Request for Clarification Attachment (4)
Solicitation No.: 70Z08522QP4503200
ATTACHMENT (4)
REQUEST FOR CLARIFICATIONS
Offerors’ Questions Will be Answered via an Amendment
Offerors’ questions concerning this solicitation shall be submitted in writing, and must be submitted on the attached
“Request for Clarification” form. One question should be submitted on each form. Each form should indicate the name of the offeror’s firm. Questions shall be submitted via e-mail to the point of contacts identified in the appropriate section of the Solicitation.
Request for Clarification
Date: 11/3/21
Section: SOW
Para. No.:
Work Item No.: 12 Para. No.:
3.2, 3.3, 3.4, 3.5, 3.11
Title: Storage
Cages, Install
Question: Please confirm CG DWG 750-WMSL 670-500 referenced in para 3.2, 3.3, 3.4, 3.5, 3.11 should actually be
CG DWG 750-WMSL 672-500, Rev B.
Answer: CG DWG 750-WMSL 672-500, Rev B should have been included rather than CG DWG 750-WMSL 670-
500.
Date: 11/3/21
Section: Synopsis
Work Item No.: Para. No.:
Title: Quotation
Due Date
Question: Contractor is experiencing delays in receiving quotes from our subcontractors and requests a Quotation due date extension from the original date of 11/12/2021 to 11/15/2021.
Answer: The Solicitation Response date is updated as of Amendment A00001. Please refer to 70Z08522QP4503200
A00001 for additional details.
Offeror’s Name:
Solicitation No.:
Date: 10/15/21
70Z08522QP4503200
Section: N/A
Para. No.: N/A
Work Item No.: N/A
Title: N/A
Para. No.: N/A
Para. No.: N/A
Question: What Covid-19 protocols will be in place for this availability and what compliance documentation will be required?
Answer: COVID policy is subject to change as the availability approaches and today’s policy may or may not still be in effect. At a minimum, masks will be required at all times.
Section: 3
Work Item No.: N/A Para. No.: 3.5.1.1
Title: Para. No.: N/A
Question: Will shore power be available or will we need to bring in a generator?
Answer: Generator will be required and pends approval for on the pier laydown from the Civil Engineer.
Solicitation No.:
70Z08522QP4503200
Section: N/A
Work Item No.: N/A
Title: N/A
Para. No.: N/A
Para. No.: N/A
Question: Will shore fresh water be available?
Answer: No.
Offeror’s Name:
Solicitation No.: 70Z08522QP4503200
Date: 10/15/21
Section:
Work Item No.: D-01/D-02
Title: N/A
Para. No.: N/A Para. No.: N/A Para. No.: N/A
Question: For items 1 & 2, how many pits shall the contractor allow to be filled?
Answer: Determination will be made based on UT/PIT results. Without UT/PIT readings, a number of pits cannot be determined.
Date: 10/15/21
Section: N/A Para. No.: N/A
Work Item No.: D-03 /D-04 Para. No.: N/A
Title: N/A Para. No.: N/A
Question: For items 3 & 4, since the tanks are fairly small, can power tool cleaning to SP-11 be used vice blasting?
Answer: Tanks SHALL be blasted, as directed by spec IAW SFLC STD SPEC 6310.