Attachment 2 - BARBARA MABRITY (WLM 175) Specification Rev0.pdf
PDF 2 MB Posted
- Attached to
- USCGC BARBARA MABRITY (WLM 559) Dry Dock FY20
- Solicitation number
- 70Z085-20-Q-P4524500
About this file
This is a request for quotation (RFQ) from the U.S. Coast Guard for ship repair services on the USCGC BARBARA MABRITY, a 175-foot buoy tender. The contractor will provide all necessary labor, materials, and equipment to perform dry dock repairs in accordance with the attached specification and schedule of supplies and services. The performance period is March 24 to May 12, 2020 at the contractor's facilities. Quotes are due by March 13, 2020 and the contract will be a firm fixed-price contract for commercial items under FAR Part 12 and FAR Subpart 13.5. The requirement is set aside for small businesses with a NAICS code of 336611 and size standard of 1,250 employees. Quoters must submit documentation of past performance, insurance, welding certifications, subcontractor information if applicable, and technical representative certifications as specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Section B Schedule of Supplies and Services Rev1.xls | XLS spreadsheet | |
| Solicitation Amendment 02.pdf | ||
| Attachment 4 - Request for Clarification Form Rev1.docx | DOCX document | |
| Solicitation Amendment 01.pdf | ||
| Attachment 5 - USCG Ombudsman Notice.pdf | ||
| Attachment 1 - Section B Schedule of Supplies and Services.xls | XLS spreadsheet | |
| Attachment 4 - Request for Clarification Form.docx | DOCX document | |
| BARBARA MABRITY DD FY20 Solicitation.pdf | ||
| Attachment 3 - Past Performance Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC BARBARA MABRITY (WLM 559)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2020
Developed By: Kyle P Wood
(Rev-0, 24 October 2019)
USCGC BARBARA MABRITY (WLM-175) DRYDOCK AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics - TENDER ......................................................................................................... xiii General Requirements WORK ITEM 1: Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect WORK ITEM 2: Tanks (Lube Oil), Clean and Inspect WORK ITEM 3: Voids (Accessible), Clean and Inspect WORK ITEM 4: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 5: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 6: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 7: Vent Ducts (Engine And Motor Room All), Commercial Cleaning WORK ITEM 8: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning WORK ITEM 9: Vent Ducts (Laundry Exhaust), Commercial Cleaning WORK ITEM 10: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 11: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift . 40 WORK ITEM 12: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 13: Hydraulic Chain Stoppers, Inspect and Service WORK ITEM 14: Hydraulic Crossdeck Winches, Inspect And Service WORK ITEM 15: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 16: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 17: Warping Capstan (Aft), Inspect and Service WORK ITEM 18: Single Point Davit, Inspect and Service WORK ITEM 19: Buoy Crane, Inspect And Service WORK ITEM 20: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 21: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 22: Sewage Piping, Clean And Flush WORK ITEM 23: Superstructure Surfaces (Buoy Deck Area), Preserve WORK ITEM 24: Buoy Crane Main Winch, CT Function, Remove WORK ITEM 25: Buoy Deck Cleats, Modify WORK ITEM 26: Crane Winch DCV, Replace WORK ITEM 27: Z-Drive Hydraulic Piping, Renew WORK ITEM 28: Fuel Transfer Stations, Renew WORK ITEM 29: Vent Duct Systems, Renew WORK ITEM 30: Main Drainage Valves, Renew & Overhaul WORK ITEM 31: Lube Oil and Waste Oil Stations, Renew WORK ITEM 32: Potable Water Deck Valves, Renew WORK ITEM 33: Sewage Deck Connections, Renew WORK ITEM 34: ASW & Fire Main Piping, Clean and Flush WORK ITEM 35: Fuel Piping, Renew WORK ITEM 36: Vent Spaces, Deck, Preserve WORK ITEM 37: Heat Pump System, Renew WORK ITEM 38: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 39: Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) WORK ITEM 40: Drydock WORK ITEM 41: Temporary Services, Provide - Cutter WORK ITEM 42: Forepeak Hull Plating Repair iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover Coast Guard Drawing 175 WLM 259-001, Rev A, Combustion Exhaust Diagram Coast Guard Drawing 175 WLM 259-005, Rev C, Combustion Exhaust A&D, Hull Block 970 Coast Guard Drawing 175 WLM 506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagram Coast Guard Drawing 175 WLM 512-001, Rev E, HVAC Diagram Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank
IIP:7-1
Coast Guard Drawing 175 WLM 549-001, Rev E, Onboard Lubrication Requirements Coast Guard Drawing 175 WLM 551-001, Rev J, Compressed Air System Diagram Coast Guard Drawing 175 WLM 561-001, Rev J, Z-Drive Hydraulic System Diagram Coast Guard Drawing 175 WLM 561-003, Rev H, Z-Drive Hydraulics A/D Hull Block 940, 950 Coast Guard Drawing 175 WLM 573-001, Rev T, Buoy Deck Arrangement Coast Guard Drawing 175 WLM 573-050, Rev A, Hydraulic Piping Installation for Chain Stopper Coast Guard Drawing 175 WLM 573-051, Rev B, Chain Stopper Structural Modifications for Hydraulic
Roller Assembly Coast Guard Drawing 175 WLM 573-8, Rev -, ATON Tie Downs Coast Guard Drawing 175 WLM 593-001, Rev G, Sewage & Waste Water System Diagram Coast Guard Drawing 175 WLM 593-009, Rev E, Independent Tanks, Sewage Holding Tank Coast Guard Drawing 175 WLM 601-001, Rev L, General Arrangement and Inboard and Outboard
Profiles Coast Guard Drawing 175 WLM 601-001, Rev P, General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-001, Rev R; General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564) Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564) Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection Coast Guard Drawing 175 WLM 801-001, Rev A, Hull Lines Coast Guard Drawing 175 WLM 801-003, Rev A, Curves of Form Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Drawing v (Rev-0)
Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels Coast Guard Drawing 175 WLM-528-001, Rev E, Plumbing and Interior Deck Drains Diagram Coast Guard Drawing 175-WLM 256-1, Rev H, Seawater Cooling System Diagram Coast Guard Drawing 175-WLM 256-12, Rev -, ASW System Piping Mods Coast Guard Drawing 175-WLM 262-1, Rev H, Lube Oil System Diagram Coast Guard Drawing 175-WLM 262-2, Rev G, Waste Oil System Diagram Coast Guard Drawing 175-WLM 437-7, Rev L, Buoy Dk Control Sys Block, ISO & Elem Wrg Diag Coast Guard Drawing 175-WLM 512-1, Rev D, HVAC Diagram Coast Guard Drawing 175-WLM 512-6, Rev C, HVAC A &D, Frame 24-6, Hull Block 910 Coast Guard Drawing 175-WLM 521-1, Rev H, Fire-main System Diagram Coast Guard Drawing 175-WLM 529-2, Rev G, Main Drainage System Diagram Coast Guard Drawing 175-WLM 533-1, Rev G, Potable Water System Diagram Coast Guard Drawing 175-WLM 533-5, Rev D, Potable Water System A/D Hull Block 970 Coast Guard Drawing 175-WLM 541-1, Rev H, Fuel Oil System Diagram Coast Guard Drawing 175-WLM 593-1, Rev G, Sewage & Waste Water System Diagram Coast Guard Drawing 175-WLM 593-10, Rev -, Sewage/Waste Water System Shore Tie Deck
Connection Mods Coast Guard Drawing 175-WLM 601-3, Rev C, Booklet of General Plans Coast Guard Drawing 175-WLM 512-1, Rev E, HVAC Diagram Coast Guard Drawing 175-WLM 516-004, Rev A, HVAC Refrigeration System Piping Arrangement &
Details Coast Guard Drawing 175-WLM 549-001, Rev E, Onboard Lubrication Requirements Coast Guard Drawing 175-WLM 556-1, Rev J, Hydraulic System Diagram Coast Guard Drawing 175-WLM 573-001, Rev T, Buoy Deck Arrangement Coast Guard Drawing 175-WLM 601-001, Rev T, General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175-WLM 601-003, Rev L, Booklet of General Plans Coast Guard Drawing 175-WLM 601-1, Rev G, General Arrangement, Inboard & Outboard Profile Coast Guard Drawing 175-WLM 801-01, Rev A, Hull Lines Coast Guard Drawing 175-WLM 801-02, Rev A, Booklet Of Mold Loft Offsets Coast Guard Drawing 175-WLM 801-13, Rev C, Midship Section & Typical Sections Coast Guard Drawing 175-WLM 801-19, Rev C, Shell Expansion Coast Guard Drawing 175-WLM 901-02, Rev F, Hull Block 901 Modules Coast Guard Drawing 175-WLM 901-04, Rev E, Hull Block 901 - Transverse Frames & Bhd Coast Guard Drawing 175-WLM 910-002, Rev H, Hull Block 910 Modules Coast Guard Drawing 175-WLM 990-001, Rev J, Hull Block Erection Plan Coast Guard Drawing 175-WLM_516-1, Rev F, HVAC REFRIGERATION SYSTEM PIPING
DIAGRAM
Coast Guard Drawing 175-WLM_516-3, Rev D, HVAC REFRIGERATION SYSTEM PIPING A & D Coast Guard Drawing 175-WLM_516-4, Rev -, HVAC REFRIGERATION PIPING ARRANGEMENT
& DETAILS
Coast Guard Drawing 175-WLM_601_1_T General Arrangement Inboard and Outboard Profiles Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain vi (Rev-0)
Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1- 1/4"
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1 Coast Guard Fleet Drawing FL-2605-029, Rev L, Chain Stopper System – Rising Sheave Assembly NAVSEA Drawing 2803-980209, Plates, Label NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (CG TP) 3632, Section 583-C, Sep 1999, Manufacturer's Instruction
Book-SWBS Groups 582-583, Slewing Arm Davit Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch - Model
No. D-WK-787 Coast Guard Technical Publication (TP) 3626, 12/16/1996; Manufacturers Instruction Book-SWBS
Group(s) 516-533 Coast Guard Technical Publication (TP) 3630, 07-JAN-97, Manufacturers Instruction Book-SWBS
Group(s) 573 Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS
Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463 Coast Guard Technical Publication (TP) 3632, Section 582-A, March 2014, Manufacturer's Instruction
Book-SWBS Groups 582-583, Aft Capstan Coast Guard Technical Publication (TP) 3653, Jul 2013; SWBS 245, Section A; Z-Drive – Model 1350-H Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper Coast Guard Technical Publication (TP) 3939, SWBS 573-A, Apr 2007, Rising Sheave Chain Stopper Coast Guard Technical Publication (TP) 5458, SWBS 555, Oct 2012, Winch, Radial – Model 50.2PT
(270 WMEC A-Class) Naval Sea Systems Command (NAVSEA) 0900-LP-060-4010, 1981, Fabrication, Welding & Inspection of Metal Boat & Craft Hulls Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, And Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems vii (Rev-0)
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and
Welding End Appleton Marine Control Valve Retrofit Manual 20793 ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN) ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric) MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets The American Bureau of Shipping (ABS), 2007, Guide for Shipbuilding and Repair Quality Standards for
Hull Structure During Construction (ABS Pub 87) The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 16 (SSPC-SP 16), 2010, Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-Ferrous Metals
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal viii (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning ix (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
13 N Repair Kit Assembly NSN: 2040-01-496-9418 2 ea. 1,968.67 13 N Rod Seal Repair Kit
(FL-2605-29 PC#37)
NSN: 2040-01-496-9422 2 ea. 3,030.07
13 N Repair Kit, Cable Chain (Includes Pads)
(FL-2605-29 PC#36)
NSN: 3020-01-538-0684 16 ea. 257.99
13 N Cylinder Assembly Actuating, Linear
NSN: 3040-01-496-9424 2 ea. 1,969.24
14 Y Hydraulic Brake Assembly
NSN: 2530-01-550-7474 4 ea. 399.00
14 N Winch Gear Box Assembly
NSN: 3010-01-F16-4570 PN:
SK9052AZ-SAEB-31.4-H1
(Nord Gear Corp) or YMD- 7914 (Appleton Marine Inc)
4 ea. 1,000.00
14 Y Hydraulic Motor NSN: 4320-01-470-8467 4 ea. 900.00 14 N Wire Rope NSN: 4010-01-620-9604 4 ea. 577.95 14 N Counter Balance Valve NSN: 4820-01-324-4269 8 ea. 107.50 14 N Shuttle Valve NSN: 4820-01-317-2748 8 ea. 34.78 14 N Needle Valve NSN: 4820-01-329-0051 4 ea. 38.00 14 Y Directional Control
Valve NSN: 4810-01-543-3252 4 ea. 3,465.17
14 N Electrical Connector, Hirshmann
NSN: 5935-01-640-6747 8 ea. 32.00
15 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00 15 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25 15 N Level wind pivot bushing NSN: 3120-01-621-2293 1 ea. 1,139.00
15 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
15 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29 15 N Rexroth Sandwich
Flow Control NSN: 4810-01-505-9289 1 ea. 250.00
15 N Sun Sandwich Relief Valves
NSN: 4820-01-439-2451 2 ea. 900.00
15 N Rexroth Tandem Center Proportional Directional Valve
NSN: 4810-01-506-3841 1 ea. 300.00
15 Y Level Wind Hydraulic Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
15 N 3:1 Pilot Ratio, Vented Counterbalance Valve
NSN: 4820-01-563-5841 1 ea 98.70 x (Rev-0)
Assembly 15 N Fully Adjustable
Needle Valve NSN: 4820-01-416-0579 1 ea 48.75
15 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00 15 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998 15 N **Pump, Hydraulic
Ram, Hand Driven NSN: 4320-01-286-4065 1 ea. 419.77
15 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00 15 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00 16 N Hardware Kit, Pins NSN: 2030-01-485-7209 2 ea. 528.47 16 N Hardware Kit, Mechanical NSN: 2030-01-485-7215 2 ea. 538.91
19 N Wire Rope, Crane Aux Fall
NSN: 3950-01-617-1692 1 ea 522.54
19 N Wire Rope, Crane Main Fall
NSN: 3950-01-617-1700 1 ea 1,275.49
19 N Luff Cylinder Seal kit NSN: 5330-01-433-6307 1 ea 357.99 19 N Holding Valve NSN: 4810-01-353-0586 2 ea 67.33 19 N Shuttle Valve NSN: 4820-01-317-2748 2 ea 24.32 19 N Needle Valve NSN: 4820-01-329-0051 1 ea 38.11 19 Y Valve Assembly, Manifold NSN: 4810-01-506-7738 1 ea. 19,892.60
19 N Bushing, Heel NSN: 5365-01-F12-2920 4 ea 67.00 19 N Hydraulic swivel seal kit NSN: 4730-01-566-2864 1 ea 1,298.00
19 N **Pin, Heel NSN: 5315-01-500-6931 2 ea 2,463.45 19 N **Hand pump w/
Stainless Steel Option, P18
NSN: 4320-01-517-1444 1 ea 1,724.57
19 N **Plate, Backing, Brake (Item 231 and
234)
NSN: 3040-00-119-9848 2 ea 1,500.40
19 N **Plate, Brake (Item 232)
NSN: 3040-01-068-7647 1 ea. 377.00
19 N **Driver Plate (Item 233)
NSN: 3040-01-F14-3994 1 ea. 138.34
19 N **Packing Assortment, Preformed
NSN: 5330-01-191-2622 1 ea. 10.94
19 N **Disc-Friction, Brake NSN: 3040-01-051-3606 1 ea. 15.74 19 N **Spring, Helical, Comp NSN: 5360-01-268-0044 12 ea 12.12
19 N **PD12C Seal kit NSN: 2590-01-398-5741 1 ea 147.76 19 N **Disc, Steel NSN: 2530-01-066-9585 1 ea 38.38 19 N **Master brake rebuild kit
NSN: 5330-01-F16-4572 PN:
98-015-3001 (Eskridge Inc)
3 ea 556.39
19 N **Aux Hoist Hook (Overhaul Ball)
NSN: 4030-01-572-3945 1 ea 2,800.00
19 Y **Block, Tackle NSN: 3940-01-566-2929 1 ea 3,806.87 19 N **Relief Valve NSN: 4820-01-481-7116 PN: 1 ea 117.35 xi (Rev-0)
Cartridge RPIC-LAN (Sun Hydraulics Inc)
19 N **Control Stand Selector Valve
Assembly
NSN: 4730-01-507-3516 1 ea 1,247.94
19 N **Bushing, Luff Cylinder
NSN: 3120-01-363-7629 4 ea 89.53
19 N **Pin, Luff Cylinder NSN: 5315-01-F12-2922 PN:
MMD-2232
2 ea 2,432.30
24 Y Main CT Winch NSN: 3950-01-419-1845 1 ea. 26,000.00 24 N Joystick Controller, Winch NSN: 3950-01-603-1550 1 ea 500.00
25 Y Cleat, Rope (15 in.
steel)
NSN: 2040-01-614-2587 2 ea. $281.66
26 N HDRAULIC
CONTROL VALVE
ASSEMBLY PARTS
KIT
PN: AMD-2633 ACN 4810-
01-F18-5588
1 15,061.00
37 Y Heat Pump #5 NSN: 4420-01-533-3937 1 ea. 9500.00 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
4 Hydraulically Operated Cargo Hatch, Inspect and Service
13 Hydraulic Chain Stoppers, Inspect and Service
14 Hydraulic Crossdeck Winches, Inspect And Service
15 Hydraulic Inhaul Winch, Inspect And Service
16 Mechanical Chain Stoppers, Inspect and Service
17 Warping Capstan (Aft), Inspect and Service
18 Single Point Davit, Inspect and Service
19 Buoy Crane, Inspect And Service
24 Buoy Crane Main Winch, CT Function, Remove
26 Crane Winch DCV, Replace
36 Vent Spaces, Deck, Preserve
42 Forepeak Hull Plating Repair xiii (Rev-0)
PRINCIPAL CHARACTERISTICS - TENDER
175' WLM, BUOY TENDER
PHYSICAL
Length overall 174' 8" Length between perpendiculars 155' 1" Depth 14' 8" Maximum beam 36' 0" Designed draft 8' 0" Mast height (above 8' waterline) 58' 8" Frame spacing 20" Full load displacement 855.15 Long Tons SW Light load displacement 719.78 Long Tons SW Minimum op condition displ 852.19 Long Tons SW
HULL
Hull material Steel
MACHINERY
Main propulsion Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM
Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM Reduction gears Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio Shaft seal John Crane Type ND Shaft bearings Five pedestal mounted, Cooper split roller bearings Number of propellers 2 Number of blades 4 Diameter 57.1" Rudders None; Z-drive Ship's service generators Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800
RPM
Emergency diesel generator One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM
TANK CAPACITIES
Diesel oil capacity (100%) 16,385 gal Fresh water capacity (100%) 7,339 gal Lubricating oil (100%) 86 gal
1 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
3 (Rev-0)
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
7 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
8 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
9 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
10 (Rev-0)
12310_0316_FLT
REC_12310_175’ WLM (ALL) (0310)
WORK ITEM 1: Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 - TANKS
TYPE OF TANK LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Hydaulic Oil-HPU Tank Hydraulic Equipment
RM 3-15-0-E
475 5
Hydraulic Oil-Single Point Davit
Propulsion Thruster Room
RM 3-88-0-E
95 5
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
11 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor shall accomplish the following for all designated tanks in paragraph 1.1 (Intent). Use Coast Guard Drawing 175 WLM 601-003 for guidance.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the TLI’s for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.
3.3 Tank contents. The Contractor shall remove and dispose of up to a total of 600 gallons of hydraulic oil. Upon completion of all authorized work, the Contractor shall renew the hydraulic fluid in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids) and equipment manufacturer recommendations.
NOTE
Vessel may come in with less tank fluid contents than specified above.
3.4 Plug log. The Contractor shall keep a written record of all plugs put in any tanks vents. A separate list shall be kept for each tank being entered.
3.4.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.4.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.
3.5 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
12 (Rev-0)
3.6 Tank content and waste disposal. The Contractor shall dispose of residual tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.7 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Tank level indicator (TLI) and/or float switch condition, as applicable.
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
3.8 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of all authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183, and renew any damaged or missing fasteners. For purpose of bid, assume 10% of existing fasteners will require renewal.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.9 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all designated tank TLI’s to be in satisfactory operating condition. Submit a CFR.
4. NOTES
4.1 The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.
13 (Rev-0)
12315_0617_FLT
REC_12310_FLT_175’ WLM (ALL) (0310)
WORK ITEM 2: Tanks (Lube Oil), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 – TANKS
TYPE OF TANK LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Lube Oil Storage 2-77-1-F 90 3
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
14 (Rev-0)
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
• Tank cover
• Piping
• Tank contents.
3.1.4.1 The Contractor shall remove up to a total of 100 gallons of lube oil. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.1.4.2 The Contractor shall stow all fluids in suitable stowage facility, immediately after removal, and re-stow all tank contents, upon completion of work. Contractor shall ensure lube oil quality is maintained throughout all stages of the process.
NOTE
Vessel may come in with less tank fluid contents than specified above.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the TLI’s for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Use Coast Guard Drawing 175 WLM 601-003 for guidance.
Submit a CFR.
3.3 Plug Log. The Contractor shall keep a written record of all plugs put in any tanks vents. A separate list shall be kept for each tank being entered.
3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.3.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.
3.4 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if
15 (Rev-0) applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.5 Tank content and waste disposal. The Contractor shall dispose of residual tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.6 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating (if applicable), including measurements taken, percentage, location, and type of coating failure.
• Tank level indicator (TLI) and/or float switch condition (as applicable).
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material (stainless steel) and condition.
3.7 Tank closing. The Contractor shall ensure that the tank(s) remain open for at least 24 hours after completion of all KO-authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all designated tank TLIs to be in satisfactory operating condition. Submit a CFR.
4. NOTES
4.1 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.
4.2 Tank inspection. The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.
16 (Rev-0)
12316_0617_FLT
REC_12316_FLT175’ WLM (ALL) (0813)
WORK ITEM 3: Voids (Accessible), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following void(s):
TABLE 1 - VOIDS
TYPE OF STRUCTURE LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Void 3-18-0-T 2,000 N/A
Void 3-52-0-V 5,000 N/A
Cargo Hold…