70Z08526QLREP0011 Attachment 1 Price Schedule.xls
XLS spreadsheet 31 KB Posted
- Attached to
- Dockside (DS): USCGC MIDGETT FY26 Repair
- Solicitation number
- 70Z08526QLREP0011
About this file
This is a Price Schedule (Attachment 1) for a Request for Quote (RFQ) solicitation for dockside repairs of the USCGC MIDGETT (WMSL-757), a U.S. Coast Guard cutter homeported in Honolulu, Hawaii. The price schedule establishes 25 definite work items (D-01 through D-25) covering maintenance and repair work including fire prevention systems, crane maintenance, tank cleaning and inspection, deck repairs, piping replacement, structural renewal, and system testing. Additionally, the schedule requires offerors to provide pricing for composite labor (O-00A) at an estimated 1,934 hours with a blank unit price field, an all-inclusive markup/loading rate for materials and subcontractors (O-00B) to be applied to a $100,000 base, and 5 laydays (O-00Z) at $0.00. The solicitation is issued by the Department of Homeland Security U.S. Coast Guard under solicitation number 70Z08526QLREP0011 for Fiscal Year 2026, Quarter 4 work.
Offerors must provide detailed pricing for each line item and establish their composite labor rate and material/subcontractor markup percentages on the price schedule. All quotes submitted must remain valid and firm for 120 calendar days from the solicitation close date. The requirement includes furnishing all necessary labor, materials, services, equipment, supplies, power, and facilities to perform the dockside repairs in accordance with the attached Performance Work Statement and all specifications. Seven additional attachments support this solicitation, including a Performance Work Statement, consolidated references, past performance questionnaire, questions and answers, government property report, and a Department of Homeland Security Non-Disclosure Agreement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC MIDGETT (WMSL-757) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-01 | Fire Prevention, Provide | JOB | $0.00 | ||
| D-02 | Folding Boom Cranes, Biennial Maintenance, Perform | JOB | |||
| D-03 | Talon Grid (Type 18-08), Inspect and Test | JOB | |||
| D-04 | RQAWTS 21 D (05-54-2), Remove and Reinstall | JOB | |||
| D-05 | Tenting, Provide | JOB | |||
| D-06 | Fall Arrest D-Rings, Remove and Reinstall | JOB | $0.00 | ||
| D-07 | Superstructure (Top of Stack), Renew | JOB | $0.00 | ||
| D-08 | Top of Stack (Exterior and Interior), Preserve | JOB | $0.00 | ||
| D-09 | Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect | JOB | $0.00 | ||
| D-10 | Tanks (Oily Waste), Clean and Inspect | JOB | $0.00 | ||
| D-11 | Tanks, Preserve (100%) | JOB | $0.00 | ||
| D-12 | Tanks (Ballast), Clean and Inspect | JOB | |||
| D-13 | Tanks (MP Fuel Service), Clean and Inspect | JOB | |||
| D-14 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | JOB | |||
| D-15 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | |||
| D-16 | Sewage Holding Tank(s), Clean and Inspect | JOB | |||
| D-17 | Sewage System, Modify | JOB | |||
| D-18 | Deck Covering Pilot house | JOB | |||
| D-19 | Cargo Handling Elevator, Annual Inspection and Test, Perform | JOB | |||
| D-20 | Incinerator, Inspect and Test | JOB | |||
| D-21 | Fire Detection System, Inspect and Test | JOB | |||
| D-22 | Deck Covering (Polymeric), Repair and Seal | JOB | |||
| D-23 | Stern Deck, Renew and Repair | JOB | |||
| D-24 | Port Steering Gear HPU Hydraulic Piping, Replace | JOB | |||
| D-25 | Sewage Piping, Clean and Flush | JOB | |||
| O-00A | Insert your Composite Labor Rate Unit Price: $______; Quantity: 1,934; Unit of Issue: Hour; Insert your Extended Price: [1,934 X hourly rate quoted] $____________. The estimated lump sum amount to be entered for this item is the combined extended price for composite labor | Insert proposed Composite Labor rage inb this block | Hour | 1886 | |
| D-00B | Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________. The estimated lump sum amount to be entered for this item is the combined extended price materials and subcontractors. | NSP | Insert percentage markup in this block | ||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(4/24/2025) Draft-00 - Page &P of &N
File details come from the government source that posted it. Updated .