Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Request For Proposal
Solicitation No. 70Z08520RP4500700
Dockside Repairs for CGC WAESCHE (WHEC 418)
Amendment No. 0001
The purpose of this amendment is as follows:
1. Respond to the following request for clarification : Missing Drawing 750-WMSL-512-527. A copy of this drawing will be sent to you via AMRDEC Safe site at the following link https://safe.apps.mil/ to the potential offerors who have already requested the original set of consolidated drawings references specified in the Specifications, Attachment 1 to the solicitation.
2. Extend the solicitation closing date from August 19, 2019 (2:00 PM PST)to August 28, 2019, (2:00 PM PST).
3. Extend request for clarification from August 11, 2019 to August 22, 2019.
b. All other terms and conditions specified on the solicitation will remain unchanged.
https://safe.apps.mil/
ATTACHMENT 4 – REQUEST FOR CLARIFICATION
OFFERORS’ QUESTIONS WILL BE ANSWERED BY AN
AMENDMENT
USCGC WAESCHE (WMSL 751) DOCKSIDE REPAIRS FQ1 FY20
OFFERORS’ QUESTIONS
1. Offerors’ questions concerning this solicitation shall be submitted in writing, and must be submitted on the attached “Request for Clarification” form. One question should be submitted on each form. Each form should indicate the name of the offeror’s firm.
(a) Both contractual and technical questions must be submitted to the addressee listed below:
USCG COMMAND
Surface Forces Logistics Center
LRE-C&PD2
1301 Clay Street, Suite 800N Oakland, CA 94612
(b) Questions may be submitted by via e-mail at Wilma.L.Estrada@uscg.mil.
mailto:Wilma.L.Estrada@uscg.mil
ATTACHMENT 4 – REQUEST FOR CLARIFICATION
OFFERORS’ QUESTIONS
Offeror’s Name:
Date:
Question No.
REQUEST FOR CLARIFICATION
RFP No.: 70Z08520RP4500700 PARA NO.
SOLICITATION SECTION: PARA NO.
DEFINITE ITEM NO. PARA NO.
TITLE: PARA NO.
QUESTION:
RESPONSE:
Federal Marine and Defense Services
Specification WI-009 2. References
Intake Vent Mod 3.5
Contractor is still missing Drawing 750-WMSL-512-527, contractor request one week extension from the date of receipt of drawing.
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0001 |
| Code[0]: 70Z085 |
| Code[1]: 2 |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: SUBJECT: SOLICITATION NO. 70Z08520RP4500700, Dockside Repairs of CGC WAESCHE (WMSL418) |
SEE PAGES 2 FOR DESCRIPTION
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: USCG, Surface Forces Logistics Centers |
CP&D2 - LREPL
1301 Clay Street, Suite 800N Oakland, CA
| NameandAddress[0]: TO ALL PROSPECTIVE OFFERORS |
| AdministeredBy[0]: SAME as BLOCK #6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 2 |
| EffectiveDate[0]: 08/15/2019 |
| Dated9B[0]: |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: Off |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: |
| CopiesReturned[0]: |