MUNRO (WHEC 378W) DS RTO 20R1.pdf
PDF 1 MB Posted
- Solicitation number
- 70Z08520RP4503000
About this file
This is a solicitation for dockside repair services for two Coast Guard cutters, CGC Douglas Munro and CGC Alex Haley. The contractor will perform repairs listed in the specification documents at the cutters' home port of Kodiak, Alaska within the period of performance for each vessel. The solicitation includes a schedule of supplies and services with unit prices required for all line items. Offerors must submit past performance information, small business self-certification if applicable, welding certifications, and proof of insurance. The closing date for proposals is March 3, 2020 and award is expected on or about March 16, 2020. The contractor must complete all work within each cutter's period of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Page 2 - Amendment 0002.docx | DOCX document | |
| Page 2 - Amendment 0001.docx | DOCX document | |
| SF30-A0001.pdf | ||
| SF30-A0002.pdf | ||
| ATTACH. 1 - Continuation of Synopsis Solicitation (FY 20 DMUNRO & AHALEY)(rev. 1).doc | DOC document | |
| ATTACHMENT 3 - Request for Clarification (DMUNRO & AHALEY)(rev.1 ).doc | DOC document | |
| ATTACH. 4 - Government Property Report.doc | DOC document | |
| ATTACH. 2 - SCHEDULE OF SUPPLIES&SERVICES PRICES (DMUNRO-AHALEY FY 20).docx | DOCX document | |
| ALEX HALEY (WMEC 282) DS RTO 20R1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC DOUGLAS MUNRO (WHEC 724)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: Ryan T Ostrander
(Rev-1, 29 January 2020)
USCGC DOUGLAS MUNRO (WHEC-378W) DOCKSIDE AVAILABILITY FY2020
ii (Rev-1)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items .......................................................................................... viii Principal Characteristics ............................................................................................................................... ix General Requirements WORK ITEM 1: Tanks (Fuel Stowage And Overflow), Clean And Inspect WORK ITEM 2: Non-Skid Decks, Preserve (“Mil-Spec/Flight Deck” System) WORK ITEM 3: Interior Decks, Preserve WORK ITEM 4: Tanks (Potable Water), Clean and Inspect WORK ITEM 5: Tenting, Provide WORK ITEM 6: Ammunition Elevator Level 2 Inspect, Repair & Test WORK ITEM 7: Deck Drains, Repair WORK ITEM 8: Emergency Gas Turbine Exhaust Cooling Drain Piping, Renew WORK ITEM 9: Incinerator Lagging, Renew WORK ITEM 10: Compartment Insulation, Renew WORK ITEM 11: Access Cover and Bolting Ring, Renew WORK ITEM 12: Hull and Structural Plating, Renew (Optional) WORK ITEM 13: Tanks (Aviation Fuel Stowage), Clean and Inspect WORK ITEM 14: Deck Covering (Polymeric), Renew WORK ITEM 15: Flammable Storeroom (3-22-0-K), Restore iii (Rev-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
1/28/20 1 15 Added Work Item
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 111-001, Rev -, Shell Expansion Forward
Coast Guard Drawing 378-FRAM-W 111-002, Rev -, Shell Expansion Aft
Coast Guard Drawing 378-FRAM-W 122-001, Rev A, Transverse Bulkheads 32 and 48
Coast Guard Drawing 378-FRAM-W 131-002, Rev -, Main Deck Plating & Framing Aft
Coast Guard Drawing 378-FRAM-W 132-001, Rev A, 2nd Deck Plating & Framing FORWARD
Coast Guard Drawing 378-FRAM-W 132-002, Rev A, 2nd & 3rd Deck Plating Aft
Coast Guard Drawing 378-FRAM-W 133-001, Rev B, 3rd Deck Plating & Framing FORWARD
Coast Guard Drawing 378-FRAM-W 152-001, Rev B, 01 Deck Plating & Framing
Coast Guard Drawing 378-FRAM-W 167-003, Rev D, List of Manholes
Coast Guard Drawing 378-FRAM-W 259-001, Rev D, Emergency Gas Turbine Exhaust System Diagram
Coast Guard Drawing 378-FRAM-W 436-009, Rev G, Halon Release Alrm Sys Ckt 1 FR ISO & Elem
W.D.
Coast Guard Drawing 378-FRAM-W 507-004, Rev C, Machinery and Pipe Labels and Markings
Coast Guard Drawing 378-FRAM-W 508-001, Rev C, Insulation Schedule
Coast Guard Drawing 378-FRAM-W 512-001, Rev K, HVAC LINE Diagram
Coast Guard Drawing 378-FRAM-W 512-010, Rev F, HVAC Instal & Construction Dets
Coast Guard Drawing 378-FRAM-W 512-011, Rev K, HVAC a&D FORWARD Frame 72
Coast Guard Drawing 378-FRAM-W 512-012, Rev L, HVAC a&D FR72-120 Blw Mn Dk
Coast Guard Drawing 378-FRAM-W 526-001, Rev D, Diagram Weather Deck and Helo Hangar Drain
Sys
Coast Guard Drawing 378-FRAM-W 526-002, Rev D, Weather Deck & Misc Drains Fwd FR 175
Coast Guard Drawing 378-FRAM-W 526-003, Rev F, Weather Deck & Misc Drains Aft FR 175
Coast Guard Drawing 378-FRAM-W 528-001, Rev F, Diagram Plumbing & Interior Deck Drains
Coast Guard Drawing 378-FRAM-W 593-006, Rev -, Incinerator Exhaust
Coast Guard Drawing 378-FRAM-W 634-001, Rev G, Deck Covering
Coast Guard Drawing 378-FRAM-W 635-001, Rev M, Insulation Arr & Det
Coast Guard Drawing 378-FRAM-W 644-007, Rev D, Waste Handling System Arrangement Incinerator
Exhaust
Coast Guard Drawing 378-FRAM-W 712-002, Rev E, Ammunition Elevator Control Elementary
Schematic Wiring Diagram v (Rev-1)
Coast Guard Drawing 378-FRAM-W 712-022, Rev B, 76MM Vertical Ammo Hoist Arr & Det
Coast Guard Drawing 378-FRAM-W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 3282B, SWBS 712, May 1997, Ammunition Elevator
Coast Guard Technical Standard (TS) 772, Rev A, Weapons Elevators and Ammunition Hoists
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior
Deck Covering Systems
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
ASTM International (ASTM) D2475-01(2008), 2008, Standard Specification for Felt
Code of Federal Regulations (CFR) Title 29, Part 1910, 2017, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, 2015, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 40, Jul 2000, Protection of the Environment
Commercial Item Descriptions (CID) A-A-59316, Nov 2003; Abrasive Materials for Blasting
Federal Specification (Fed Spec) QQ-N-281D, 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
MIL-PRF-24667, Rev C, 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
NAVSEA Drawing 804-5959214, Rev A, Piping Insulation – Installation Details
QPL-24667, May 2008, Qualified Product List (Military) of Products Qualified Under Detail
Specification MIL-PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering
Application
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 01 (SSPC-SP 1), 2016, Solvent Cleaning vi (Rev-1)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 03 (SSPC-SP 3), 2018, Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 15 (SSPC-SP 15), 2013, Commercial Grade Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 06/NACE No.3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 02, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 7/NACE No. 4, 2007, Brush-Off Blast Cleaning vii (Rev-1)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
viii (Rev-1)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Non-Skid Decks, Preserve (“Mil-Spec/Flight Deck― System)
3 Interior Decks, Preserve
6 Ammunition Elevator Level 2 Inspect, Repair & Test
14 Deck Covering (Polymeric), Renew ix (Rev-1)
PRINCIPAL CHARACTERISTICS
378 WHEC (W-CLASS: DOUGLAS MUNRO)
PHYSICAL
Length overall 378' 3"
Length between perpendiculars 350' 0"
Maximum beam (@ 13' 6" dwl) 42' 0"
Beam @ main deck 42' 0"
Depth 26' 3/8"
Main deck camber 6" in 21' 0"
Minimum berth depth 30' 0"
Height of highest projection 116'
Draft, fwd @ full load 14.78'
Draft, aft @ full load 15.61'
Draft, fwd @ minimum operating 14.63'
Draft, aft @ minimum operating 15.33'
Full load displacement 3313 long tons
Minimum operating displacement 2762 long tons
Light ship displacement 2433 long tons
HULL
Frame spacing 1' 0"
Material
Deckhouse, fwd of frame 96 HY-100 Steel
Main deck frames 183 to 242-1/2 and fwd of FR 96
HY-80 Steel
01 level frames 183 to 316 HY-80 Steel
Lower hull around bow thruster, port and starboard strakes A-3 and A-4, frames 56 to 96
HY-80 Steel
Masts and superstructure above the 01
Deck
Type 3456 Aluminum
Remaining ASTM A-131
MACHINERY
Type of propulsion CODOG
Two diesel engines Fairbanks More 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total
Two gas turbines Pratt and Whitney FT4A-2; 36,000 SHP total
Two controllable pitch propellers Escher Wyss 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines
Two reduction gears Western Gear
Electrical characteristics Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room)
One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator
Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators
Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators x (Rev-1)
TANK CAPACITIES
Diesel oil 192,858 gal. (95%)
Fresh water 17,695 gal. (100%)
JP-5 fuel 27, 603 gal. (95%)
1 (Rev-1)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-1)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is a federal Large
Quantity Generator (LQG) of hazardous waste (EPA ID #AK9690330742) and is a RCRA-permitted hazardous waste management facility.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
3 (Rev-1)
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint
Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of
SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4 (Rev-1)
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay
(RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-1)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
8 (Rev-1)
TIME
9 (Rev-1)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
10 (Rev-1)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-1)
12 (Rev-1)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
13 (Rev-1)
12300_0316_FLT
REC_12311_FLT_378’ WHEC ‘W’ Class (ALL) (0717)
WORK ITEM 1: Tanks (Fuel Stowage And Overflow), Clean And Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TYPE OF TANK LOCATION CAPACITY - 95%
(gallons) LOW SUCTION (gallons)
Diesel Storage 4-88-3-F 2,292 4
Diesel Storage 5-104-0-F 20,918 230
Diesel Storage 5-120-0-F 27,133 1050
Diesel Storage 5-168-1-F 5,594 15
Diesel Storage 5-168-2-F 5,553 15
Emergency Generator
Diesel Fuel Service 2-341-2-F 600 15
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
Federal Specification (Fed Spec) QQ-N-281D, 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
14 (Rev-1)
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Fuel
Piping
Tank access cover
3.1.4.1 Remove all remaining tank contents (approximately 5% of original CAPACITY - 95%), after the existing tank contents have been emptied by the vessel’s crew until loss of suction (using the vessel’s existing transfer systems). Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations.
3.1.4.3 Provide the following to support Coast Guard personnel to refuel equipment:
Tagout crane way equipment
Oil transfer supervisor.
NOTE
Vessel may come in with less tank fluid contents than specified above.
NOTE
Initial and post repair operational tests apply only to tanks that possess TLIs.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
15 (Rev-1)
3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel test TLIs for tanks listed in paragraph 1.1 (Intent) to demonstrate existing operational condition.
Submit a CFR.
3.1.6 Plug log. The Contractor shall keep a written record of all plugs put in any tank vents. A separate list shall be kept for each tank being entered.
3.1.6.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.1.6.2 The plug log shall be available to the Coast Guard Inspector when the inspector is performing his close-out inspection on each tank.
3.2 Cleaning requirements. The Contractor shall refer to Coast Guard Drawing 378 FRAM-W 801-001 for guidance. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.3 Tank content and waste disposal. The Contractor shall dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
Tank structural condition.
Inaccessible areas.
Condition of tank coating, including; measurements taken, percentage, location, and type of coating failure (if tank interior surfaces are coated).
Tank level indicator (TLI) and/or float switch condition, as applicable.
Sounding/vent tube and striker plate condition (including vent check valve and waster piece).
Suction and discharge piping condition.
Fastener material and condition (correct fastener material is stainless steel).
3.4.2 Measure up to 10 “pits” within each tank as designated by the Coast Guard Inspector using a
Contractor supplied ‘Pit Gauge’. Include pit measurement results in CFR specified above, showing where pit measurements were taken and the depth of the pit.
3.5 Tank closing. The Contractor shall ensure that the tank(s) remain open for at least 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
Chase threads on studs to ensure even installation of the access covers. Renew any damaged nuts.
3.5.1 The Contractor shall renew up to 10% of missing or damaged nuts and washers.
16 (Rev-1)
3.6 Operational test – post repairs. After completion of work, the Contractor shall witness Coast Guard personnel test all designated tank TLIs and vent check valves to prove satisfactory operating condition.
Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.7 Ultrasonic thickness (UT) measurement. The Contractor shall take a total of 200 UT measurements of tank plating, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec
0740, Appendix C. Submit a CFR.
4. NOTES
4.1. Coast Guard personnel. Coast Guard personnel will operate all shipboard machinery and equipment.
4.2 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.
4.3 Tank inspection. The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.
4.4 Tank content restoration. The Ship’s force will procure new fluids and refill all tanks at the appropriate time.
17 (Rev-1)
63121_1217_FLT
REC_63120_Dks_Exterior_FLT_378W WHEC (ALL) (0814)
WORK ITEM 2: Non-Skid Decks, Preserve (“Mil-Spec/Flight Deck” System)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the following deck surfaces in Table 1 using MIL-PRF-24667 Type V Comp. G non-skid system:
TABLE 1: PRESERVATION LOCATIONS
PRESERVE DECK MATERIAL LOCATIONS
Boat Decks Steel 01 Level Weather Deck, FR 100 to 232, Port and Stbd
LE Vestibule Steel 01 Level Interior Deck, 01-176-0-A
Plenum Deck Aluminum 02 Level Weather Deck, FR 177 to 212
SATCOM Deck Aluminum 02 Level Weather Deck, FR 87 to 96
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and
Colors Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Commercial Item Descriptions (CID) A-A-59316, Nov 2003; Abrasive Materials for Blasting
MIL-PRF-24667, Rev C, 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering
Application
18 (Rev-1)
QPL-24667, May 2008, Qualified Product List (Military) of Products Qualified Under Detail
Specification MIL-PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-
Adhering Application
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface
Preparation Standard SSPC-SP 10/NACE No. 02, 2007, Near-White Blast Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.3.2.3 Ultrasonic Thickness (UT) Measurement (LE Vestibule only)
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Apply protective measures as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection) to the following components, spaces and equipment:
Adjacent vertical (beyond what is specified in paragraph 3.3.1 (System particulars)).
Ventilation intakes.
Deck fittings.
Deck equipment.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Deck Drains
Davits
SATCOM equipment
Deck shoretie penetrations
3.2 Surface preparation water quality. The Contractor shall ensure that water in all surface preparation tasks, including pre-surface preparation wash and waterjetting is of sufficient purity and quality that it does not prevent the surface being cleaned from achieving the required degree of surface cleanliness or non-visible contamination criteria. Ensure that surface preparation water does not contain sediments or other impurities that are destructive to the proper functioning of the cleaning equipment.
3.3 Preservation requirements particulars. The Contractor shall accomplish the following tasks. Use Coast
Guard Drawing 378 FRAM-W 801-001, as guidance.
19 (Rev-1)
3.3.1 Pre-surface preparation wash. Prior to accomplishing surface preparation, accomplish low-pressure
(less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Capture, contain, and dispose of wash water for proper disposal in accordance with all Federal, state and local regulations.
3.3.2 Surface preparation and coating application. Prepare and coat the deck surfaces designated in paragraph 1.1 (Intent), including bitt and chock foundations, machinery rack guards and machinery foundations, hatches and hatch guards, stanchion sockets, vent pipes, angle coaming area, and approximately six inches up all adjacent vertical surfaces (as applicable) in accordance with SFLC Std
Spec 6310. Use the system specified for “Weather Decks, Non-Skid, MIL-SPEC Coating for Steel or
Aluminum”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Select
Type V for extended durability.
3.3.2.1 Work Coordination. The contractor shall coordinate the accomplishment of this work item with the following work items:
Tenting, Provide
3.3.2.2 Substrate inspection. After completion of surface preparation and before coating application, perform a visual inspection of the prepared substrate, and submit a CFR.
3.3.2.3 Ultrasonic thickness (UT) measurement. The contractor shall take a total of 300 UT measurements in accordance with SFLC Std Spec 0740, Appendix C in locations designated by the Coast Guard
Inspector and using Coast Guard drawing 378 FRAM-W 801-001 as guidance. Submit a CIR for the LE
Vestibule. Submit a CFR for all other deck surfaces.
3.3.2.4 Color selection. Select and use Gray (36076) as the finish/top coat color.
3.3.2.5 Non-skid exempted areas. Apply top color coating only (do not apply non-skid topcoat) over vertical surfaces, and the following areas:
Within two inches of deck fittings, hatches, welds, and protrusions.
Within six inches of deck coaming, bulkheads, and deck edges.
Within six inches of all deck edges and bulkheads.
Within two inches of deck foundations (two inches measured from outermost portion of foundation, for example, foundation brackets on anchor windlass).
Over deck fittings.
Over waterways.
NOTES
1. Surface preparation may be accomplished by waterjetting, abrasive-blasting, or a combination of the two.
2. Waterjetting only reveals an existing substrate anchor profile and does not create a new profile. Abrasive may be introduced to the waterjet stream, to achieve required surface profile and/or greater productivity. Abrasive blast grit (if used for preparing the aluminum surfaces) shall conform to CID-A-
A59316, Type I or Type IV.
3. Surfaces being preserved are considered “critical-coated surfaces”.
20 (Rev-1)
4. Unless a containment system is used to contain surface preparation dust and debris and coating application overspray during pier side/dockside preservation, the following must be adhered to:
a. All surface preparation tools/equipment must vacuum-shrouded.
b. Coatings must be applied by brushing or rolling.
3.3.2.6 Non-skid surface appearance and texture. Ensure that the non-skid surface shall show a pattern of peaks and ridges. The ridge profile shall be continuous and reasonably uniform. Peaks and ridges shall be generally in the same direction (fore and aft), approximately ½ to 1 inch apart, and approximately 1/16 to
3/32 inches high. All weld seams shall be cross-rolled from a minimum of 3 inches on either side of the weld.
3.4 Low temperature cure system. If a Change Request has been authorized and released, the Contractor shall apply a low temperature cure system, conforming to MIL-PRF-24667, Type VIII, Composition G.
Ensure that top color coating is a silicone alkyd enamel product, recommended by the nonskid coating system manufacturer, in lieu of the polyurethane-based coating listed on QPL-24667.
NOTES
1. The low temperature system is only authorized for application at temperatures between 35-45 degrees F.
2. Primer, non-skid, and color coatings must be procured as part of a system kit from the system’s manufacturer or supplier.
3.5 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
4. NOTES
4.1 Definition of coaming. Vertical raised sections of deck plating around an opening that provide a frame and/or deflect water, such as around a hatch or gooseneck.
21 (Rev-1)
22 (Rev-1)
S_63000_1117_SWIT
S18_047_63100_RTO_0724_724
S18_049_63100_RTO_0724_724
WORK ITEM 3: Interior Decks, Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the interior decks listed in Table 1.
TABLE 1 – WORK AREAS
COMPARTMENT
APPROXIMATE AREA
SQUARE FEET
REMARKS
Deck locker (1-268-1-A) 60
Fuel locker (1-269-2) 50
Fan Room (1-281-1-Q) 50 Ducting and Fans will need to be removed to fully access deck
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 131-002, Rev -, Main Deck Plating & Framing Aft
Coast Guard Drawing 378-FRAM-W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and
Colors Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures http://cgweb.lant.uscg.mil/vdiv/References/ESWBS.xls http://cgweb.lant.uscg.mil/vdiv/References/ESWBS.xls
23 (Rev-1)
OTHER REFERENCES
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 01 (SSPC-SP
1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP
11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 15 (SSPC-SP
15), 2013, Commercial Grade Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface
Preparation Standard SSPC-SP 10/NACE No. 02, 2007, Near-White Blast Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2 Substrate Inspection.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Ducting
Fans
NOTE
Ducting and Fans will need to be removed to properly preserve deck in 1-281-
1-Q
3.2 Substrate inspection. Upon completion of surface preparation and prior to application of primer coat
(see 3.3 (Surface preservation)), the Contractor shall perform a visual inspection of the prepared surfaces.
Take a total of 150 UT measurements in accordance with SFLC Std Spec 0740, Appendix C in locations designated by the Coast Guard Inspector and using Coast Guard Drawing 378-FRAM-W 131-002 as guidance. Submit a CIR.
3.3 Surface preservation. The Contractor shall prepare and coat the decks listed in Table 1 using the system specified for “Decks, Metal Interior and Non-Skid Areas (Metal Decks – No Application of Deck
Coverings, Steel)” in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems).
Select color using COMDTINST M10360.3 as guidance.
24 (Rev-1)
3.3.1 Select power tool cleaning to “bare metal” (SSPC-SP 11) with a minimum 1.0 mil anchor profile as the method of surface preparation.
3.3.2 Attach a suitable vacuum to the power tool equipment, to capture and contain all dust and paint debris.
3.3.3 After completion of painting, clean the compartment and remove all contractor generated dirt and debris.
4. NOTES
FIGURE 1: FAN AND DUCTING INTERFERENCES IN 1-281-1-Q
25 (Rev-1)
FIGURE 2: FAN AND DUCTING INTERFERENCES IN 1-281-1-Q
26 (Rev-1)
27 (Rev-1)
12314_1117_FLT
REC_12314_FLT378’ WHEC ‘W’ Class (ALL) (0611)
WORK ITEM 4: Tanks (Potable Water), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 - TANKS
TYPE OF TANK LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Potable Water 4-280-2-W 4,345 200
Distillate Feed Water 5-176-0-W 9,005 200
1.2 Government-furnished property.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 378-FRAM-W 801-001, Rev J, Booklet of General Plans
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water
System Components - Health Effects
American National Standards Institute/American Water Works Association (ANSI/AWWA)
C652, 2011, Disinfection of Water-Storage Facilities
28 (Rev-1)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work.