Healy SOW Steam Trap.pdf

PDF 300 KB Posted

Attached to
USCGC Healy Steam trap
Solicitation number
70Z08525Q0029298
Issued by

About this file

This Statement of Work (SOW) details a steam trap survey for the U.S. Coast Guard Healy vessel. The contractor will conduct a comprehensive survey of 300 steam traps across multiple ship systems, utilizing reference drawings from US Coast Guard and Spirax Sarco. Key deliverables include locating and identifying accessible steam traps, tagging traps with stainless steel tags, testing trap operations with an ultrasonic leak detector, and producing a detailed survey report encompassing steam loss analysis, trap performance statistics, failed trap identification, and total cost of ownership recommendations.

The project is scheduled for October 19-26, 2025, with work primarily performed underway at sea between Juneau, Alaska and Seattle, Washington. The government intends to award the contract using a Lowest Price Technically Acceptable (LPTA) method with a firm fixed price. The contractor must be registered in the System Award Management (SAM) and will be responsible for providing all necessary equipment and personnel. The Coast Guard will provide power and staff during the survey, and visitor berthing will be provided for the duration of the Statement of Work.

View the file

Other files

File Type Posted
NOTICE OF INTENT TO SOLE SOURCE Healy steam trap.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

U. S. COAST GUARD HEALY STEAM TRAP SURVEY

• SECTION 1 – GENERAL INFORMATION

1.1 Scope of Work

Contractor shall Conduct Steam Trap survey of 300 various steam traps located per US Coast

Guard Drawing 420-WAGB 535-1, Rev.K, Diagram Steam, Feed & Condensate System and Spirax

Sarco Steam Trap Survey, Dated November 29, 2012 and Steam Trap Survey, Dated June 2, 2014.

In addition to the Steam traps per the drawing referenced in this paragraph, there are also Steam traps to be surveyed per Spirax Sarco DWG S000301, Humidifier Units (Table 14-H) (Table 9-A), and

USCG 420-WAGB-535-008 STEAM AND CONDENSATE MODS FOR OWS INSTALLATION.

These traps are included within the 300 Qty stated above.

Once survey is complete, Submit a CFR of findings from inspections with recommendations.

Customer will install replacements as recommended

Locating and identifying all accessible steam traps onboard with a ships force representative to assist with steam system alignment.

Tagging of all steam traps with stainless steel tags as required

Steam Trap Testing shall include Verify trap operation with ultrasonic leak detector, Scope failed traps for upstream and downstream requirements (iso valves, strainers, etc.)

Steam Trap Survey Report Shall include Steam loss analysis, statistical report of traps surveyed w/ steam losses and pressures, report of failed traps: failed open, closed, isolated and rapid cycle, cost of failed traps, Misapplied or incorrect installations, inventory report of installed traps based on operating unit w/ recommended replacements

Total cost of ownership based on cost of steam, trap population and survey results.

1.1.2 Place of Performance:

1.1.2.1 Unit: USCG HEALY

Location: USCG BASE Juneau

On Deployment-Juneau Alaska enroute to USCG BASE Seattle, WA.

1.1.3 Contracting Officer (KO):

1.1.3.1 Name:

Unit: USCGC HEALY

PH:

FX: N/A

E-mail:

1.1.4 Coast Guard Technical Representative:

1.1.4.1 Name: Forrest J. Heath

Unit: SFLC-LREPL-PE STAFF

PH: 253-263-0521

FX: N/A

forrest.j.heath2@uscg.mil

1.1.5 Contact for questions:

1.1.5.1 Any questions regarding scope of work shall be directed at the Contracting Officer.

1.3 Hours of Operation

1.3.1 The contractor must perform the tasks as required by the SOW under this contract during the following hours: Monday through Friday between 7:00am and 7:00pm unless other time is specified.

Contractor is required to pay for meals at vendors expense. Visitor berthing shall be provided by the ship for the duration of the SOW.

132.1 Period of performance: Juneau,AK Arrive 19 October (perform work Underway at Sea-20 October

2025-26 October 2025) Depart Seattle, WA 26 October 2025.

1.4 Award

It is the governments’ intent to make award based on Lowest Price Technically Acceptable (LPTA) offered through issuance of a firm fixed price contract.

1.4.1. Under FAR 4.1103, a prospective contractor shall be registered in System Award Management

(SAM) prior to the award. Failure for the contractor to be registered in (SAM) shall result in Contracting

Officer proceeding with the next successful registered offeror. Website: www.sam.gov

SECTION 2 – GOVERNMENT FURNISHED PROPERTY AND SERVICES

Government shall provide power and staff while conducting steam survey for the duration of the SOW.

SECTION 3 – CONTRACTOR FURNISHED ITEMS AND SERVICES

Except for those items, services, or commodities specifically stated in section 3 as government furnished, the contractor must furnish everything needed to furnish this contract according to all its terms.

SECTION 4 – SPECIFIC TASKS:

Submit a CFR of findings from inspections with recommendations. Customer will install replacements as recommended

Locating and identifying all accessible steam traps in the requested facility

Tagging of all steam traps with stainless steel tags as required

Steam Trap Testing shall include Verify trap operation with ultrasonic leak detector, Scope failed traps for upstream and downstream requirements (iso valves, strainers, etc.)

Steam Trap Survey Report Shall include Steam loss analysis, statistical report of traps surveyed w/ steam losses and pressures, report of failed traps: failed open, closed, isolated and rapid cycle, cost of failed traps, Misapplied or incorrect installations, inventory report of installed traps based on operating unit w/ recommended replacements

Total cost of ownership based on cost of steam, trap population and survey results.

The contractor shall provide copies of surveys and reports and replacement recommendations to Coast

Guard Technical Representative.