PQQ061_Amendment_0001.pdf
PDF 40 KB Posted
- Solicitation number
- 70Z08818BPQQ06100
About this file
Amendment 0001
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 2/02/2018 21-18-888PQQ061 6140972
6. ISSUED BY CODE 51290 7. ADMINISTERED BY (If other than Item 6) CODE
Commanding Officer
CG CEU OAKLAND (CN)
1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Commanding Officer
CG CEU OAKLAND (CN)
1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.
X 70Z08818BPQQ06100
9B. DATED (SEE ITEM 11)
To All Prospective Offerors
January 31, 2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GRAYS HARBOR CHANNEL ATON REALIGNMENT FOR GRAYS HARBOR, WASHINGTON
The purpose of this amendment is to make a change to the Specification and provide additional environmental requirements:
Continue to Page 2
Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JEFFREY A. CROSS
Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY ___________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE COMPUTER GENERATED Prescribed by GSA
70Z08818BPQQ06100
Amendment 0001
A. Change to Specification:
1. Section 01 10 00 – General Paragraphs, Part 1 General, 1.02 Contract Schedule, B shall state
“Remaining structures must be constructed within in-water work window limitations. The in-water work window for the remaining structures is July 16, 2018 – February 15, 2019.
B. Environmental Requirements:
1. When the vibratory hammer is used, for either removal or placement of piles, it would “ramp up” at lower power for 15 seconds, pause for one minute, repeat that sequence, and then start up continuous driving, in order to give wildlife time to clear the area.
2. USCG and contractor personnel shall not harass marine mammals.
3. Project activities would involve no dredging or sediment transport.
4. Prior to demolition work, ATONs with nests would be checked to see if the nests are occupied. If the ATON has active nests, work would be delayed until the nests are inactive and the fledglings have departed.
5. Piling removal and placement would be conducted using standard Best Management Practices to reduce sediment disturbance and turbidity, such as working in low water/low current where possible, removing the pile slowly, breaking the friction bond with surrounding sediment before removing, using a containment basin on the barge to control spills back into the water, and disposing of contained sediments at an appropriate upland disposal site. Standard BMPs would be in place in order to limit the risk of debris or contaminants entering the water.
6. It is nesting season for the endangered birds on the beach. If the contractor will take equipment across the beach, the contractor shall hire a biologist to monitor the situation.
END