Attatchment 2- Blank SOSS.xls
XLS spreadsheet 44 KB Posted
- Attached to
- USCGC HICKORY (WLB-212) DS FY24
- Solicitation number
- 70Z085QIBCT0015
About this file
This document is a solicitation (RFQ) for the dockside repair of the U.S. Coast Guard Cutter (CGC) HICKORY (WLB 212) in fiscal year 2024. The requirement is for a contractor to provide all necessary facilities, materials, equipment, and personnel to perform the repairs. The solicitation is a 100% small business set-aside, and the award will be made on a best value basis, with technical and past performance factors more important than price. Key details include: proposals are due by 8 AM PST on May 24, 2024, with the anticipated award date on or about June 24, 2024. Offerors must provide a 60-day warranty on all repair work and comply with various technical requirements such as providing subcontractor lists, welder qualifications, and property control plans. Offerors must also submit two relevant past performance examples from the last three years. Questions on the solicitation must be submitted by 8 AM PST on May 10, 2024, and requests for drawings must be made by 8 AM PST on May 3, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clarifications for Solicitation 70Z085QIBCT0015.docx | DOCX document | |
| Attachment 4 - Request for Clarification Form.docx | DOCX document | |
| Attachment 3 - Past Performance Information Form MARIA BRAY.docx | DOCX document | |
| Attatchment 1- Work Specs.pdf | ||
| 70Z08524QIBCT0015.pdf | ||
| Attatchment 5- Ombudsman Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HICKORY (WLB-225B) DOCKSIDE AVAILABILITY FY2024 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | JOB | $0.00 | ||
| D-002 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | $0.00 | ||
| D-003 | Compartment Insulation, General, Renew | JOB | $0.00 | ||
| D-004 | Space or Component, Preserve | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 500 | 0 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(7/19/2023) Draft-00 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |