ''MAY 2019''.

Based on the information that you have provided, we verify that the activity is authorized under General Permit # 1 of the enclosed April 16, 2018 Federal permit knqwn as the Massachusetts General Permits (GPs).

Please review the enclosed GPs carefully, including the general conditions beginning on page 19, to be sure that you and whoever does the work understand its requirements. A copy of the GPs and this verification letter shall be available at the project site throughout the time the work is underway. Performing work within our jurisdiction that is not specifically authorized by this determination or failing to comply with any special condition provided above or all of the terms and conditions of the GPs may subject you to the enforcement provisions of our regulations. You must perform this work in compliance with the terms and conditions of the GPs and also in compliance with the following special conditions:

1. No grounding of any vessels or anchoring in eelgrass shall occur. A copy of the most recent eelgrass survey and waypoints depicting the eelgrass beds shall be provided to the contractor prior to work. The edge of the eelgrass beds at the project sites shall be identified and marked prior to commencing work to ensure the vessel operator is aware of the eelgrass location at all times. The vessel operator shall be provided maps and waypoints depicting the eelgrass beds prior to commencement of work.

2. The work vessel size shall not be larger than 50 feet by 70 feet in order to minimize shading impacts to eelgrass.

3. The lowermost part of the work vessel shall be at least 30 inches above the substrate at all times. If this clearance cannot be maintained during the full tidal range, the work vessel shall be moved to deeper water until the tide returns.

4. Pre- and post- construction eelgrass surveys shall be performed for all proposed work.

Each survey shall be submitted with an eelgrass survey report.

5. If work commences prior to July 2020, then the pre-construction eelgrass survey completed on August 14, 2019 may be used as the pre-construction eelgrass survey. If construction commences after July 2020, then a new pre-construction eelgrass survey shall be completed and submitted prior to the start of construction.

6. If it is determined that eelgrass has been impacted, then compensatory mitigation will be required in the form of In-Lieu Fee to the Massachusetts In-Lieu Fee (ILF) program. If the In-Lieu Fee payment is not received within 3 months of the Corps request for In-Lieu Fee payment, then the permittee will not be in compliance with the terms and conditions of this verification letter.

7. All reports, drawings, correspondence and any other submittals required by this permit shall be marked with the words "Permit No. NAE-2019-01320" and submitted via: a) MAIL: Katelyn Rainville - Regulatory Division, Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751 , b) EMAIL:

Katelyn.M.Rainville@usace.army.mil, or c) .FAX: (978) 318-83 03. Documents which are not marked and addressed in this manner may not reach their intended destination and do not comply with the requirements of this permit. Requirements for immediate notification to the Corps shall be done by telephone to (978) 318-8338.

8. You must complete and return the enclosed Work Start Notification Form to this office at least two weeks before the anticipated starting date.

, 9. You must complete and return the enclosed Compliance Certification Form to this office at least two weeks after work is complete.

This authorization presumes that the work as described above and as shown on your plans noted above is in waters of the U.S.

This authorization expires on April 5, 2023. You must commence or be under contract to commence the work authorized herein by April 5, 2023, and complete the work by April 5, 2024.

If not, you must contact this office to determine the need for further authorization before beginning or continuing the activity. We recommend that you contact us before this authorization expires to discuss reissuance. Please contact us immediately if you change the plans or construction methods for work within our jurisdiction. We must approve any changes before you undertake them. A

This authorization does not obviate the need to obtain other Federal, State, or local authorizations required by law.

Your project is located within, or may affect resources within the coastal zone. The Massachusetts Office of Coastal Zone Management (CZM) has already determined that no further Federal Consistency Review is required.

We continually strive to improve our customer service. In order for us to b_etter serve you, we would appreciate your completing our Customer Service Survey located at http:// corpsmapu. usace. army .mil/ cm apex/f?p==regulatory survey.

Please contact Katelyn Rainville of my staff at katelyn.m.rainville@usace.army.mil,

(978) 318-8677 or (978) 318-8338 if you have any questions.

Enclosures cc:

Sincerely, Barbara Newman Chief, Permits & Enforcement Branch Regulatory Division

Carlos Pena, Foth Infrastructure & Environment, LLC, Carlos.Pena@foth.com Ed Reiner, U.S. EPA, Region 1, Boston, Massachusetts, reiner.ed@epa.gov Chris Boelke, NMFS, Gloucester, MA; christopher.boelke@noaa.gov Robert Boeri, Coastal Zone Management, Boston, Massachusetts, robert.boeri@mass.gov Rachel Freed, DEP NERO, Wetland and Waterways, Wilmington, Massachusetts;

rachel. freed@state.ma. us Jessica Kenny, DEP NERO, Wetland and Waterways, Wilmington, Massachusetts;

j essica.kenny@state.ma. us Tim Famulare, Provincetown Conservation Commission, tfamulare@provincetown-ma.gov

I

I ' ' I I

= "· --- _.._._ - -------!:· - -- ----.•• -.... •-=c....,::t::r:::r:::;s,,S==v::=:r• --=:::•;;r---- - ~~ ·c·•,r:-;--w;;;:::;::, -......,_,7{ i♦ ,0-i♦:X n•-e;- - 1> y ·---- ·v ;~._,~...,,..~ . .._ ____ ,.__,_ ____ -------~-t ' II ,..

I _J :• :'. ... i •

• I ,,,. \ I '

. I I

J i . ,, j I- - ' ~\ ' ., . I

\ I • • • f

) .., ' . l:r

'-7 \\ I

"' ._, - ro --..... ·-- ,. -

_ N~ .:IJT1'VES-S0A'Mon-, ·

OMINEE ,TR . ·:.7~ • .,- . .

· ,;; ~ ·PlCKARD. Jk mt ~J ",,_-.... -~~ ft l..r™. ,JR'". .

N/F. (

COMMANDER~

1GOAST -GUARD

~ouP ··wooos ., ... . t7 HOLE :~ •. ·'• -. " ~-'~,. . t,' .

,J i- ' . ., -,'.f.~ t ' '

. ,1;1·,. . . ,:-- .. ..... ~ j~

. -- . ~siiEU:F,JSH•_ '_, - ~siJiTABltrn(~ AAcA •~-~ ,_ . -,. ••-.-..-• j · ,., • . •' ·• . . F • ~ ti,_

---- = - - ~ • .. Ji. J(b_' •COASTAi: B(AGH• ~ ... ....-\ ,~ t r · ----

-......'!.. . ~ ~u: . \....:.:.

~11 - ..---1Jl-'I ..,. ~:,_ ,- ~ ~ _<1;1;,.,, •~ ..-- H --:.-¾ ~.., .._...,,.,~~ _=': 't,. .::~~

, · • .# If ~ I JI

1 "'1;I• .

,I ' -~ I t- ' ~ t...-,;i · '.J,- _ , -ffr.lwJ. • II~-, \. ·__ -,4, ' - ' ~_,. -N/F . . ,. C I ·. • ,._.: I

~ f.i . r- ' ·.. . .... ~ .. l-'fNORE .. u11 · . . .

HHW= - . . - . '

r

.• ...,.. ... _·lt~~- ; ;?',~ I ~ f ~fV!: ~-~ P,\(JL. Eb·.Ab DA\1D' et.AKUtt

Hlt~ts~io~ . 1f ,, ;, .\ , , 0 "-.\111· •ln:

, ., .-;" Hl offli.L:, .

f

L._ , ~ I . . - _ ... ___ _ ._ -- ' .. ~x..... ~... - ' • ~ - --"7 . -~ I- • . . L ---~-

-" )i , ... ~ ( . \ .,.,·1 ' ~ ~ ,,~~~ -t

DAnJM

OFFSEIS

111.W ...

113 ± 412 1111'1

UJ ~ 1111

M1 1 0 ...

<a ±- --us ~ IU uo -u, ll1S'

OfstiS 1MDt fll0II

"4UIUGUC

IA~

LQ0,,-10Jll73

NOT!S:

1. THE 8A1HYM£7RIC DATA SHOVM ON THIS PLAN WAS GATHERED FROM NOAA BATH'Y1ETRIC DATA FROM 2013-201.f.

uses CAIGP UDAR: POST SAND (MA. NH. RI)

2. THE t,mDCAL REFERENCE PLANE FOR THIS PROJ£CT IS AILLW.

.l. COORDINATES ARE BASED ON NAO BJ STA TE P~ MASSACHIJSE.1 1S UNM.AND COORDINATE GRID.

4. ORTHO-IMAGERY AND SC-tt FD DATA IS APPROXJW. TE u,.JI FSS OTHERWISE NOTED ANO SHOULD BE USED AS A

GENERAL REF£RENCE OHL Y. •

5. THE INF'CRMATION DEPICIED ON THIS PLAN REPRESENTS THE RESULTS OF SURYEYS MADE ON THE DAJES SHO'IM, AND

CAN CIILY BE CONSIDERED AS INDICA11NG THE GENERAL CONDl110NS AT THAT 11M£ INTERPOLATED INF'ORMA110N FROM BETWEEN SOUNDING RUNS IS NOT GUARAN IEED. SHOALS. OBSTRUC110NS OR OTHER D/FF'ERJNG CONDITIONS MAY EXIST BETWEEN THESE RUNS. CONSULT WITH CLE ENGINEERlt<IG FOR MORE DETAILED INFORMA 110H.

6. POSS£SSJON AND USE OF THE MATERIAL CONTAINED ON THESE DRAWINGS IS GRANTED ONLY IN CONNEC710N l'rfTH /TS USE AS IT REU. TES TI) THE 711LED PROJECT, ANY OTHER USE. REPRODUCTION OR DISQ.OSURE OF THE INFORMA 110N CONTAJNED HEREON IS E:XPRESSL. Y PROHIBITED WITHOUT THE WRITTEN CONSENT OF FOTH-ct.£ £NGINEERING INC.

ijf ~~'r.c--i~

-o:;J .. 't:::::J' .. =.:, ... ,= e:::<-gj' t::' a= ,, '

.,_·~ - ~1 _ _ - . . .,,,,. • -,, • ' · -~ l ."' :r;; ,,J t'l.."' 'd • , . _ _. -· ,1~;, r' ~ '·• . . ti. , ,u;:~ <l-."<".!JT, ··.•· ~; :.. • _. _ . ~ _ ~ ,,- . .-- .. ,. __

:r~~·~~ ~~~';. ~ -1,= _$ _!12 ~;l~iit ~-- :_ ~~~~·~:tfl\t'oriii~~~

GRAPHIC SCALE

~o

(IN FEEf)

1 INCH =12CFEET

PBOP«iiO PUZ BIPJIRS 126 ccntaiKMAL sr. PROVL,CZJOIH. IU

~ omm, ATA'.m com lfflARD ~ c:o»tiifn!Wo sr, PJWYlnCZlOIN, IU

RDA SflE PLAN Foth

SHEET 1 OF 1

;:;:z::::i.=====:::.;:;;:::;:;::=:,:;:::===:..:=:::::::::-.:::::=i::=::!::::::::;::::::=:::=::::=::::::::-:::::::::::::::::::,,:::;:::::::::::::::::::-:-:-:::;:::::==:::::::::::-::::--::-:-::::c--::-:::::~e:=--=--=-..,,..,.-...,.,.,,..,:-::,-..,,::'."'":"--,:e-,;..,,,,,.,.,._..., _ _ .,..,._ .... ,...., ...... ____________ ..,. ______________________________________________________ _ ________ , .. , - --. ' . . . - - .. - - . - , . . . . -· - ·- - -.._ ~;:;r:, I - • • jf -:

-~Vr-.

. ;:v.~ ..... _,, "' t 1· .;1· ~~- . . -~ . .. .. r, , • . 4-! • . ( .. ~ - . . ... . .. ... ..... .. .. ·'-\;: ·t ~ --. .

~ ~ =t;: . . t -! ~ .. . -~ ·;r.:. '1. t.. .... , .. ---. ,,,,..;, .• l j, , .., :,,:1~ f:.;

TIDAL_ DATUMS: (1983- 2001 TIDAL EPOCH)•

HIGHEST OBSERVED 'I/ATER LEVEL (HOWL) 15.1 o·

MEAN HIGHER HIGH WATER (MHHW) 10.28'

MEAN HIGHER WATER (MHW)

NORTH AMERICAN VERTICAL DATUM (NAVO)

MEAN TIDE LEVEL (MTL)

MEAN LOW WATER (MLW)

MEAN LOWER LOV/ WATER (MLLW)

LOWEST OBSERVED YIATER LEVEL (LOWL)

REFERENCE:

9.84'

5.51'

5.09'

0.35' o.oo· -3. 72'

NOAA/NOS TIDE STATION ID# 8443970. BOSTON, MA

LEGEND:

!;b:.Zl PROPOSED PROJECT LOCATION

PHOTOGRAPH REFERENCE:

1 . GOOGLE EARTH

GRAPHIC SCALE

NOTTO SCALE

DATE

MAY

Appledore Marine Engineering, LLC

USCG TASK ORDER No.: 70Z0G119FPRV02000 USCG CONTRACT No.: HSCGG1-16-D-PRV005

U.S. Department of Homeland Security United States Coast Guard

CIVIL ENGINEERING UNIT PROVIDENCE

STATION PROVINCETOWN PROVINCETOWN, MA FIG. NO.

AERIAL PHOTOGRAPH · 3

w •

:z , _J

:c • • u ::lE

LEGEND:

G e

!Cl

- ~..:.:.~ .. ,.,5:y ... 131-- •.=; -C< :, C'"i ·s.r?.iL-:e, ..... "'rfmiFSS -~

A ( 10) T<f w

Cl 101 IQ( !01 lul -1~1 1°1 R z _J

Cl !QI 0 0 0 0 :c

--1 f:::?

A ~

APPROXIMATE MLLW

\ / C,;'\ ~1 ( 1 A. 'i ( 15 ) ( 16 ) { 17 \t

I I

-I-..

!T ~ . w

:z: a - ::J -

:c u u-- I u w z -_J

:c u ....J

PILE BENT DESIGNATION

PILE ROW DESIGNATION

EXISTING 20" SQUARE CONCRETE BATTER PILE

EXISTING 20" SQUARE CONCRETE PILE

PROPOSED PILE JACKET INSTALLATION LOCATION

I I I

- Iii Iii

= '" 0

~ y 0 0

0 0 y ~ y 0 0 a - E a □

GRAPHIC SCALE

0 25' 50' -~

I y C - ~ i:: -

-y \2f _ 0 □ - 0 0

DATE

MAY

I y y

- 0 ...

0 0

Cl _g al I I . .

o:

I I I

01 IOI

01 I I y r ~ -

0 0 :

0 ~ .. 0 ..

Appledore Marine ~~ Engineering, LLC

I

0 -y 0 -

1-© I I I

I-® -0

0 a

0 a u I u w

I~ I u

U.S. Department of Homeland Security United States Coast Guard w z _J

:c u

CIVIL ENGINEERING UNIT PROVIDENCE

I 2019 I I STATION PROVINCETOWN . PROVINCETOWN, MA

GENERAL PURPOSE PIER

PROPOSED JACKET INSTALLATION PLAN

FIG. NO.

USCG TASK ORDER No.: 70Z0G119FPRV02000 USCG CONTRACT No.: HSCGG1-16-D-PRV005

DECK EL +17. 18'±

BOTTOM OF PILE CAP EL + 13.0' ±

MHH\\' EL I 0.28' v

MLLW EL 0.00' v --

EXISTING 20" SQUARE

CONCRETE PILE (TYP)

GRAPHIC SCALE

4• s· ----

EXISTING GENERAL

PURPOSE PIER

• 0 .. I 0 -f2

• 0

I ..

CN

::e ff] -

I

Appledore Marine Engineering, LLC

EXISTING CONCRETE

PILE CAP

PROPOSED 28" SQUARE

PILE JACKET {lYP)

2'-0"

BELOW SEABED

U.S. Department of Homeland Security United States Coast Guard

CIVIL ENGINEERING UNIT PROVIDENCE

DATE

MAY

.,_ ___ .._ ________ __. STATION PROVINCETOWN PROVINCETOWN, MA FIG. NO.

GENERAL PURPOSE PIER USCG TASK ORDER No.: 70Z0G119FPRV02000 USCG CONTRACT No.: HSCGG1-16-O-PRV005 PROPOSED JACKET INSTALLATION SECTION S

4 J .1

4 ., .d

.1

J 4 (1

.d 4 ., 4 4 <l 4 ., BOTTOM OF PILE CAP EL + 13.0' ±

MHH\V El 10.28' 7

EXISTll~G CONCRETE PILE ~

PROPOSED PILE JACKET

2'-0±

EMBEDMENT

d

.:l

4 ., 4 4 ., J ., J

/ EXISTING CONCRETE PILE CAP

• 0

-I 0 -

• 0

I ..

N

:I:

'A ~ ff] -;

---- - 1 -

EXISTING

REINFORCING STEEL

EXISTING

CONCRETE PILE

PROPOSED PILE JACKET

PROPOSED GROUT FlLL --

2'-4"

1 ' - 8" 4"

PILE JACKET REPAIR SECTION A-A

I" = 1 -0"

· REPAIR JACKET DETAIL .

1 /4 = 1'-0 '

GRAPHIC SCALE

AS SHOWN

Appledore Marine Engineering, LLC

U.S. Department of Homeland Security United States Coast Guard

CIVIL ENGINEERING UNIT PROVIDENCE

DATE

MAY

2019 _______ .._ __________ _. STATION PROVINCETOWN PROVINCETOWN, MA FIG. NO.

GENERAL PURPOSE PIER USCG TASK ORDER No.: 70Z0G119FPRV02000 USCG CONTRACT No.: HSCGG1-16-D-PRV005 PROPOSED JACKET INSTALLATION DETAILS 6

I f I • !

t l

• ,r·, t-11 '. •. ·!a .. - ·.-4.-, ~S! !J ~·.

• \;,·. __ .,;. ·- ' 'I

~ l- --~-

' ' ' ' I I

"' ' .JI

.II • :ii .JI ~

.JI ,JI

OBSERVED m GRASS

SHOWN IN GREEN -~

8/1·4/19· (m> :)

:ii .al .al

JI .al .JI .al .JI

EEL ,GRASS TRACK LINE

8/14/19 (JYP.)

.JI .al

.,, ·:JI

.!I I .JI

.II

.JI ~ .JI .JI JI .JI .al

___ N/F < '- TAVES BOAlYARO- , _ ~

NOMINEE TR Al ~d, t ~~ .

..,, .JII JI

~ .. /,. "· .: . . C :,:' - ~ - . • -A::_;;_:'. • _/ • • I •

.II

- J " .. • - .II

.JI JI ~ .JI

JI

.JI .al.~

.al .JI

.JI -

.JI .al .al :JI .JI ~ ~ .ll

.JI .JI .JI

:JI " JI ---- - --

:JI ,,, ~

~ .JI .JI ~

JI .JI .JI .JI .JI .JI ~

J. PICKARD -~

•.•,r7'~ "!'J ~- ... ..,.-

.II JI

.JI

~ .al :JI

' . h i

7 J, . . . . . . " . -~ ..

. .. .. -· "f-.T. -. i· 1 · --r. ~ ' -. ! - G' , '.< ' . ~ c) • ~ ·' . ' . ; " I- • . .

·} I.I : '¥ t-1·· --

.JI

.'• 'R t • ,r~ ~ C J • ., :ii .JI

• II .. .JI

.JI .JI .JI .JI .,, .JI .JI

JI .JI .,,

~ - ~~ ~ LIMIT ,OF EEL G~

SURVEY ,8/1A-/19 (TYP.)

l N/F (

CQMMANDER,

COAST GUARD

GROUP wooos· '--- . , HOLE

\ -~-==:_ ·~ N/F RAFANfili :Sm'AN gf ~AL MARK .E

WALSH

~-:,' - ~ -·· ,.N/F

MINORE MICHAEL

PAUL, EL AL DAVID

81.AKli O'CONNB.L t;~-~ . ~" i:"° .• .... t~l, •, '-•, •_.! ':J :J ''Ill ·-·.. . "" ·_ .... - ~ .. . """ ' ( }o ~ -

_ HHW=1Q.28'

~ i:;__

__ ;~ r. -i, HTL ~15.10. ·'-

~ \ \ \ i

-:!--,,, ,. ,I ;=.;t,,,H·.c.--::_ ~ "''·' ~- \

:ii -~- :ii ..

1i -__:_--~

.JI

.JI

.JI .ll :ii .JI

' .JI .JI .JI

.JI\ .JI

.JI .JI .JI .JI -------=--

.JI I .JI

:JI I J/

.JI

I .JI :JI ..

I fm>AIRS

I , .JI

.JI

.JI

~ .JI

.JI .JI .JI

:JI :ii .JI

.JI .JI .JI

.al

.ii

.al

\ , ~ J.IL1W=6.00' , .. -

I I , ' I

:JI

.JI

.JI

I -

.lj .,, Jf1

JI .,,

.JI ~

.JI :JI

~ - .JI , • .JI ~

- .JI

~ .:ii

.JI ,,, .

:JI

.JI .JI .JI .JI .JI .JI :JI .al :ii .JI .:ii .al

DAlUM \ , " \ , .,_,,,_ .. -;.'". ·..1,.., 0 -_ . , 1,'"_::::#,--c_- J, •. -- ;.L:;;:f-"' , .. 1 i.:,-y.e1.1,1._oli,-.,--_.&·, -,:.),:· ... t ,. E'" ~:f:t: i"triLC ""':- ;. 1111 "'-~j,1 1

I

UFFSEIS

m. Mal

1IUI ... .. ..., "· -

U1 0 -... -U5 ...

Ul t -6.14 IU I.ID -6.41 m.

QIS:.S IMBI JIIII

aDUauE l

NOTES:

1. THE EEL GRASS SUR'r£Y WAS CONDUCTED ON 8-14-2019 BY FOTH INFRASTRUC1UR£ & ENVIRONMENT.UC. (FOTH-ct£)

2. THE BA THYJ£TRIC DA TA SHO~ ON THIS Pt.AN WAS GA THE.Rfu FROM NOAA BA TH'NE:TRIC DA TA FROM 2013--2014

USGS Cl,IGP UDAR: POST SAND (MA. NH. RI)

3.. THE ',£RTICAL. REFERENCE PLANE: FOR THIS PRO.ECT IS MLLW.

4. COORDINA 1E5 ARE BASED ON NAO 83 STA TE PUNE MASSAatlJSE.115 MAINLAND COORDINATE GRID.

5. ORTHO-IMA<mY AND SCALED DATA IS APPROXIMATE UNLESS OTHERVtfSE. NOTED AND SHOULD BE USED AS A

GENERAL R&E.RE.NCE OHL Y.

6. THE INFORJIA110N DEPICTED ON THIS Pt.AN REPRESENTS THE RESULTS OF SUR\£"1'5 MADE ON THE DA'JES SHO~. AND

CAN ONLY E£ CONSIDERED AS IND/CA 11NG THE GENERAL CONDl110NS AT THAT 1111£ INTERPOi.A TED INFORMATION FROM BETWEEN SOONDING RUNS IS NOT GtJARAN IEEO. SHOALS. OBSTRUC110NS OR OTHER lJtfFERrNG COHDl110NS MAY EXIST BETWEEN THESE: RUNS. CONSULT WITH ct£ ENGINEERING FOR MORE: DETAILED INFORMATION •

7. POSSE.:SStON AND USE OF THE IIA1ERIAL CONTAINED ON THESE DRAWINGS IS GRANTED ONLY IN CONNECTION WITH ITS USE AS IT REI.A TES 70 THE 117LED PROECT. ANY OTHER USE. REPRODUC110N OR DISQ..OSURE OF THE INFORWA 110N CONTAINED HEREON IS EXPRESSLY PROHIBITED WITHOUT THE WRITTEN CONSENT OF (FOTH-ct£).

GRAPHIC SCALE

0 60 120 240

(IN FEEl)

1 INCH =120:EET

PIOP0811) PD.z DPAIRB um aw-c+:wa sr. nn1M.110111. KA - 01110; RTAD8 0048T aDAlm um aw-cacu, Br. PBOilNCIIOIW. llA

EEL GRASS

SITE PLAN Foth

SHEET 1 OF 1

US Army Corps of Engineers® New England District

WORK-START NOTIFICATION FORM

(Minimum Notice: Two weeks before work begins)

EMAIL TO: cenae-r@usace.army.mil; or

MAIL TO: Katelyn Rainville U.S. Army Corps of Engineers, New England District Permits and Enforcement Branch Regulatory Division 696 Virginia Road Concord, Massachusetts 01742-2751

Corps of Engineers Permit No. NAE-2019-01320 was issued to the United States Coast Guard (c/o Michael Carosotto). This work is located in Provincetown Harbor and authorized the repair of nineteen (19) concrete piles. The proposed work will have 51 square feet of permanent impacts, and extend 650 feet beyond mean high water. The project will require the use of a 50-foot by 70-f oot temporary work barge.

The people (e.g., contractor) listed below will do the work, and they understand the permit's conditions and limitations.

PLEASE PRINT OR TYPE

Name of Person/Firm: - -------------------- ------ Business Address:

Telephone Numbers:

Proposed Work Dates: Start: --------- Finish: ---- ---- -

Permittee/ Agent Signature: ____________ _ Date: ---------

Printed Name: Title: ------------------ ---------

Date Permit Issued: November 19, 2019 Date Permit Expires: April 5, 2023

· FOR USE BY THE CORPS OF ENGINEERS

PM: Katelyn Rainville Submittals Required: Yes

Inspection Recommendation: _______________________ _

US Army Corps of Engineers ® New England District

COMPLIANCE CERTIFICATION FORM

(Minimum Notice: Permittee must sign and return notification within one month of the completion of work.)

Permit Number: NAE-2019-01320 ----------------------------- Project Manager: _K_a_te_ly_n_R_a_in_v_il_le _____________________ _

Name of Permittee: United States Coast Guard (c/o Michael Carosotto)

Permit Issuance Date: November 19 2019 ---------------------------

Please sign this certification and return it to our office upon completion of the activity and any mitigation required by the permit. You must submit this after the mitigation is complete, but not the mitigation monitoring, which requires separate submittals.

* E-MAIL TO: cenae-r@usace.army.mil; or

* MAIL TO:

Permits and Enforcement Branch A U.S. Army Corps of Engineers, New England District Regulatory Division 696 Virginia Road · Concord, Massachusetts O 17 42-27 51

Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation.

I hereby certify that the work authorized by the above referenced permit was completed in accordance with the terms and conditions of the above referenced permit, and any required mitigation was completed in accordance with the permit conditions.

Signature of Permittee Date

Printed Name Date of Work Completion

Telephone Number Telephone Number

2020-07-22T15:51:50-0400
WALKER.DANIEL.B.1033312390