Price Schedule

ATTACHMENT 2: Price Schedule
USCGC HEALY DRY DOCK FY23
Contract Line Item (CLIN)Funding Code4TitleUnit PriceUnit of IssueQuantityExtended Price
001SOIndependent NACE Inspector (Level 3), ProvideJob1$0.00
002SOHull Plating (U/W Body & Freeboard), Ultrasonic TestingJob1$0.00
003SOHull Plating (U/W Body), InspectJob1$0.00
004SOU/W Body, Preserve “100%”Job1$0.00
005SOHull Plating Freeboard, Preserve “100%”Job1$0.00
006SOTanks (MP Fuel Stowage And Overflow), Clean And InspectJob1$0.00
007SOTanks (Ballast), Clean and InspectJob1$0.00
008SOTanks (Ballast), Preserve “100%”Job1$0.00
009SOTransducer Well Deck, PreserveJob1$0.00
010SOVoids (Non-Accessible), Leak TestJob1$0.00
011SOPropulsion Shafts, Alignment CheckJob1$0.00
012SOPropulsion Shaft Bearings (External), Check ClearancesJob1$0.00
013SOPropulsion Shaft Seals (Inflateable), Clean and InspectJob1$0.00
014SOPropulsion Shaft Bulkhead Seals, Annual MaintenanceJob1$0.00
015SOFuel Oil Purifier (FOP) OverhaulJob1$0.00
016SOLube Oil Purifier (LOP) OverhaulJob1$0.00
017SOFathometer Transducer, General MaintenanceJob1$0.00
018SORecapitalize SRD-500/600 Doppler Speed Log SystemJob1$0.00
019SOEM-124, Multibeam Sonar, ReplaceJob1$0.00
020SOBoiler, Annual MaintenanceJob1$0.00
021SORudders, Remove, Inspect and ReinstallJob1$0.00
022SOAnchor Chains and Ground Tackle, Inspect and RepairJob1$0.00
023SOImpressed Current Cathodic Protection System Anodes and Reference Cells, Inspection and Anode RenewalJob1$0.00
024SOA-Frames, Annual InspectionJob1$0.00
025SOPort & Starboard Miranda Davit, Annual Inspect and RepairJob1$0.00
026SO04 Deck Crane (Port) TB 100-55, Annual Inspect and TestJob1$0.00
027SO04 Deck Crane (Starboard) TB 100-55, Annual Inspect and TestJob1$0.00
028SOAft Crane (Port), Annual Inspect and RepairJob1$0.00
029SOAft Crane (Starboard), Annual Inspect and TestJob1$0.00
030SOBow Crane, Annual Inspect and TestJob1$0.00
031SOOceanographic Winch, Inspect and Test (Level 1)Job1$0.00
032SOTrawl / Core Winch, Inspect and Test (Level 1)Job1$0.00
033SODrydock Service, Temporary Fuel Off-LoadJob1$0.00
034SODrydockJob1$0.00
035SOTemporary Services, Provide - CutterJob1$0.00
036SOSea Trial Performance, Support, Provide Price CLIN for five (5) weekdays1, and one (1) weekend day2. Insert price per day for a weekday1 here: $______________, and insert the price per day for a weekend day2 here: $______________to be used in a change request.Job1$0.00
037SODamage Control and Firefighting Systems, PMSJob1$0.00
038SOInternal Hoist, Level 1 Inspect and TestJob1$0.00
039SOAutomatic Main Seawater Strainer, RenewJob1$0.00
040SOHull Penetration RenewalJob1$0.00
041SOValves, Overhaul or RenewJob1$0.00
042SOSea Strainer, Duplex, OverhaulJob1$0.00
043SOBow Thruster, InspectJob1$0.00
044SOAppendages (U/W), Leak TestJob1$0.00
045SOAppendages (U/W), PreserveJob1$0.00
046SODeck Coverings, Interior (Polymeric), RenewJob1$0.00
047SOInstrumented Science Sheaves, InspectJob1$0.00
048SOTanks (Aviation Fuel Service), Clean and InspectJob1$0.00
049SOSteering System and Hydraulic Power Assembly, Inspection and ServiceJob1$0.00
050SOLine Shaft Bearing, Inspection and Repair SealsJob1$0.00
051SOLine Shaft Bearing, RenewJob1$0.00
052SOAdditional Work -

Composite Labor Rate:

Composite Labor Hourly Rate: $_________ ; Quantity: 20,0003 ; Unit of Issue: Hour ; Extended Price: [20,0003 X hourly rate quoted]: _______________ .

Mark-up/Loading Rate for Materials and Subcontractors:

Mark-up percentage:____% ; Unit Price: $500,000.003 ; Quantity: 1 ; Unit of Issue: Percent ; Extended Price: [$500,000.003 X percentage quoted]: ___________ .

Lay Day Price:

Daily Rate: $________ ; Quantity: 303 ; Unit of Issue: Day ; Extended Price: [303 X daily rate quoted]: $________________.

The lump sum amount to be entered for this item is the combined extended prices for composite labor, mark-up for materials and subcontractors, and lay days. The above rates and percentages will be incorporated into the contract and used on task order/s for change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.Lump Sum1$ - 0
Contract Total Evaluated Price$0.00
1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday.
2 Weekend day is Saturday and Sunday
3 Estimated Quantity. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
4 Funding code correlates to original CLIN work is to be performed under.

File details come from the government source that posted it. Updated .