CGC KENNEBEC FY24 DS - RFC questions and answers.pdf

PDF 39 KB Posted

Attached to
USCGC KENNEBEC FY24 DS
Solicitation number
70Z08524QIBCT0001
Issued by

About this file

This document contains questions and answers regarding solicitation number 70Z08524QIBCT0001 for USCGC KENNEBEC FY24 DS work items. The solicitation is for preservation and renewal work on various systems and components aboard the USCGC KENNEBEC, including cross deck and spud winches, boiler exhaust stacks, deck coverings, and potable water tanks. The questions and answers provide clarification such as the number of winches to be replaced, which tasks contractors are expected to perform for each work item, and where to find referenced specifications and drawings. Additionally, the response to question 9 notes that per Amendment 0001, the proposal due date was extended to November 29, 2023 at 2:00 pm EST to allow more time for contractors to respond.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CGC KENNEBECFY24 DS

Solicitation 70Z08524QIBCT0001 Amendment 0001

Request for Clarification Questions & Answers

1. WI 8 para 3.2: Is the request for IMIA to accomplish task #s that include preservation or is IMIA to perform all the tasks specified in TABLE 1?

Answer: Yes, preservation of cross deck winch foundations and all tasks in

Table 1.

2. WI 8 para 3.2: Please provide a copy of the document titled "SDLC STD SPEC 5000" listed under Additional Requirements on Table 1.

Answer: It is SFLC not SDLC typo from Spec writer and STD SPEC 5000 will be provided by DoD Safe.

3. WI 10 para 3.2: Similar to 1st question for WI 8, is the request for IMIA to accomplish the preservation only or the other work in Table 1 (disassemble and inspect, renew, groom and lubricate, fabricate and install) as well?

Answer: Yes, perform all work in Table 1 and also preservation.

4. WI 11 para 3.2: Same question as WI 10.

Answer: Yes, preservation of spud winch foundation and all tasks in Table 1

5. WI 006 Boiler Exhaust Stack Uptakes, Commercial Clean paragraph 3.1.13 looking for SFLC Std Spec 6310, paragraph 3.1.13 and don't see it in the references pulled originally.

Answer: SFLC Std Spec 6310 will be provided through DoD Safe.

6. Bluepoint Engineering did the ship check. The specification for WI 008 Crossdeck

Winches, Renew has the USCG supplying two. Table 1-tasks calls for 6 winch assemblies to be replaced. Please clarify how many winches are being replaced and how many the USCG is supplying?

Answer: There are 2 crossdeck winches and 4 spud winches same winches that is where the 6 total comes from,

7. Will the USCG cancel the 100% blast and preserve in Work Items 14 and 16 if the water temperature goes below 50 degrees Fahrenheit? SFLC 6310 does not allow for painting on exterior steel in tanks below 50 degrees, especially potable tank coatings and historically, Portsmouth, VA can get below that temperature in February and

March. Please advise.

Answer: These tanks are interior if needed they would have to provide heat to perform preservation to the inside of the tanks. If heat is required please submit a Condition Found Report (CFR).

8. WI 018 Deck Covering, Interior, Wet and Dry, Renew will you please provide Coast

Guard Drawing 160B-WLIC 1106-1, MAIN DECK FRAMING & PLATING; Coast

Guard Drawing 160-WLIC 1106-2, UPPER DECK FRAMING & PLATING; Coast

Guard Drawing 160-WLIC 4000-2, MACHINERY ARRANGEMENT

(KENNEBEC) (802); Coast Guard Drawing 160-WLIC 160B-WLIC_3306_1

FURNITURE ARRG.

Answer: Drawings will be provided through DoD Safe.

9. As the Solicitation states that proposals are due on 11/20/2023, KTR request that the

Government extends the Proposal Due Date to 11/29/2023. Please advise.

Answer: Per Amemdment 0001 the solicitation close & quote due date is 29

November 2023 @ 2:00 pm EST.