ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES page 1 of 1
RFP NO. 70Z08520RP4500700
USCGC WAESCHE (WMSL 751) DOCKSIDE REPAIRS Q1 FY20
B.1 CLIN 0001 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated on the total proposed price for all items.
ITEM
NO.
DESCRIPTION QTY UNIT UNIT
PRICE
AMOUNT
D-01 WT Hatches (with Scuttles) (Above DC Lines), Renew 1 JB $ $
D-02 Cargo Handling Elevator, Annual Inspection and Test, Perform
1 JB $ $
D-03 Deck Covering (Polymeric), Renew 1 JB $ $ D-04 Flex Hose Assemblies, Renew 1 JB $ $
D-05 Dewatering Pumps (P-6) Stowage Rack Fabricate and Install
1 JB $ $
D-06 Main Gas Turbine Water Wash Strainer, Relocate 1 JB $ $ D-07 Portable Brow Storage, Relocate 1 JB $ $ D-08 QAATD/QAWTD, Replace (NSC2) – 1st Set 1 JB $ $ D-09 Intake Ventilation, Modify 1 JB $ $ D-10 Deck Covering (Slip-Resistant), Renew 1 JB $ $ D-11 High Purity Water Tank, Clean and Inspect 1 JB $ $
D-12 Propulsion Gas Turbine, Exhaust Piping, Commercial Clean
1 JB $ $
D-13 Ship Service Diesel Generator, Exhaust Piping, Commercial Clean
1 JB $ $
D-14 Circuit Breakers (Draw Out), Inspect and Test 1 JB $ $ D-15 Hydro – Pneumatic Tank(s), Clean and Inspect 1 JB $ $ D-16 Anchor Windlass Level 2, Inspect and Repair 1 JB $ $ D-17 Deck Covering (Ceramic Tile), Renew 1 JB $ $
TOTAL AMOUNT OF ALL DEFINITE ITEMS $
B.2 COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, entitled "COMPOSITE LABOR RATE.”
LABOR HOUR RATE
ESTIMATED QUANTITY
873 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only.
The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.