This is Amendment No. 0003 to Solicitation 70Z08826B0030252 issued by the U.S. Coast Guard, CEU Oakland on July 29, 2026, for FY26 Repair & Replace ATON (Aids to Navigation) at Base Tongue Point/Columbia River in Astoria, Oregon.

The amendment modifies Paragraph 1.16 of the Specifications to shift material sourcing responsibility from Government Furnished Material (GFM) to Contractor Furnished Material (CFM). The contractor is now responsible for procuring, handling, storage, transportation, and delivery of ATON Platforms & Headers (Reduced Headers, 5'x5' baskets, and 7'x7' baskets/platforms in aluminum or steel); Ladders and Ladder Extensions (7' steel ladder sections, extensions, and brackets with all connecting hardware); and Lantern Stands. The Government will continue furnishing only Dayboards and ATON Lights/Lanterns as GFM. The contractor must assume responsibility for material quantities previously identified as GFM, with an updated list attached as Amendment 03A. The contractor remains responsible for ensuring exact quantities procured meet requirements for full execution of the construction schedule. The amendment also provides answers to RFI Questions 2-13, clarifying that 7x7 baskets are platforms for single and 3-pile structures (not 4-pile), correcting errors in the original GFM list, and directing contractors to specific drawings for technical details such as Range Frame Extension Brackets (Drawings 12.1-12.4) and light mounting on 4-pile towers (Drawing 9.1). Amendment 03B provides a list of 9 CFM drawings. All other terms and conditions remain unchanged.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 29July2026 51290PR260030252 10597026

6. ISSUED BY CODE 70Z088 7. ADMINISTERED BY (If other than Item 6)

CODE 70Z088

Commanding Officer

CG CEU OAKLAND (CN)

1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203

Commanding Officer

CG CEU OAKLAND (CN)

1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.

ISC BioExpress

X 70Z08826B0030252

9B. DATED (SEE ITEM 11)

Kaysville, UT. 84037

June 25, 2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY26 REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

The purpose of this IFB Amendment No. 03 is to:

1) Provide a modification/revision to the language in Specifications SECTION 01 10 00 0 GENERAL PARAGRAPHS, Paragraph 1.16 on the following page.

2) Provide answers to RFI/Questions 2-13 on the following pages.

3) Provide two (2) separate attachments to support RFIs:

A. Amendment 03A-An updated GFM List.

B. Amendment 03B-A List of 9 CFM Drawings.

*** Be Sure to download all three (3) Amendment 03 documents.

- All other Terms & Conditions remain unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Guiljohn Alcantara

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY ___________________________________________

(Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11-2016)

PREVIOUS EDITION UNUSABLE COMPUTER GENERATED Prescribed by FAR (48 CFR) 53.243

RFP 70Z08826R0000123

FY26 REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG),

BASE TONGUE POINT/COLUMBIA RIVER;ASTORIA, OR

RFI QUESTIONS 2-13

The following is a modification/revision to the language in the original Specifications, SECTION 01 10 00 0 GENERAL PARAGRAPHS, Paragraph 1.16. It should now read as follows & the original language in the original Paragraph 1.16 is to be replaced in its entirety:

REVISION OF PARAGRAPH 1.16:

Paragraph 1.16, "Government Furnished Material (GFM)," is hereby modified to reflect a shift in material sourcing.

“1.16 CONTRACTOR FURNISHED MATERIAL (CFM) FOR SPECIFIED ITEMS:

The Government will no longer provide the specific structural and mounting materials previously identified as Government Furnished Material (GFM). The Contractor shall be responsible for the procurement, handling, storage, transportation, and delivery of the following materials required for the construction, replacement, and repair of the ATON structures, as well as all necessary connecting hardware:

A. ATON Platforms & Headers: The Contractor shall provide all Reduced Headers, 5'x5' baskets, and 7'x7' baskets/platforms (aluminum or steel as required).

B. Ladders and Ladder Extensions: The Contractor shall provide all 7' steel ladder sections, associated Ladder Extensions, and Ladder Extension Brackets (LEBs). The Contractor shall provide all hardware for connecting the ladder assembly and brackets.

C. Lantern Stands: The Contractor shall provide all Lantern Stands required for the structures.

The Government will continue to furnish Dayboards and ATON Lights/Lanterns as GFM

2. MATERIAL QUANTITIES (CFM):

For bidding and procurement purposes, the contractor shall assume responsibility for the following material quantities originally slated as GFM. (Updated list attached)

(Note: The Contractor remains responsible for ensuring the exact quantities procured to meet the requirements for full execution of the construction schedule as outlined in the delivery order).”

QUESTIONS 2-5, REFERENCES:

Appendix B – Specifications (Summary Sheet PDF 71-73) Appendix G – GFM List:

Question 2:

Appendix G states that Lantern Stands, Lanterns, 5x5 Baskets and 7x7 Baskets are GFM for all locations, yet these are not listed as GFM’s on the Summary Sheet provided in the Specifications (Spec PDF 71- 73). Please clarify.

Answer 2:

See response above. All former GFM will now be contractor furnished. Bid accordingly.

Question 3:

Appendix G states GFM’s for a 7x7 basket and 5x5 basket. This nomenclature is not used on the drawing package. Please confirm the “baskets” refer to the Aluminum Platforms shown on the single and 3-pile structures. Also note that the 7x7 basket quantity are not shown on the summary of GFM’s on the right side of the Appendix G.

Answer 3:

Correct. “Baskets” are the platforms for single and 3 pile structures.

Question 4:

Appendix G shows 7x7 baskets at all 4-pile locations. Please clarify.

Answer 4:

There is an error, 4 pile aids do not require the 7x7 baskets. See updated GRM List attached as Amendment 03A.

Question 5:

Please clarify whether the following materials are GFM or Contractor Furnished: 4-pile Platform (including handrail), 7x7 Towers, and Range Board Frames.

Answer 5:

All formerly government furnish materials (GFM) will now be contractor furnished per issued modification above. Bid accordingly. See previous line items for more information.

Question 6:

Reference: 09 97 18 – Pile Corrosion Coating How much of each piling needs to be coated, entire length, above mudline, above MLLW?

Answer 6:

Piles shall be coated from 5 FT above mudline and above.

RFIs 7-13 Reference: Appendix B – Specifications (Summary Sheet PDF 71-73), Appendix G

Question 7:

The total quantities listed for the GFM in some instances will not be sufficient for the required installations. Reduced header – 20 furnished, 24 required with options. Ladder extensions – 42 furnished, 47 required with options. LEB 5x5-3 – 12 furnished, base requires 46, options another 38. U- Bolts – 74 furnished, 94 required with options. Please confirm the Contractor is required to furnish the additional material required.

Answer 7:

See previous response above. All Government Furnished Material (GFM) will not be contractor furnished. Bid accordingly.

Question 8:

Material quantities required for Cathlamet Bay North DBN 4, Elochoman DBN 1 & 2 and Multnomah Channel Daybeacon 3 are not listed in the chart? Are we to supply all material for these locations if needed?

Answer 8:

See previous response above. All Government Furnished Material (GFM) will not be contractor furnished. Bid accordingly.

Question 9:

What is the Range Frame Extension Bracket? Not shown in the drawings.

Answer 9:

See Drawings 12.1 – 12.4

Question 10:

How is the light mounted on the 4-pile towers?

Answer 10:

The light shall be mounted using a standard lantern stand shown in drawing 9.1

Question 11:

Is the Contractor to furnish the required Lamp Extensions?

Answer 11:

See previous response above. All Government Furnished Material (GFM) will not be contractor furnished. Bid accordingly.

Question 12:

Will the GFM reduced header include the Dayboard Arms?

Answer 12:

See previous response above. All Government Furnished Material (GFM) will not be contractor furnished. Bid accordingly.

Question 13:

For the existing ATON’s listed in Options 3 and 4 that are to be cut off at the mudline, please provide the material type, wood or steel, that is to be cut off.

Answer 13:

See Appendix A for existing structure type (SPW/MPW = wood; SPS/MPS = steel)

-END-