70Z08526QLREP0011 Attachment 1 Price Schedule.xls

XLS spreadsheet 31 KB Posted

Attached to
Dockside (DS): USCGC MIDGETT FY26 Repair
Solicitation number
70Z08526QLREP0011
Issued by

About this file

This is a Price Schedule (Attachment 1) for a Request for Quote (RFQ) solicitation for dockside repairs of the USCGC MIDGETT (WMSL-757), a U.S. Coast Guard cutter homeported in Honolulu, Hawaii. The price schedule establishes 25 definite work items (D-01 through D-25) covering maintenance and repair work including fire prevention systems, crane maintenance, tank cleaning and inspection, deck repairs, piping replacement, structural renewal, and system testing. Additionally, the schedule requires offerors to provide pricing for composite labor (O-00A) at an estimated 1,934 hours with a blank unit price field, an all-inclusive markup/loading rate for materials and subcontractors (O-00B) to be applied to a $100,000 base, and 5 laydays (O-00Z) at $0.00. The solicitation is issued by the Department of Homeland Security U.S. Coast Guard under solicitation number 70Z08526QLREP0011 for Fiscal Year 2026, Quarter 4 work.

Offerors must provide detailed pricing for each line item and establish their composite labor rate and material/subcontractor markup percentages on the price schedule. All quotes submitted must remain valid and firm for 120 calendar days from the solicitation close date. The requirement includes furnishing all necessary labor, materials, services, equipment, supplies, power, and facilities to perform the dockside repairs in accordance with the attached Performance Work Statement and all specifications. Seven additional attachments support this solicitation, including a Performance Work Statement, consolidated references, past performance questionnaire, questions and answers, government property report, and a Department of Homeland Security Non-Disclosure Agreement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC MIDGETT (WMSL-757) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-01Fire Prevention, ProvideJOB$0.00
D-02Folding Boom Cranes, Biennial Maintenance, PerformJOB
D-03Talon Grid (Type 18-08), Inspect and TestJOB
D-04RQAWTS 21 D (05-54-2), Remove and ReinstallJOB
D-05Tenting, ProvideJOB
D-06Fall Arrest D-Rings, Remove and ReinstallJOB$0.00
D-07Superstructure (Top of Stack), RenewJOB$0.00
D-08Top of Stack (Exterior and Interior), PreserveJOB$0.00
D-09Grey Water Holding Tank(s) and Lift Stations, Clean and InspectJOB$0.00
D-10Tanks (Oily Waste), Clean and InspectJOB$0.00
D-11Tanks, Preserve (100%)JOB$0.00
D-12Tanks (Ballast), Clean and InspectJOB
D-13Tanks (MP Fuel Service), Clean and InspectJOB
D-14Tanks (MP Fuel Stowage and Overflow), Clean and InspectJOB
D-15Tanks (Aviation Fuel Stowage and Overflow), Clean and InspectJOB
D-16Sewage Holding Tank(s), Clean and InspectJOB
D-17Sewage System, ModifyJOB
D-18Deck Covering Pilot houseJOB
D-19Cargo Handling Elevator, Annual Inspection and Test, PerformJOB
D-20Incinerator, Inspect and TestJOB
D-21Fire Detection System, Inspect and TestJOB
D-22Deck Covering (Polymeric), Repair and SealJOB
D-23Stern Deck, Renew and RepairJOB
D-24Port Steering Gear HPU Hydraulic Piping, ReplaceJOB
D-25Sewage Piping, Clean and FlushJOB
O-00AInsert your Composite Labor Rate Unit Price: $______; Quantity: 1,934; Unit of Issue: Hour; Insert your Extended Price: [1,934 X hourly rate quoted] $____________. The estimated lump sum amount to be entered for this item is the combined extended price for composite laborInsert proposed Composite Labor rage inb this blockHour1886
D-00BInsert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________. The estimated lump sum amount to be entered for this item is the combined extended price materials and subcontractors.NSPInsert percentage markup in this block
O-00ZLaydaysDay5$0.00
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(4/24/2025) Draft-00 - Page &P of &N

File details come from the government source that posted it. Updated .