Attatchment 2- Blank SOSS.xls

XLS spreadsheet 44 KB Posted

Attached to
USCGC HICKORY (WLB-212) DS FY24
Solicitation number
70Z085QIBCT0015
Issued by

About this file

This document is a solicitation (RFQ) for the dockside repair of the U.S. Coast Guard Cutter (CGC) HICKORY (WLB 212) in fiscal year 2024. The requirement is for a contractor to provide all necessary facilities, materials, equipment, and personnel to perform the repairs. The solicitation is a 100% small business set-aside, and the award will be made on a best value basis, with technical and past performance factors more important than price. Key details include: proposals are due by 8 AM PST on May 24, 2024, with the anticipated award date on or about June 24, 2024. Offerors must provide a 60-day warranty on all repair work and comply with various technical requirements such as providing subcontractor lists, welder qualifications, and property control plans. Offerors must also submit two relevant past performance examples from the last three years. Questions on the solicitation must be submitted by 8 AM PST on May 10, 2024, and requests for drawings must be made by 8 AM PST on May 3, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC HICKORY (WLB-225B) DOCKSIDE AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention RequirementsJOB$0.00
D-002Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB$0.00
D-003Compartment Insulation, General, RenewJOB$0.00
D-004Space or Component, PreserveJOB$0.00
O-00AComposite Labor RateHour5000
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(7/19/2023) Draft-00 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .