This is a Scope of Work for an on-site inspection and condition assessment of the No. 2 Ship Service Diesel Generator (SSDG) aboard USCGC MIDGETT (WMSL-757) in Honolulu, Hawaii.
The contractor shall provide a Caterpillar-qualified technician to conduct a one-day inspection between July 21-30, 2026. The inspection must assess the generator's overall material condition, identify discrepancies, failed or degraded components, and determine the severity of findings. The technician shall review accessible systems including cooling, fuel, lubrication, mounting, electrical, and control-related components; identify all parts and components requiring replacement or repair with available part identification information; assess the urgency of any items requiring immediate action; and provide a verbal out-brief to the designated government representative before departing. The background indicates the generator has experienced issues with black lube oil leakage, excessive crankcase pressure, and oil purging from vent doors during operation, suggesting potential internal engine problems requiring expert diagnosis.
The contractor must deliver a comprehensive written report within three working days including identification of the SSDG, summary of inspection performed, detailed findings with severity assessments, recommended corrective actions, a consolidated parts list with part numbers, nomenclature, quantities, replacement reasons, and urgency levels, plus any additional troubleshooting recommendations and inspection limitations encountered. The vendor qualifications require the technician to be qualified to inspect and assess Caterpillar marine or industrial diesel generator equipment with sufficient experience to identify required repairs and replacement parts. Government-furnished support includes access to the vessel, escort as required, maintenance history, casualty information, and equipment identification data. The scope explicitly excludes repairs, parts replacement, and follow-on corrective maintenance unless separately authorized. Service acceptance requires completion of the on-site inspection, timely delivery of the written report with a complete recommended parts list, and completion of the verbal out-brief.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOTICE OF INTENT TO SOLE SOURCE 70Z08526N026969.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work USCGC MIDGETT (WMSL-757) – No. 2 SSDG InspecƟon, CondiƟon Assessment, and Parts IdenƟficaƟon
LocaƟon:
USCGC MIDGETT (WMSL-757)
400 Sand Island Parkway Honolulu, HI 96819
Period of Performance: Coordinate 1 day from:
21 Jul 2026- 30 Jul 2026
ObjecƟve:
Provide a Caterpillar-qualified technician to board USCGC MIDGETT and inspect the No. 2 Ship Service Diesel Generator (SSDG) to assess its current condiƟon, determine the severity of any deficiencies, and idenƟfy the repairs and replacement parts required.
Background:
While operaƟng No. 2 SSDG in parallel with No. 1 SSDG, ship’s force observed black lube oil on the port side of the generator block, supports, and adjacent deck plates, and iniƟal invesƟgaƟon idenƟfied a loose gravity drain hose from the forward crankcase vapor filter housing to the crankcase. AŌer cleanup and inspecƟon, MCMS trends and follow-on checks of the crankcase relief doors, valve train, crankcase vapor air-separator filters and hoses, turbochargers, and engine rotaƟon revealed no obvious failure, and a no-load test showed -1.5 in. H2O crankcase vacuum. When the generator was later paralleled to the bus, oil and smoke purged from the crankcase vent doors within seconds and the dipsƟck was forced parƟally out of the sounding tube, and although oil sampling showed 2 percent thickening with no fuel diluƟon and no current evidence of coolant in the sump, ship’s force lacks compression test capability and will conƟnue troubleshooƟng with focus on cylinder heads, head gaskets, and head spacers, parƟcularly given previously elevated coolant pressure and coolant purging from the expansion tank cap.
Scope:
The contractor shall provide all labor necessary to perform an on-site inspecƟon and technical assessment of the vessel’s No. 2 SSDG.
Required Tasks:
Inspect the No. 2 SSDG for overall material condiƟon, operaƟonal concerns, visible damage, leaks, abnormal vibraƟon, abnormal noise, overheaƟng, wear, and other signs of degraded performance.
Review accessible associated systems and components, including cooling, fuel, lubricaƟon, mounƟng, electrical, and control-related components.
IdenƟfy any discrepancies, failed components, degraded parts, or condiƟons affecƟng reliability, operability, or conƟnued service.
Assess and advise on the severity of each finding.
IdenƟfy recommended correcƟve acƟons for each finding.
IdenƟfy all parts and components that require replacement or repair.
Provide available part idenƟficaƟon for each item requiring replacement, including part number, nomenclature, quanƟty, and recommended source informaƟon if known.
IdenƟfy any items requiring immediate acƟon, scheduled repair, monitoring, or follow-on troubleshooƟng.
Provide a verbal out-brief to the designated government representaƟve before deparƟng the vessel.
Required Report Deliverables:
The contractor shall provide a wriƩen report for the No. 2 SSDG no later than 3 working days aŌer compleƟon of the inspecƟon. The report shall include:
IdenƟficaƟon of the SSDG inspected
Summary of inspecƟon performed
Detailed findings
Severity assessment for each finding
Recommended correcƟve acƟon for each finding
A consolidated parts list of all items recommended for replacement or repair
Part number, if known, for each recommended item
Part descripƟon/nomenclature for each recommended item
Required quanƟty for each recommended item
Reason for replacement or repair for each recommended item
Urgency, if applicable, for each recommended item
Any addiƟonal troubleshooƟng or follow-on acƟons recommended
Any inspecƟon limitaƟons or access restricƟons encountered
Vendor QualificaƟons:
Technician shall be qualified to inspect and assess Caterpillar marine or industrial diesel generator equipment.
Technician shall have sufficient experience to idenƟfy required repairs and recommended replacement parts for the installed SSDG.
Government-Furnished Support:
The government will provide access to the cuƩer, escort as required, and access to the No. 2 SSDG and related spaces as operaƟonally available.
Ship’s force will provide available maintenance history, casualty informaƟon, and equipment idenƟficaƟon data as available.
Points of Contact:
Engineering Officer: LCDR JusƟn Johnson — JusƟn.L.Johnson@uscg.mil
CWO MaƩhew Temle — maƩhew.temple@uscg.mil
Exclusions:
This scope includes inspecƟon, assessment, and reporƟng only.
Repairs, replacement of parts, and follow-on correcƟve maintenance are not included unless separately authorized.
Acceptance Criteria:
The service will be considered complete upon:
CompleƟon of the on-site inspecƟon of the No. 2 SSDG
Delivery of the wriƩen inspecƟon and assessment report within 3 working days of the inspecƟon
Inclusion of a complete recommended parts list in the report
CompleƟon of a verbal out-brief to the designated government representaƟve