March 15, 2018

Reference: PSN 2763063 Repair Eatons Neck Housing

ADDENDUM NO. 1

TO: All Bidders

NOTICE: The information contained herein supplements and/or supersedes specific parts of the contract documents referred to in each item, and shall be attached to and become a part thereof. All other provisions shall remain in full force and effect as set forth in the original documents. Additional work called for herein shall comply with the requirements originally specified for similar work, unless otherwise described in the specific item.

1. The following Drawings are issued as part of this amendment:

a. Sheet A-801 - Finish Schedule

2. It should be understood that where the term “PROVIDE” is used, the term means that the contractor is to furnish and install the item in question.

3. The following Drawing Clarifications are issued as part of this amendment:

a. DRAWING A-001:

i. Add the following abbreviation to the list of abbreviations: A.O.D. = All Other Doors

b. DRAWING A-101:

i. Plan Drawing - 2 Attic Plan, change the Section callout on the East side of the building from Detail 5 on Sheet A-500 SIM. To Detail 5 on Sheet

A-501 SIM.

c. DRAWING A-301:

i. Detail Drawing 2 – TYP. STAIR SECTION and callout 2B delete the reference to the “2” square

- 2 -aluminum railing post” and Replace note with a “¾” square aluminum post”.

ii. Add the following note: “Contractor to add intermediate post, evenly spaced as required, to limit unsupported railing runs to no more than 42” in length. All Handrails shall be constructed and installed to insure that the railing will resist an imposed concentrated horizontal load of 200 pounds in accordance with Section 4.5.1.1 of

ASCE 7.

d. DRAWING A-603:

i. Typical Gable end elevations, Drawing 3 and Drawing 4, behind the rake board – Trim callout TR4 – contractor shall provide a solid wood blocking nailer that the rigid insulation shall abut to the underside of. This solid wood blocking nailer shall be the same thickness as the rigid insulation provided to the building envelope to provide a flush and secure nailing surface for the building trim. The wood blocking should be installed tight to the underside of the roof sheathing. (BASE).

e. DRAWING A-801:

i. Remove Drawing Sheet A-801 FINISH SCHEDULE with a final submission date of 11/30/17 from the set of drawings and Replace with Drawing Sheet A-801 FINISH SCHEDULE with a revision date of 3/15/18.

f. DRAWING W-101:

i. Add Keyed Note No. 1 to the South side of Building 9737, Unit #1, pointing to the (2) circles located with the rectangle graphically depicting the two (2) propane tanks set atop the concrete foundation which is to be located in the rear of the building. It should be understood that this is a concrete pad with propane tanks, as indicated at the remaining ten (10) units, and all defined conditions outlined in Keyed Note #1 will apply to this location. (BASE).

- 3 -

4. The following Specification Clarifications are issued as part of this amendment:

a. SECTION 08 53 10 PLASTIC WINDOWS

i. PART 1 General, and elsewhere in project specification, where the “simulated divided lites” is used it shall be understood that this will be comprised of grilles on the exterior of the windows as well as the interior with appropriate spacer bars between the glass at the grill locations.

ii. PART 1 General, and elsewhere in this specification, the Simulated Check Rail is a surface applied rail with a spacer located between the glass. The check rail is a 2 11/32” wide element to create the appearance of a double hung window and should be located on the exterior of the windows as well as the interior.

iii. PART 2 Products, Sub Section 2.2.3 Finish Sub Section 2.2.3.2 Interior. All interior finish wood surface areas to be factory primed and ready for paint.

5. The following Information is provided, as part of this amendment:

a. LIMITED PRE-RENOVATION HAZARDOUS BUILDING MATERIALS

SURVEY REPORT, DATED 21 SEPTEMBER 2016, PREPARED BY

LANGAN, PAGES 1-52. See attached report.

END OF AMENDMENT-1 REVISED