Statement of Work USCGC SEQUOIA.pdf
PDF 92 KB Posted
- Attached to
- USCGC Sequoia UPS replacement
- Solicitation number
- 70Z08525Q0029243
About this file
This Statement of Work (SOW) details the procurement of a Single Phase Uninterruptable Power Supply (UPS) for the USCGC SEQUOIA (WLB 215) vessel. The vendor must provide a UPS cabinet measuring 45.17"H x 43.23" D x 23.87" wide, including specific components: one UPS Internal Assembly (Model NEDM20/10X-120-13575), two 5 kW Power Modules (NEPD5KX-120-13576), one 8kVA input isolation transformer, and two pairs of chassis slides for battery drawers. The UPS must meet military standards MIL-STD-461, MIL-STD-810, MIL-STD-1399, and MIL-STD-167.
Delivery is required within 5 weeks of contract award to FINCANTIERI BAY SHIPBUILDING in Sturgeon Bay, Wisconsin. Vendors must be registered in the System Award Management (SAM) prior to award, with failure to register potentially resulting in the contract being awarded to the next registered offeror. Points of contact include LT Maxwell Regan from USCG-SFLC-IBCTPL Asset Management and CWO4 Albert Lowery from USCGC SEQUOIA. The vendor is required to comply with all applicable Federal, State, and Local laws and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOTICE OF INTENT TO SOLE SOURCE Sequioa.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USCGC SEQUOIA (WLB 215)
Provide Single Phase Uninterruptable Power Supply (UPS)
1. Purpose and Scope
• Vendor shall provide the required UPS that meet MIL-STD-461, MIL-STD-810, MIL-
STD-1399, MIL-STD-167, to CGC SEQUOIA
2. Deliverables
• Vendor shall provide the following to include expedited shipping.
1. One UPS cabinet 45.17”H x 43.23” D x 23.87” wide with all items mounted.
Model NEDM-C-20/10X-240-120-XXXHS.
2. One UPS Internal Assembly, Model NEDM20/10X-120-13575
3. Two 5 kW Power Modules NEPD5KX-120-13576
4. One 8kVA input isolation transformer TR8K60-240:120
5. Includes two pairs of chassis slides for the battery drawers (Code CS)
3. Required Delivery Date
• Delivery of the UPS to CGC SEQUOIA is required within 5 weeks of receipt of award contract.
4. Delivery Location
FINCANTIERI BAY SHIPBUILDING
605 North Third Avenue
Sturgeon Bay, Wisconsin 54235
ATTN: CGC SEQUOIA, CWO4 LOWERY
5. Roles and Responsibilities
• Vendor shall provide the required UPS that meets MIL-STD-461, MIL-STD-810, MIL- STD-1399, MIL-STD-167, to CGC SEQUOIA at above location.
• Under FAR 4.1103 prospective contractor shall be registered in System Award
Management (SAM) prior to award. Failure for contractor to be registered in (SAM) shall result in Contracting Officer to proceed with next successful registered offeror.
Website: www.sam.gov
6. Acceptance Criteria
• N/A
7. Security and Confidentiality
8. Reporting Requirements
9. Legal Compliance
• KTR shall comply with all applicable Federal, State, and Local laws and regulations.
10. Performance Monitoring
12. Points of Contact.
10.1. USCG-SFLC-IBCTPL Asset Management: LT Maxwell Regan.
maxwell.j.regan@uscg.mil Phone: (206) 820-5968
10.2. USCGC SEQUOIA: CWO4 Albert Lowery, email: albert.l.lowery@uscg.mil Phone: (907) 487-mailto:maxwell.j.regan@uscg.mil mailto:albert.l.lowery@uscg.mil
File details come from the government source that posted it. Updated .